flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

47-story residential and office building set for San Francisco’s new ‘Hub’

Mixed-Use

47-story residential and office building set for San Francisco’s new ‘Hub’

Solomon Cordwell Buenz designed the project.


By David Malone, Asociate Editor | March 9, 2021
30 Van Ness aerial

All renderings courtesy SCB

30 Van Ness, a new mixed-use office and condominium tower, has recently been unveiled by Solomon Cordwell Buenz. The 824,000-sf tower will be located in San Francisco’s new “Hub,” an area created by the confluence of commercial, civic, and cultural uses at the corner of Market and Van Ness.

The all-electric building, which is targeting LEED Platinum, will be clad in linen-hued panels with deep, bronze-toned window surrounds. The facade will feature a prominently chiseled corner and be detailed with delicate twists. 

 

30 Van Ness podium

 

A nine-story podium will comprise 234,000 sf of open office space and be surrounded by walls of electrochromic glass. The office space will feature large, open floor plates with floor-to-floor heights of 14 feet, 6 inches. Each podium level will include a large outdoor landscaped terrace and a high-performance, fresh air circulating mechanical system.

Guests will enter the podium under the sculptural “Altos” canopy and be welcomed by the office lobby, an expansive multi-use space closely connected to the neighborhood outside through double-height glazing. Atop the podium, the residential tower will include 333 condominium units, beginning on the 11th floor, ranging from studios to three-bedrooms. Featured on the top floors will be six units with large private terraces. The 10th floor will serve as the amenity floor for the residences with a focus on wellness and catering to the creative.

 

30 Van Ness lobby entrance

 

The project will also give back over 3,000 sf for a public outdoor space as well as provide a 5,000 sf multi-purpose performance space, stadium-like seating, and micro-retail kiosks at the corner of Van Ness and Market.

The project is slated for completion in 2025.

Tags

Related Stories

| Aug 11, 2010

Westin Hotel

Mid-twentieth-century projects are in a state of limbo. In many cities, safeguards against quick demolition don't even cover “new” buildings built after 1939, yet many such buildings may be obsolete by current standards. The Farmers and Mechanics Savings Bank, located in downtown Minneapolis, was one such building, a rare example of architecture from a time when American design was ...

| Aug 11, 2010

Platinum Award: Monumentally Hip Hotel Conversion

At one time the tallest building west of the Mississippi, the Foshay Tower has stood proudly on the Minneapolis skyline since 1929. Built by Wilbur Foshay as a tribute to the Washington Monument, the 30-story obelisk served as an office building—and cultural icon—for more than 70 years before the Ryan Companies and co-developer RWB Holdings partnered with Starwood Hotels & Resor...

| Aug 11, 2010

Hilton President Hotel

Once an elegant and fashionably trendy locale, the Presidential Hotel played host to the 1928 Republican National Convention where Herbert Hoover was nominated for President, and acted as a hot spot for Kansas City Jazz in the '30s and '40s. The hotel was eventually abandoned in 1984, at which point it became a haven for vagabonds and pigeons, collecting animal waste and incurring significant s...

| Aug 11, 2010

CityCenter Takes Experience Design To New Heights

It's early June, in Las Vegas, which means it's very hot, and I am coming to the end of a hardhat tour of the $9.2 billion CityCenter development, a tour that began in the air-conditioned comfort of the project's immense sales center just off the famed Las Vegas Strip and ended on a rooftop overlooking the largest privately funded development in the U.

| Aug 11, 2010

Gold Award: Westin Book Cadillac Hotel & Condominiums Detroit, Mich.

“From eyesore to icon.” That's how Reconstruction Awards judge K. Nam Shiu so concisely described the restoration effort that turned the decimated Book Cadillac Hotel into a modern hotel and condo development. The tallest hotel in the world when it opened in 1924, the 32-story Renaissance Revival structure was revered as a jewel in the then-bustling Motor City.

| Aug 11, 2010

Silver Award: Palmer House Hilton Hotel & Shops Chicago, Ill.

Chicago's Palmer House Hilton holds the record for the longest continuously operated hotel in North America. It was originally built in 1871 by Potter Palmer, one of America's first millionaire developers. When it was rebuilt after the Great Chicago Fire it became the first hotel in the U.S. to put a telephone in every room.

| Aug 11, 2010

Gulf Coast Hotel's Stormy Road to Recovery

After his initial tour of the dilapidated 1850s-era Battle House Hotel, Ron Blount, construction manager with Retirement Systems of Alabama, said to his boss: “You need a priest more than you need a contractor.” Those words were more prescient to RSA's restoration of the historic Mobile landmark than he could have known at the time.

| Aug 11, 2010

Lifestyle Hotel Trends Around the World

When the Rocco Forte Collection opens the Verdura Golf & Spa Resort in Sicily in early 2009, the 200-room luxury property will be one of the world's newest lifestyle hotels. Lifestyle hotels cater to guests seeking a heightened travel experience, which they deliver by offering distinctive—some would say avant-garde, or even outrageous—architecture, room design, amenities, and en...

boombox1 - default
boombox2 -
native1 -

More In Category



MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021