Metsä Wood, a Finland-based manufacturer of engineered wood products, says its sustainable, material-efficient products can store carbon for decades, helping to combat climate change.
To build its new concrete plant of 17,000 square meters, German construction specialist Brüninghoff, which makes prefabricated wooden materials, such as laminated veneer lumber, wanted to use materials that fit its sustainability strategy. So the company chose Kerto LVL—prefabricated panels and studs made by Metsä Wood—for the plant’s exterior non-load-bearing walls. The panels were attached to load-bearing concrete frames.
Metsä Wood’s Kerto LVL, a structural laminated veneer lumber, takes up less volume than other wood materials and also has an excellent strength-to-weight ratio. In addition to supporting the sustainability strategy, Kerto LVL led to optimized assembly times.
The Brüninghoff plant has a total of 239 wall elements with an area of around 5,000 square meters. It used a total of 242 cubic meters of Kerto LVL. The team used a carbon storage calculator to determine that the Kerto LVL stores 165.8 metric tons of carbon dioxide equivalent (a unit based on global warming potential)—meaning that, compared to other construction materials, the wood in Metsä Wood’s product is “highly sustainable,” the company says.
“Through this construction, we are forcing structural change towards construction that supports circular economy. Change is needed as the construction sector is responsible for consuming huge quantities of resources. It is a question of optimizing construction methods, developing low-emission concepts, and increasingly backing recycling solutions,” Frank Steffens, managing director, Brüninghoff, said in a statement.
The building has already received pre-certification per the ecological, economic, and social criteria of the German Society for Sustainable Construction (DGNB).
Related Stories
| May 31, 2012
Perkins+Will-designed engineering building at University of Buffalo opens
Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| Apr 27, 2012
APA launches wood design web portal for building and design pros
Design professionals who are members of APA’s Professional Associates are automatically enrolled in the APA Designers Circle program.
| Apr 26, 2012
Energy efficiency requirements heighten the importance of proper protection for roofing systems
Now more than ever, a well-insulated and well protected roof is critical in new or renovated commercial buildings.
| Apr 16, 2012
Drake joins EYP as science and technology project executive
Drake’s more than 30 years of diversified design and project delivery experience spans a broad range of complex building types.
| Feb 26, 2012
Milwaukee U-Haul facility receives LEED-CI Silver
The new elements of the facility now include: efficient lighting with day-lighting controls and occupancy sensors, a high-efficiency HVAC system used in conjunction with a newly constructed thermal envelope to help reduce energy consumption, and the installation of low-flow fixtures to reduce water consumption.
| Feb 10, 2012
Task force addresses questions regarding visually graded Southern Pine lumber
Answers address transition issues, how to obtain similar load-carrying capabilities, and why only some grades and sizes are affected at this time.
| Feb 2, 2012
Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012
Winning projects will be featured in the May issue of BD+C.
| Feb 1, 2012
New ways to work with wood
New products like cross-laminated timber are spurring interest in wood as a structural material.