HorizonTV Featuring BD+C: Watch Episodes On Demand At HorizonTV

Videos

Track construction progress and prevent cost overruns with visual data

EarthCam’s live streaming technology and high quality imagery is easy to share across organizations to enhance communication and resolve disputes. 

See how it works!

Recent Videos View all 285 items

/how-historic-st-louis-building-used-new-firestopping-technology
How a Historic St. Louis Building Used New Firestopping Technology
How a Historic St. Louis Building Used New Firestopping Technology

A massive renovation project in St. Louis utilized Trim-Tex's Fire Bead to supercharge their firestopping. Learn how in this video!

/track-construction-progress-and-prevent-cost-overruns-visual-data
Track construction progress and prevent cost overruns with visual data
Track construction progress and prevent cost overruns with visual data

EarthCam’s live streaming technology and high quality imagery is easy to share across organizations to enhance communication and resolve disputes. 

See how it works!

/replacing-roof-hatch-has-never-been-easier
Replacing A Roof Hatch Has Never Been Easier
Replacing A Roof Hatch Has Never Been Easier

BILCO's VersaMount replacement hatch allows you to replace a damaged roof hatch without the hassle of re-roofing.

/ppg-layer-without-limits
PPG Layer Without Limits
PPG Layer Without Limits

PPG aluminum extrusion coatings deliver durability and aesthetic beauty to change what’s possible in the New York skyline and around the world.

/beauty-wood-performance-composite
The Beauty of Wood, the Performance of Composite
The Beauty of Wood, the Performance of Composite

Engineered for facades and rainscreens, Fortress® cladding out-delivers wood and other wood-emulating materials in beauty, strength and durability.

/fire-rated-basics-what%E2%80%99s-new-fire-rated-glass-and-framing
Fire-Rated Basics: What’s New in Fire-Rated Glass and Framing?
Fire-Rated Basics: What’s New in Fire-Rated Glass and Framing?

Learn about the advancement of fire-rated glass and framing technology, including fire-rated glazing systems that are both functional and aesthetically pleasing.

/code-approved-factory-assembled-custom-designed-premium-aluminum-railing-systems
Code-Approved, Factory Assembled, Custom Designed Premium Aluminum Railing Systems
Code-Approved, Factory Assembled, Custom Designed Premium Aluminum Railing Systems

Ultra Signature railing system utilizes a two-piece design that withstands considerably more lateral force than code requires.

Ultra Aluminum Logo

/laticrete%C2%AE-masonry-veneer-installation-system-exceeds-hurricane-proof-regulations
LATICRETE® Masonry Veneer Installation System Exceeds Hurricane Proof Regulations.
LATICRETE® Masonry Veneer Installation System Exceeds Hurricane Proof Regulations.

Marion Ceramics partners with LATICRETE to help repurpose an 1800's cigar factory into an environmentally sustainable water chiller system for a new 56-acre mixed use development in Tampa, Florida.

AIA Show Report View all 35 items

/innovative-solutions-dowsil-bring-awe-inspiring-visions-life
Innovative solutions from DOWSIL™ bring awe-inspiring visions to life

Stanley Yee of DOWSIL™ takes us through the company's recent rebranding. Take a look at the products featured at A'18 and learn how DOWSIL™ continues the tradition of providing products and solutions that address performance, productivity and more.

For more information, visit consumer.dow.com/construction.

Innovative solutions from DOWSIL™ bring awe-inspiring visions to life
/introducing-optimum-performance-next-generation-insulation-kingspan
Introducing optimum performance next-generation insulation from Kingspan

Andrew Wilson of Kingspan Insulation shares with us their new product, OPTIM-R, at A'18. Watch this video to learn more about these vacuum insulated panels and how this product provides outstanding R-values and an ultra-thin insulation solution.

For more information, visit kingspaninsulation.us.

Introducing optimum performance next-generation insulation from Kingspan
/stone-wool-roofing-insulation-and-coverboard-one-rockwool
A stone wool roofing insulation and coverboard in one from ROCKWOOL

Chad Holmes of ROCKWOOL discusses their new product, ROCKWOOL MULTIFIX™, at A'18. Watch this video to learn more about this new product and the importance of roofing insulation.

For more information, visit ROCKWOOL.com.

