As more students enter the school system each year, designing for fire safety in educational facilities has never been more critical. Fire-rated glazing can be a key part of the solution. With proper specification, it can defend against the spread of fire, resist impact from rambunctious students and transfer natural light into learning areas, which can improve student performance.1
A case in point is the design and development of an egress stairwell in Concord, New Hampshire's Mill Brook Elementary School. To support the school’s vision for developing a multi-use “learning corridor” that brings education beyond the classroom, HMFH Architects designed the fire-rated stairwell to be bright and open, reflecting the playful energy of students. They achieved this goal by pairing Fireframes® Aluminum Series fire-resistant frames with Pilkington Pyrostop® fire-resistant glass, both supplied by Technical Glass Products (TGP).
Rather than the bulky, wrap-around frames often associated with traditional fire-rated framing systems, the Fireframes Aluminum Series fire-rated frames have slender profiles that can be custom wet painted, anodized or powder coated in nearly any color. In this application, the narrow fire-rated frames were powder coated a bright purple to match the interior color scheme—a key aesthetic benefit since learning areas are integrated into public spaces outside student classrooms.
Pilkington Pyrostop fire-resistant glazing allowed the design team to incorporate unrestricted amounts of transparent glazing in the stairwell to improve light transfer. The product also offers fire-ratings of up to two hours, and blocks the transfer of radiant heat, providing essential protection should students need to exit the building during a fire. Pilkington Pyrostop meets the impact requirements of CPSC 16CFR1201 Category I and/or Category II – a critical performance benefit for glass used in busy stairwells.
TGP’s Fireframes Aluminum Series fire-rated frames with Pilkington Pyrostop transparent fire-rated glazing also proved beneficial during the renovation of Johnson & Wales University Center for Physician Assistant Studies. The building’s lack of openness and accessibility to the street was a concern for DBVW Architects during the design phase. “The original main entrance to the building was not handicap accessible and not as grand as we envisioned for Johnson & Wales’ new Physician Assistant Program,” explains Sean Redfern, associate principle for DBVW Architects.
Bright purple fire-rated egress stairwell at Mill Brook Elementary School
For the lobby and stairs to satisfy building codes and successfully work together to create a clear circulation path for students and faculty entering the school, DBVW Architects paired the Fireframes Aluminum Series fire-rated frames with Pilkington Pyrostop transparent fire-rated glazing.
“Together, the thin profile design of TGP’s Fireframes Aluminum Series fire-rated frames and clear Pilkington Pyrostop fire-rated glass helped us achieve the transparency and fire protection we were looking for in the space,” explains Sean Redfern, associate principle for DBVW Architects. “Using fire rated glass for an entire exit stair enclosure isn’t something you see every day. But the openness that TGP’s fire-rated frames and glass created fit well with our design aspirations.”
For more information on how to select first-class glass solutions that can support fire and life safety protection and student wellbeing goals in schools, please visit fireglass.com.
1Sapna Cheryan, Sianna A. Ziegler, Victoria C. Plaut, and Andrew N. Meltzoff. Designing Classrooms to Maximize Student Achievement. Policy Insights from the Behavioral and Brain Sciences, 2014
Windows and Classrooms: A Study of Student Performance and the Indoor Environment, a 2003 study conducted by the Heschong Mahone Group.
Technical Glass Products
800.426.0279
800.451.9857 – fax
sales@fireglass.com
www.fireglass.com
Related Stories
Market Data | Aug 1, 2023
Nonresidential construction spending increases slightly in June
National nonresidential construction spending increased 0.1% in June, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau. Spending is up 18% over the past 12 months. On a seasonally adjusted annualized basis, nonresidential spending totaled $1.07 trillion in June.
K-12 Schools | Jul 31, 2023
Austin’s new Rosedale School serves students with special needs aged 3 to 22
In Austin, the Rosedale School has opened for students with special needs aged 3 to 22. The new facility features sensory rooms, fully accessible playgrounds and gardens, community meeting spaces, and an on-site clinic. The school serves 100 learners with special needs from across Austin Independent School District (ISD).
Market Data | Jul 24, 2023
Leading economists call for 2% increase in building construction spending in 2024
Following a 19.7% surge in spending for commercial, institutional, and industrial buildings in 2023, leading construction industry economists expect spending growth to come back to earth in 2024, according to the July 2023 AIA Consensus Construction Forecast Panel.
School Construction | Jun 29, 2023
K-12 school construction: 5 ways strong community relations can lead to success
When constructing a K-12 school, building positive relationships with the community—including students, parents, school staff and residents—is critical to the success of the project. Here are five ways Skanska puts the community first when building K-12 schools in the Pacific Northwest.
Standards | Jun 26, 2023
New Wi-Fi standard boosts indoor navigation, tracking accuracy in buildings
The recently released Wi-Fi standard, IEEE 802.11az enables more refined and accurate indoor location capabilities. As technology manufacturers incorporate the new standard in various devices, it will enable buildings, including malls, arenas, and stadiums, to provide new wayfinding and tracking features.
Engineers | Jun 14, 2023
The high cost of low maintenance
Walter P Moore’s Javier Balma, PhD, PE, SE, and Webb Wright, PE, identify the primary causes of engineering failures, define proactive versus reactive maintenance, recognize the reasons for deferred maintenance, and identify the financial and safety risks related to deferred maintenance.
K-12 Schools | Jun 5, 2023
How to achieve cost-effective kindergarten classrooms
Educational architect Robin Randall shares realistic advice about the challenges of adding developmentally appropriate, play-based kindergarten classrooms while respecting budget limitations.
K-12 Schools | May 30, 2023
K-12 school sector trends for 2023
Budgeting and political pressures aside, the K-12 school building sector continues to evolve. Security remains a primary objective, as does offering students more varied career options.
K-12 Schools | May 25, 2023
From net zero to net positive in K-12 schools
Perkins Eastman’s pursuit of healthy, net positive schools goes beyond environmental health; it targets all who work, teach, and learn inside them.
K-12 Schools | May 22, 2023
The revival of single-building K-12 schools
Schools that combine grades PK through 12 are suddenly not so uncommon. Education sector experts explain why.