flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Army Corps of Engineers moves into new engineering and support center

Government Buildings

Army Corps of Engineers moves into new engineering and support center

The building, in Huntsville, Ala., combines office and warehouse spaces.


By John Caulfield, Senior Editor | January 29, 2024
Redstone Gateway 300 building training room
A training room is one of the spaces inside the new Huntsville Center in Alabama. The new Redstone Gateway 300 building will allow the Army Corps of Engineers to consolidate its workforce in the state. Images: Courtesy of Robins & Morton

Earlier this month, the U.S. Army Engineering and Support Center, on Redstone Arsenal in Huntsville, Ala., opened, enabling the Army Corps of Engineers’ Huntsville Center to consolidate its workforce into one building.

The three-story Redstone Gateway 300 building, which broke ground on Nov. 5, 2021, features 200,000 sf of Class A office space and 15,000 sf of warehouse space that was constructed with concrete tilt-up wall panels. The facility combines private and open office areas, collaborative spaces, a large training room, a dining area, and fitness center, and conference room for the Corps’ commander.

The project represents the fifth multi-story tilt-wall building constructed by Robins & Morton in the office park since 2020. The project is pursuing LEED certification. Robins & Morton, which is based in Birmingham, Ala, was the general contractor, and Nola| Van Peursem Architects, also Alabama-based, was the project architect. COPT Defense Properties was the developer. Last November, Sentar Inc., a woman-owned small business specializing in advanced cyber-intelligence solutions and technology, was awarded a contract for the Center’s PAX Functional Services and Support in such areas as customer training and quality assurance.

Huntsville Center focuses on construction management

 

Conference room in Redstone Gateway 300 building
The Commander's conference room inside the Redstone Gateway 300 building.

The 468-acre Redstone Gateway, with more than 2.3 million sf of mixed-use space either built or under construction, is a joint venture development between COPT Defense Properties and Jim Wilson & Associates. The construction cost for the new Huntsville Center was not disclosed.

Huntsville Center’s origins date back to 1967, as Huntsville Division, whose first offices were in a converted textile mill. The Division has relocated several times since, the latest being into a facility at Thornton Research park in 2018.

The building's lobby
The lobby inside the Redstone Gateway 300 building.

 

The new building allows the Center to consolidate its off-post  leases, the Center’s workforce, and provides a more secure environment for the Center’s staff.

According to the Corps’ website, the Huntsville Center’s mission and functions are centered on four key processes: program and project management, engineering and technical services, construction management, and innovative contracting initiatives. The Corps executes more than 3,000 projects annually.

Related Stories

| Aug 11, 2010

Citizenship building in Texas targets LEED Silver

The Department of Homeland Security's new U.S. Citizenship and Immigration Services facility in Irving, Texas, was designed by 4240 Architecture and developed by JDL Castle Corporation. The focal point of the two-story, 56,000-sf building is the double-height, glass-walled Ceremony Room where new citizens take the oath.

| Aug 11, 2010

29 Great Solutions

1. Riverwalk Transforms Chicago's Second Waterfront Chicago has long enjoyed a beautiful waterfront along Lake Michigan, but the Windy City's second waterfront along the Chicago River was often ignored and mostly neglected. Thanks to a $22 million rehab by local architect Carol Ross Barney and her associate John Fried, a 1.

boombox1 - default
boombox2 -
native1 -

More In Category

Laboratories

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021