flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Milwaukee board approves rezoning for Western Hemisphere’s tallest mass timber building

Codes and Standards

Milwaukee board approves rezoning for Western Hemisphere’s tallest mass timber building

Mixed-use tower would rise 21 stories high.


By Peter Fabris, Contributing Editor | February 5, 2019

Courtesy Pixabay

The Milwaukee City Council’s City Plan Commission unanimously approved rezoning for a project that includes what could be the Western Hemisphere’s tallest mass timber structure.

The 21-story Ascent residential tower would use cast-in-place concrete for the first five floors and concrete shafts from top to bottom. A 15-story exposed mass-timber system that uses steel connectors would be installed on the base.

The architect says the mass-timber system could be installed in as little as four months. The design will feature up to 205 residential units and as much as 8,100 sf of first-floor commercial space.

Enclosed parking would be provided on four floors. Roof-top amenities would also be included. The project still must attain additional approvals.

Related Stories

| Sep 20, 2012

Smithtown, N.Y. considers bigger fines for building code violations

After a Suffolk County grand jury recommended stiffer fines for illegal demolitions, Smithtown, NY officials are weighing tougher penalties for developers who violate the town building code.

| Sep 20, 2012

AGC awarded federal grant to provide fall-protection safety program

The Associated General Contractors of America will continue to provide fall protection safety training next year after being awarded a federal safety grant.

| Sep 20, 2012

East Lansing officials accused of ignoring unauthorized project that led to partial building collapse

The unauthorized construction of a fifth-floor penthouse on a downtown East Lansing, Mich. mixed-use development led to a partial building collapse earlier this year.

| Sep 20, 2012

Reflective roofs could reduce rainfall in Arizona

Green standards may have to take into account the impact of reflective roofs on rainfall in the desert Southwest.

| Sep 20, 2012

Earth Advantage Institute offers green certification for small commercial buildings

Earth Advantage Institute announced a new green building certification aimed at new or substantially remodeled small commercial buildings built to green standards.

| Sep 14, 2012

To create more pedestrian-friendly neighborhoods, Chicago unveils safety plan

As more urban mixed-use and residential developments aim to encourage residents to walk and use mass transit, cities are addressing pedestrian safety.

| Sep 14, 2012

Worker killed in Brooklyn building collapse; overloaded floor decking blamed

One worker was killed after he and others plunged 40 feet through an unfinished upscale Brooklyn townhouse building.

| Sep 14, 2012

NRCA University offers photovoltaic class

NRCA University will offer a class called “Photovoltaic Roof Systems: Energizing Your Business” Oct. 16 in Philadelphia.

| Sep 14, 2012

Costa Rica’s strict building codes prevent major damage in powerful quake

The relatively little damage from a 7.6 earthquake was due in large part to strict building codes in Costa Rica, a country that has long enjoyed more stability, better governance, and stronger economic development than many of its Central American neighbors.

| Sep 14, 2012

Building codes should require continuous connection from roof to foundation, says IBHS chief

“One of the most effective ways to greatly increase a building’s strength and safety during hurricanes, tornadoes and straight-line windstorms is to be sure the building is tied together properly,” says Julie Rochman, president and CEO of the Insurance Institute for Business & Home Safety (IBHS).

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021