In April, the Colburn School, an institute for music and dance education and performance, will break ground on a 100,000-sf expansion designed by architect Frank Gehry. Located in downtown Los Angeles, the performing arts center will join the neighboring Walt Disney Concert Hall and The Grand by Gehry, forming the largest concentration of Gehry-designed buildings in the world.
“This has been a long time in the making. The Colburn School expansion is a much-needed project for the community,” famed architect Frank Gehry said in a press statement. “I hope that it will be well-used and well-loved by the students of the Colburn School and the other cultural institutions of Los Angeles.”
The Colburn School provides music and dance education at all levels of development, from children as young as 7 months old to adults. Each week, the downtown L.A. campus welcomes about 10,000 people, and each year, over 2,000 students from around the world study at Colburn.
The new building, the Colburn Center, will be adjacent to Colburn’s Grand Avenue campus. In addition to training and performance facilities for music and dance, the Colburn Center will provide a concert hall for the region’s performing arts organizations—downtown L.A.’s first midsized concert hall, according to the Colburn School. The 1,000-seat, 17,200-sf hall will feature an in-the-round design, an orchestra pit, and a stage that can accommodate large-scale works.
Frank Gehry hopes to strengthen L.A.’s classical music community
“Our goal for this hall is that it will help strengthen the already robust classical music community here, solidifying Los Angeles’ leadership in this arena,” Gehry said.
The Colburn Center will more than double the facilities for the school’s Trudl Zipper Dance Institute, including a 100-seat theater for dance and four professional-sized studios for dance instruction and rehearsal.
The building’s new rooftop garden will be large enough for receptions and outdoor performances, while a ground-level garden will have a performance space that will be open to the public.
According to the press statement, Gehry’s design is “conceived as an ensemble of interlocking volumes, each of which houses a distinct program while interacting dynamically with the whole, the new Colburn Center will be built into a terrain that slopes down from Olive Street to Hill Street and clad in a pink metallic finish. The components are knit together by an expansive light-filled entrance and a pair of gardens planted at street and rooftop level.”
To date, gifts to the Colburn School total about $315 million toward its $400 million Building Our Future campaign. The campaign will cover about $335 million in construction costs and $65 million in endowment and operating costs for the Colburn Center and the Colburn School.
The performing arts center is expected to reach substantial completion in early 2027.
On the Building Team:
Owner: The Colburn School
Architect: Gehry Partners
Civil engineer: KPFF
MEP engineer: ARC Engineering
Structural engineer: Magnusson Klemencic Associates
Contractor: McCarthy
Related Stories
| Sep 22, 2014
4 keys to effective post-occupancy evaluations
Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.
| Sep 22, 2014
Sound selections: 12 great choices for ceilings and acoustical walls
From metal mesh panels to concealed-suspension ceilings, here's our roundup of the latest acoustical ceiling and wall products.
| Sep 9, 2014
Using Facebook to transform workplace design
As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.
| Sep 3, 2014
New designation launched to streamline LEED review process
The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.
| Sep 2, 2014
Ranked: Top green building sector AEC firms [2014 Giants 300 Report]
AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms.
| Aug 25, 2014
Ranked: Top cultural facility sector AEC firms [2014 Giants 300 Report]
Arup, Gensler, and Turner head BD+C's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2014 Giants 300 Report.
| Jul 28, 2014
Reconstruction market benefits from improving economy, new technology [2014 Giants 300 Report]
Following years of fairly lackluster demand for commercial property remodeling, reconstruction revenue is improving, according to the 2014 Giants 300 report.
| Jul 28, 2014
Reconstruction Sector Construction Firms [2014 Giants 300 Report]
Structure Tone, Turner, and Gilbane top Building Design+Construction's 2014 ranking of the largest reconstruction contractor and construction management firms in the U.S.
| Jul 28, 2014
Reconstruction Sector Engineering Firms [2014 Giants 300 Report]
Jacobs, URS, and Wiss, Janney, Elstner top Building Design+Construction's 2014 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.
| Jul 28, 2014
Reconstruction Sector Architecture Firms [2014 Giants 300 Report]
Stantec, HDR, and HOK top Building Design+Construction's 2014 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.