A stone wool roofing insulation and coverboard in one from ROCKWOOL
/discover-innovative-pavers-and-retaining-walls-unilock
Discover innovative pavers and retaining walls from Unilock

Mike Zengen of Unilock shares what sets their company and products apart from their competitors at A'18. Learn how Unilock continues to provide new solutions for specifiers and create products that revolutionize the market.

For more information, visit unilock.com

Discover innovative pavers and retaining walls from Unilock
/elevate-aesthetics-without-compromising-performance-vitro-architectural-glass
Elevate aesthetics without compromising performance with Vitro Architectural Glass

Robert Struble of Vitro Architectural Glass shares a new low-iron glass at A'18 that is set to be released later this year. Innovative products like this one benefit the architect, owner and occupants of a building by upgrading the building's look while maintaining functionality.

For more information, visit vitroglazings.com.

Elevate aesthetics without compromising performance with Vitro Architectural Glass
/modern-design-made-possible-nichiha-architectural-wall-panels
Modern design made possible with Nichiha Architectural Wall Panels

Tim Seims of Nichiha takes us through the innovation process that leads to exciting new products, like Miraia, at A'18. Take a look at how Nichiha's products provide the power of possibilities and offer options that previously seemed inaccessible.

For more information, visit nichiha-modern.com.

Modern design made possible with Nichiha Architectural Wall Panels
/davinci-roofscapes-introduces-nature-crafted-collection
DaVinci Roofscapes introduces the Nature Crafted Collection

Michael Cobb of DaVinci Roofscapes shares with us their new collection of colors at A'18. The new collection is designed to capture realistic, nature-inspired colors while maintaining the performance features of DaVinci's products. 

To learn more, visit davinciroofscapes.com.

DaVinci Roofscapes introduces the Nature Crafted Collection
/proven-silicone-solutions-dow-corning
Proven silicone solutions from Dow Corning

Joy Govitz takes us through some of the rich history of silicone solutions from Dow Corning at AIA 2017. Watch this video to see some of the versatile product offerings featured at the show.

Proven silicone solutions from Dow Corning

Greenbuild Report View all 26 items

/architect-educational-support-zip-system%C2%AE-sheathing-and-tape
Architect educational support from ZIP System® sheathing and tape

Don Simon, Manager Education and Training, discusses how Huber Engineered Woods is dedicated to providing education and support to multifamily teams from specification details to jobsite mock-walls and beyond at Greenbuild 2017.

Architect educational support from ZIP System® sheathing and tape
/sageglass-continues-provide-dynamic-and-innovative-products
SageGlass continues to provide dynamic and innovative products

In this video, we check in with SageGlass at Greenbuild 2017 in Boston. Learn about some of the ways they are using electrochromic dynamic glass to promote comfort and productivity for the occupant in a variety of settings, while also providing architects with more design freedom.

 

SageGlass continues to provide dynamic and innovative products
/tour-greenzone-2016
Tour of GreenZone 2016
Tour of GreenZone 2016
/lacantina-doors-greenzone-2016-greenbuild
LaCantina Doors in GreenZone 2016 at Greenbuild
LaCantina Doors in GreenZone 2016 at Greenbuild
/valspar-greenzone-2016-greenbuild
Valspar in GreenZone 2016 at Greenbuild
Valspar in GreenZone 2016 at Greenbuild
/nora-systems-greenzone-2016-greenbuild
Nora Systems at GreenZone 2016 in Greenbuild
Nora Systems at GreenZone 2016 in Greenbuild
/mechosystems-greenzone-2016-greenbuild
MechoSystems at GreenZone 2016 in Greenbuild
MechoSystems at GreenZone 2016 in Greenbuild
/lg-greenzone-2016-greenbuild
LG at GreenZone 2016 in Greenbuild
LG at GreenZone 2016 in Greenbuild

Inside Video Series View all 6 items

/inside-valspar-episode-1-color
Inside Valspar - Episode 1 (Color)
Inside Valspar - Episode 1 (Color)
/inside-valspar-episode-2-collaboration
Inside Valspar - Episode 2 (Collaboration)
Inside Valspar - Episode 2 (Collaboration)
/inside-valspar-episode-3-confidence
Inside Valspar - Episode 3 (Confidence)
Inside Valspar - Episode 3 (Confidence)
/inside-western-window-systems-episode-3-partnership
Inside Western Window Systems - Episode 3 (Partnership)
Inside Western Window Systems - Episode 3 (Partnership)
/inside-western-window-systems-episode-2-innovation
Inside Western Window Systems - Episode 2 (Innovation)
Inside Western Window Systems - Episode 2 (Innovation)
/inside-western-window-systems-episode-1-excellence
Inside Western Window Systems - Episode 1 (Excellence)
Inside Western Window Systems - Episode 1 (Excellence)

