flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Composite siding revivifies Ohio luxury community

Products and Materials

Composite siding revivifies Ohio luxury community

Following severe hailstorm damage, this Sandusky, Ohio, community replaces its high-maintenance cedar siding with a composite solution.


By BD+C Staff | April 10, 2017

Photos: Chelsea Building Products

The Harbour, a 188-unity luxury condo community on the shores of Lake Erie, in Sandusky, Ohio, got belted with hailstorms in 2008 and 2010. The cedar siding on many of the buildings was unrepairable and unsightly. The homeowner association contracted Mid Ohio Improvements to replace the cedar with Everlast Advanced Composite Siding in Seaside Gray. The color is inherent in the composition of the panels, so painting is never required.

Everlast is produced from a proprietary formulation of inorganic minerals, polymeric resins, and acrylic colorants. Unlike other siding products on the market, the color is inherent in its composition—not painted on—which means that the siding will never need to be re-painted, and will remain beautiful for the lifetime of the building.

“For the past 17 years, the biggest problem we’ve had on the property is the cedar siding,” says Bob Morrow, Property Manager. “By putting this product on our buildings, it alleviates the problem with the maintenance of having to repaint every four or five years.”

 

Related Stories

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Dec 5, 2011

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Dec 2, 2011

Legrand joins White House initiative to spur energy efficiency in commercial buildings

Company agrees to aggressive energy savings and reporting.

| Dec 1, 2011

Nauset Construction breaks ground on Massachusetts health care center

The $20 million project is scheduled to be completed by December 2012. 

| Dec 1, 2011

Ground broken on first LEED Platinum designed school house built by volunteers

Phoenix public school receives the generous gift of a state-of-the-art building for student and community use.

| Dec 1, 2011

VLK Architects’ office receives LEED certification

The West 7th development, which houses the firm’s office, was designed to be LEED for Core & Shell, which gave VLK the head start on finishing out the area for LEED Silver Certification CI.

| Nov 29, 2011

First EPD awarded to exterior roof and wall products manufacturer

EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact. 

| Nov 29, 2011

Report finds credit crunch accounts for 20% of nation’s stalled projects

Persistent financing crunch continues to plague design and construction sector.

| Nov 29, 2011

SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China

Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021