Dubai Holding has recently unveiled details and renderings for the planned Burj Jumeira, a 550-meter-tall (1,804 feet) tower in Al Sufouh. The tower will be the centerpiece of Downtown Jumeira, a pedestrian friendly mixed-use urban destination.
The tower’s design is inspired by the ripples of the UAE’s desert sand dunes and flowing oases. The façade will be covered with digital displays that can be used to customize the building’s appearance for various occasions and celebrations.
Rendering courtesy Dubai Holding.
See Also: AS+GG-designed tower will be the tallest in China
The base of the tower is a reflecting pool that can be reconfigured into a staging structure to host various social, cultural, and artistic events and activities. It will feature multiple water fountains and a terraced outdoor amphitheater. A fully integrated retail component will surround Burj Jumeira’s base.
The tower will comprise multiple observation decks that provide 360-degree views of Dubai. The observation decks will include interactive experiences with the main viewing platform accessible via lifts with digital screens that carry the visitor through a distinctive experience until they reach the desired platform.
Rendering courtesy Dubai Holding.
At the Burj Jumeira’s summit is the crown, a 450-meter-high (1,476 feet) space that includes a sky-lounge and interconnected sky-restaurant. The space can be used to host larger scale events and includes similar technologies as the observation decks to create fully immersive and interactive displays.
SOM designed the tower. Completion of the project's first phase is slated for 2023.
Rendering courtesy Dubai Holding.
Rendering courtesy Dubai Holding.
Rendering courtesy SOM | ATCHAIN.
Rendering courtesy SOM | ATCHAIN.
Rendering courtesy SOM | ATCHAIN.
Related Stories
| Apr 24, 2012
ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014
Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.
| Apr 23, 2012
Innovative engineering behind BIG’s Vancouver Tower
Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.
| Apr 10, 2012
Moriarty & Associates selected as GC for Miami’s BrickellHouse Condo
Construction of the 46-story development is schedule to get underway this summer and be completed in 2014.
| Apr 6, 2012
Flat tower green building concept the un-skycraper
A team of French designers unveil the “Flat Tower” design, a second place winner in the 2011 eVolo skyscraper competition.
| Apr 4, 2012
Bald joins the Harmon glazing team
Bald has 13 years of experience in the glazing industry, coming to Harmon from Trainor where he was the regional manager of the Mid-Atlantic region.
| Apr 2, 2012
Mitsubishi unveils ultra-high-speed elevator for Shanghai skyscraper
The operation of the elevator is scheduled to begin in 2014.
| Mar 27, 2012
Bank of America Plaza becomes Atlanta's priciest repo
Repo will help reset market prices for real estate, and the eventual new owner will likely set rental rates at a new or near the bottom and improve the facilities to lure tenants.
| Mar 26, 2012
McCarthy tops off Math and Science Building at San Diego Mesa College
Designed by Architects | Delawie Wilkes Rodrigues Barker, the new San Diego Mesa College Math and Science Building will provide new educational space for students pursuing degree and certificate programs in biology, chemistry, physical sciences and mathematics.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.
| Mar 14, 2012
Hearing to decide fate of unfinished Harmon in Las Vegas under way
The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.