Sponsored Video Case Studies View all 2 items

/water-treatment-facility-renovation-benefits-laser-scanning-technology
Water treatment facility renovation benefits from laser scanning technology

When JRA Architects were contracted to modernize a water treatment facility from the late 1800s, they reached out to Ayoroa Simmons for help with assessing the current structures. Learn how the data captured by FARO® laser scanners helped create a clear, comprehensive view of the renovation in much less time than traditional field measuring methods.

Water treatment facility renovation benefits from laser scanning technology
/see-how-laser-scanner-technology-has-changed-way-company-approaches-problem-solving
See how laser scanner technology has changed the way this company approaches problem-solving

Robins & Morton is a general contractor and construction management firm that has been using laser scanners from FARO to identify and solve problems on the job. Take an inside look at how this innovative technology has saved time, money, and set this company apart in the market.

See how laser scanner technology has changed the way this company approaches problem-solving

Sponsored Videos View all 93 items

/steel-1%E2%80%9D-ceiling-transitions
Steel 1” Ceiling Transitions

See how easy it is to install our 1” steel transition molding.  Reduce materials, save money, and get off the jobsite faster.

Steel 1” Ceiling Transitions
/innovative-solutions-dowsil-bring-awe-inspiring-visions-life
Innovative solutions from DOWSIL™ bring awe-inspiring visions to life

Stanley Yee of DOWSIL™ takes us through the company's recent rebranding. Take a look at the products featured at A'18 and learn how DOWSIL™ continues the tradition of providing products and solutions that address performance, productivity and more.

For more information, visit consumer.dow.com/construction.

Innovative solutions from DOWSIL™ bring awe-inspiring visions to life
/stone-wool-roofing-insulation-and-coverboard-one-rockwool
A stone wool roofing insulation and coverboard in one from ROCKWOOL

Chad Holmes of ROCKWOOL discusses their new product, ROCKWOOL MULTIFIX™, at A'18. Watch this video to learn more about this new product and the importance of roofing insulation.

For more information, visit ROCKWOOL.com.

A stone wool roofing insulation and coverboard in one from ROCKWOOL
/discover-innovative-pavers-and-retaining-walls-unilock
Discover innovative pavers and retaining walls from Unilock

Mike Zengen of Unilock shares what sets their company and products apart from their competitors at A'18. Learn how Unilock continues to provide new solutions for specifiers and create products that revolutionize the market.

For more information, visit unilock.com

Discover innovative pavers and retaining walls from Unilock
/maintain-your-original-design-intent-armstrong-drywall-grid
Maintain Your Original Design Intent with Armstrong Drywall Grid

Specifying and building soffits with Armstrong Drywall Grid can lead to enough savings to keep that signature space or reduce construction schedules.

Try our NEW Savings Calculator and see for yourself >

Maintain Your Original Design Intent with Armstrong Drywall Grid
/pex-solutions-commercial-building-trends
PEX Solutions for Commercial Building Trends

Hear how PEX piping solutions for plumbing, mechanical/HVAC and radiant systems support current trends in commercial construction.

Learn more at www.uponorpro.com.

PEX Solutions for Commercial Building Trends
/pex-solutions-multifamily-and-hospitality-applications
PEX Solutions for Multifamily and Hospitality Applications

Learn why PEX is the ideal product for safe, reliable, durable piping solutions in multifamily and hospitality applications.

Learn more at www.uponorpro.com.

PEX Solutions for Multifamily and Hospitality Applications
/smart-solutions-supporting-pex-pipe
Smart Solutions for Supporting PEX Pipe

Learn the smart solution for supporting PEX pipe in commercial applications that allows hanger spacing similar to metal piping.

Learn more at uponorpro.com.

Smart Solutions for Supporting PEX Pipe
Overlay Init

Your card will be charged: 0

Success!
x