flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Average age of U.S. school buildings is just under 50 years

K-12 Schools

Average age of U.S. school buildings is just under 50 years

About half of schools have never had a major renovation


By Peter Fabris, Contributing Editor  | February 29, 2024
Photo by Mary Taylor

Photo by Mary Taylor

The average age of a main instructional school building in the United States is 49 years, according to a survey by the National Center for Education Statistics (NCES)

About 38% of schools were built before 1970. Roughly half of the schools surveyed have undergone a major building renovation or addition. Of those that have been renovated, the average age of the renovation was 14 years.

Major repair, renovation, or modernization work was being performed in 21% of all public schools surveyed as of December 2023. Indoor air quality is a major focus for many schools, with 39% having an indoor air quality coordinator on campus. This position is responsible for monitoring air quality conditions at the school and reporting air quality issues and complaints.

Some 60% of schools have designated vehicle loading and unloading areas at least 25 feet from all building air intakes, including doors and windows. Eighteen % of schools have an anti-idling program that includes signage and active monitoring during pick-up and drop-off times.

Some 31% of public schools have one or more non-permanent (portable) buildings in use.

Here are other findings from the NCES public school building survey:

The average age of the main instructional building is 49 years old. The following %ages of reporting public schools’ main instructional buildings were built during the following time periods:

  • Pre-1970: 38%
  • 1970 – 1999: 21%
  • 2000 – present: 20%

Nearly all public schools (93%) reported having some kind of athletic amenities on-site. The most commonly reported types of facilities were:

  • A gymnasium (69%)
  • All-purpose grass field (68%)
  • Outdoor basketball court (56%)
  • Baseball/softball field (38%)
  • Weight room (29%)
  • Outdoor track (28%)

Most public schools have dedicated library space available (89%).

Compared to the national estimate (89%), higher percentages of public schools with the following characteristics reported having dedicated library space available:

  • With 500-999 students (96%)
  • With a student body made up of 0-25% students of color (96%)
  • In rural areas (94%)
  • With 300-499 students (93%)
  • Elementary schools (93%)
  • In low-poverty neighborhoods (92%)

Compared to the national estimate (89%), lower percentages of public schools with the following characteristics reported having dedicated library space available:

  • In cities (84%)
  • In high-poverty neighborhoods (81%)
  • With a student body made up of 76% or more students of color (80%)
  • High/secondary schools (80%)
  • With 0-299 students (77%)

Related Stories

| Mar 5, 2012

Perkins Eastman pegs O’Donnell to lead K-12 practice

O’Donnell will continue the leadership and tradition of creative design established by firm Chairman and CEO Bradford Perkins FAIA, MRAIC, AICP in leading this market sector across the firm’s 13 offices domestically and internationally.

| Dec 27, 2011

USGBC’s Center for Green Schools releases Best of Green Schools 2011

Recipient schools and regions from across the nation - from K-12 to higher education - were recognized for a variety of sustainable, cost-cutting measures, including energy conservation, record numbers of LEED certified buildings and collaborative platforms and policies to green U.S. school infrastructure.

| Dec 5, 2011

RJM Construction begins building Nova Classical Academy in St. Paul

As the general contractor, RJM is constructing the 94,000-sf building that will consolidate the St. Paul school’s two other locations. 

| Sep 23, 2011

Under 40 Leadership Summit

Building Design+Construction’s Under 40 Leadership Summit takes place October 26-28, 2011 Hotel at the Monteleone in New Orleans. Discounted hotel rate deadline: October 2, 2011.  

| Sep 12, 2011

LACCD’s $6 billion BIM connection

 The Los Angeles Community College District requires every design-build team in its massive modernization program to use BIM, but what they do with their 3D data after construction is completed may be the most important change to business as usual.

| Jul 22, 2011

Five award-winning modular innovations

The Modular Building Institute's 2011 Awards of Distinction highlight fresh ideas in manufactured construction projects.

| May 18, 2011

Former Bronx railyard redeveloped as shared education campus

Four schools find strength in numbers at the new 2,310-student Mott Haven Campus in New York City. The schools—three high schools and a K-4 elementary school—coexist on the 6.5-acre South Bronx campus, which was once a railyard.

| May 18, 2011

Eco-friendly San Antonio school combines history and sustainability

The 113,000-sf Rolling Meadows Elementary School in San Antonio is the Judson Independent School District’s first sustainable facility, with green features such as vented roofs for rainwater collection and regionally sourced materials.

| May 18, 2011

New Reform Jewish Independent school opens outside Boston

The Rashi School, one of only 17 Reform Jewish independent schools in North American and Israel, opened a new $30 million facility on a 166-acre campus shared with the Hebrew SeniorLife community on the Charles River in Dedham, Mass.

boombox1 - default
boombox2 -
native1 -

More In Category

K-12 Schools

Inclusive design strategies to transform learning spaces

Students with disabilities and those experiencing mental health and behavioral conditions represent a group of the most vulnerable students at risk for failing to connect educationally and socially. Educators and school districts are struggling to accommodate all of these nuanced and, at times, overlapping conditions.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021