Owners of buildings in hurricane zones want to minimize damage and get tenants back in their homes or offices as soon as possible after a storm. So the onus is on the Building Team to find, specify, and—when necessary—engineer products and systems to ever-higher standards. The powerful hurricanes of the past 20 years have resulted in more stringent building codes and standards as well as more rigorous product testing.
In Florida, for example, the Miami-Dade County Building Department issues a Notice of Acceptance (NOA) to products only after they’ve passed intensive tests that simulate the effects of high-velocity hurricanes. The Miami–Dade list is a good place to start when selecting products for a building in a hurricane zone, says Bryan Karsky, AIA, LEED AP, executive vice president of Collman & Karsky Architects in Tampa, Fla. “You’re dealing with assemblies and testing that already give you a baseline for the level of hurricane hardening or wind resistance,” says Karsky. But bear in mind that additional engineering will be needed in areas where wind speeds can reach Category 4 (sustained winds of 131 to 155 mph) or Category 5 (sustained winds greater than 155 mph).
Let’s take a look at four building products that have been recently put to the test and approved for use in hurricane zones.
Wellbilt’s Sure-Board Wall Panel
Bilco’s Type S and Type NB steel and aluminum hatches
Related Stories
Security and Life Safety | Mar 26, 2024
Safeguarding our schools: Strategies to protect students and keep campuses safe
HMC Architects' PreK-12 Principal in Charge, Sherry Sajadpour, shares insights from school security experts and advisors on PreK-12 design strategies.
Green | Mar 25, 2024
Zero-carbon multifamily development designed for transactive energy
Living EmPower House, which is set to be the first zero-carbon, replicable, and equitable multifamily development designed for transactive energy, recently was awarded a $9 million Next EPIC Grant Construction Loan from the State of California.
Museums | Mar 25, 2024
Chrysler Museum of Art’s newly expanded Perry Glass Studio will display the art of glassmaking
In Norfolk, Va., the Chrysler Museum of Art’s Perry Glass Studio, an educational facility for glassmaking, will open a new addition in May. That will be followed by a renovation of the existing building scheduled for completion in December.
Sustainability | Mar 21, 2024
World’s first TRUE-certified building project completed in California
GENESIS Marina, an expansive laboratory and office campus in Brisbane, Calif., is the world’s first Total Resource Use and Efficiency (TRUE)-certified construction endeavor. The certification recognizes projects that achieve outstanding levels of resource efficiency through waste reduction, reuse, and recycling practices.
Office Buildings | Mar 21, 2024
Corporate carbon reduction pledges will have big impact on office market
Corporate carbon reduction commitments will have a significant impact on office leasing over the next few years. Businesses that have pledged to reduce their organization’s impact on climate change must ensure their next lease allows them to show material progress on their goals, according to a report by JLL.
Adaptive Reuse | Mar 21, 2024
Massachusetts launches program to spur office-to-residential conversions statewide
Massachusetts Gov. Maura Healey recently launched a program to help cities across the state identify underused office buildings that are best suited for residential conversions.
Legislation | Mar 21, 2024
Bill would mandate solar panels on public buildings in New York City
A recently introduced bill in the New York City Council would mandate solar panel installations on the roofs of all city-owned buildings. The legislation would require 100 MW of solar photovoltaic systems be installed on public buildings by the end of 2025.
Office Buildings | Mar 21, 2024
BOMA updates floor measurement standard for office buildings
The Building Owners and Managers Association (BOMA) International has released its latest floor measurement standard for office buildings, BOMA 2024 for Office Buildings – ANSI/BOMA Z65.1-2024.
Healthcare Facilities | Mar 18, 2024
A modular construction solution to the mental healthcare crisis
Maria Ionescu, Senior Medical Planner, Stantec, shares a tested solution for the overburdened emergency department: Modular hub-and-spoke design.