flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Danish hospital is constructed from 24 steel frame modules

Modular Building

Danish hospital is constructed from 24 steel frame modules

Onsite construction was completed in two weeks.


By David Malone, Associate Editor | March 17, 2020
MARS Radiology equipment in modules

All photos courtesy FortaPRO

Forta PRO, a Latvian-based modular construction company, and MT Højgaard, a Danish construction company, recently completed the MARS Satellite Radiology Clinic building in Copenhagen, Denmark. The new clinic will provide additional acute care services to patients for faster and more advanced medical research.

The MARS clinic was built as a modular building off-site in Latvia and then shipped across the Baltic Sea to the assembly location. It combines 24 steel frame modules weighing up to 27 tons each. The most substantial blocks are equipped with all the necessary protection systems to provide safe and efficient operation for quicker patient diagnostics. The modules were designed to fit the most modern medical equipment such as X-Ray, CT, and MRI scanners.

 

FortaPRO module being lifted into place

 

Onsite construction was completed in only two weeks without disrupting neighboring working clinical departments or blocking traffic pathways for ambulances. By assembling the modules in a factory, onsite dust and noise was mitigated as compared to traditional construction.

 

See Also: China builds 645,000-sf coronavirus hospital in 10 days

 

 

MARS Radiology clinic exterior

Related Stories

| May 30, 2018

Accelerate Live! talk: From micro schools to tiny houses: What’s driving the downsizing economy?

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), micro-buildings design expert Aeron Hodges, AIA, explores the key drivers of the micro-buildings movement, and how the trend is spreading into a wide variety of building typologies.

Modular Building | Jan 12, 2017

The largest modular construction hotel project in New York City is starting to get pieced together

The hotel’s 300 rooms are made from 210 prefabricated pods from Polcom Modular.

Building Materials | Jan 9, 2017

Architects and researchers are developing new techniques for building in space

As setting foot on Mars becomes a more realistic goal, the search for how to best develop Architecture for the Red Planet is heating up.

Modular Building | Jul 22, 2016

PNC Bank’s 'Tiny Branch' opens on West Virginia University campus

The new branch doesn’t need much space for its ATM and new accounts and personal loans services.

Transit Facilities | Jun 12, 2016

Philippines’ oldest city getting its first public bus system

New York-based CAZA designed the modular bus stops with the city’s extreme weather conditions in mind.

Modular Building | May 17, 2016

Oklahoma’s first modular hotel will begin construction next month

Guerdon Modular Buildings will produce 81 modules for this project. 

Modular Building | Feb 26, 2016

CHPS releases new program, first model for prefab modular classrooms

Provides standards for indoor air quality, energy efficiency, materials, and waste management.

Game Changers | Feb 5, 2016

Asia’s modular miracle

A prefab construction company in China built a 57-story tower in 19 days. Here’s how they did it.  

Game Changers | Feb 4, 2016

GAME CHANGERS: 6 projects that rewrite the rules of commercial design and construction

BD+C’s inaugural Game Changers report highlights today’s pacesetting projects, from a prefab high-rise in China to a breakthrough research lab in the Midwest.

Modular Building | Feb 1, 2016

Hotel developers turn to modular construction to meet demand

A $90 million rebuilding project in Yellowstone National Park exemplifies this trend.

boombox1
boombox2
native1

More In Category

Contractors

Contractors expect to spend more time on prefabrication, according to FMI study

Get ready for a surge in prefabrication activity by contractors. FMI, the consulting and investment banking firm, recently polled contractors about how much time they were spending, in craft labor hours, on prefabrication for construction projects. More than 250 contractors participated in the survey, and the average response to that question was 18%. More revealing, however, was the participants’ anticipation that craft hours dedicated to prefab would essentially double, to 34%, within the next five years.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021