flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Life science construction completions will peak this year, then drop off substantially

Laboratories

Life science construction completions will peak this year, then drop off substantially

Slowdown due to softer economy, reduced venture capital, and fewer IPOs


By Peter Fabris, Contributing Editor | April 12, 2024
Image by Michal Jarmoluk from Pixabay - Life science construction completions will peak this year, then drop off substantially

Image by Michal Jarmoluk from Pixabay

There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE.

In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.

Much of the projected slowdown is due to a softer economy and reductions in venture capital investment and initial public offerings. Most of the construction scheduled for completion this year, 79%, is in the three largest biotech hubs: Boston, the San Francisco Bay Area, and San Diego.

The potential for a high vacancy rate in those areas is greatest, while supply and demand is expected to remain more balanced in the 10 other primary markets. The average vacancy rate in the 13 markets stood at 10.6% as of the third quarter of 2023.

Related Stories

Architects | Aug 5, 2021

Lord Aeck Sargent's post-Katerra future, with LAS President Joe Greco

After three years under the ownership of Katerra, which closed its North American operations last May, the architecture firm Lord Aeck Sargent is re-establishing itself as an independent company, with an eye toward strengthening its eight practices and regional presence in the U.S.

Laboratories | May 6, 2021

The big shift: How laboratory design should respond to personalized medicine

Crucial to the success of personalized medicine is the “big shift” away from large-scale pharmaceutical manufacturing to small-scale lab manufacturing.

Laboratories | Mar 10, 2021

8 tips for converting office space to life sciences labs

Creating a successful life sciences facility within the shell of a former office building can be much like that old “square peg round hole” paradigm. Two experts offer important advice.

Laboratories | Jan 14, 2021

New hub for Danish robot developers unveiled

3XN designed the project.

Giants 400 | Dec 3, 2020

2020 Science & Technology Facilities Giants: Top architecture, engineering, and construction firms in the S+T sector

HDR, Jacobs, and Turner head BD+C's rankings of the nation's largest science and technology (S+T) facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

Giants 400 | Dec 3, 2020

2020 Laboratory Facilities Sector Giants: Top architecture, engineering, and construction firms in the U.S. laboratory facilities sector

Affiliated Engineers, HDR, and Skanska top BD+C's rankings of the nation's largest laboratory facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

Laboratories | Nov 16, 2020

Washington State University’s new Plant Sciences Building opens

LMN Architects designed the project.

AEC Tech Innovation | Sep 18, 2020

New Innovation Center should heighten Port San Antonio’s tech profile

The facility will include a 2,500-seat arena and serve as new home for the city’s S&T museum.

Laboratories | Aug 25, 2020

Video: What's driving the boom in life sciences real estate?

JLL's Audrey Symes discusses the drivers of growth across the nation's life sciences cluster hubs.

Laboratories | Jul 24, 2020

Customized labs give universities a recruiting edge

CO Architects is among a handful of firms that caters to this trend.

boombox1 - default
boombox2 -
native1 -

More In Category


Laboratories

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021