flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

U.S. hotel construction pipeline up 2%, with 5,090 projects in the works

Hotel Facilities

U.S. hotel construction pipeline up 2%, with 5,090 projects in the works

Upscale and upper-midscale hotels represent 63% of projects in the pipeline in Q1, according to Lodging Econometrics.


By Lodging Econometrics | April 25, 2022
U.S. hotel construction pipeline up 2%, with 5,090 projects in the works
Photo: Pixabay

The total U.S. hotel construction pipeline stands at 5,090 projects and 606,302 rooms at the end of the first quarter of 2022, up 2% by projects, but down 3% by rooms, according to the Q1 2022 Construction Pipeline Trend Report for the United States from Lodging Econometrics (LE). 
 
In the first quarter of 2022, there were 961 projects/128,784 rooms under construction, down 27% by projects and 28% by rooms YOY. 

Projects scheduled to start in the next 12 months, at 1,911 projects/223,030 rooms, are up 2% by projects and 3% by rooms YOY. Projects and rooms in early planning reached a record high in the first quarter, standing at 2,218 projects/254,488 rooms, up 24% by projects and 12% by rooms YOY.
 
Notably, the upscale and upper-midscale chain scales dominate the pipeline in Q1 with 63% of projects in the total pipeline concentrated in these two chain scales. This has been the case for several years. 

There were a total of 1,420 projects/184,692 rooms in the renovation or conversion pipeline in the U.S. during the first quarter. Project conversions and room conversions reached an all-time high in Q1, increasing 59% by projects and 48% by rooms YOY.

Hotel developers eager to break ground on new projects

New projects and development planning that was previously on hold are now getting the green light from investors and developers with buoyed confidence thanks to rather robust domestic leisure travel during the first part of the year. With stronger domestic leisure travel in the U.S., along with the albeit slower revival of corporate and group travel, there is growing confidence in the recovery. Developers are eager to move forward with plans and break ground as this upward trend in hotel business demand is expected to continue throughout 2022.
 
Through year-end 2021, the U.S. opened 826 projects accounting for 106,192 rooms. A total of 113 hotels/12,464 rooms opened in the first quarter of 2022. Over half of these opens, 68 hotels/7,154 rooms, were in suburban locations, but 41 hotels/4,703 rooms of newly opened hotels, or 36%, were in a top 25 market. 

Reflective of the increasing number of projects in early planning and projects scheduled to start in the next 12 months, LE’s forecast for new hotel openings by projects has risen ever so slightly for 2023. 

For the remainder of the year, LE forecasts another 649 projects/77,568 rooms to open for a total of 762 hotels/90,032 rooms in 2022, representing a 1.6% increase in new hotel supply. In 2023, LE forecasts an additional 839 hotels/93,169 rooms will open in the U.S., for a 1.6% supply increase.

Related Stories

| Aug 11, 2010

McCarthy, Skanska among nation's largest healthcare contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Healthcare Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

AECOM, Arup, Gensler most active in commercial building design, according to BD+C's Giants 300 report

A ranking of the Top 100 Commercial Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

New book provides energy efficiency guidance for hotels

Recommendations on achieving 30% energy savings over minimum code requirements are contained in the newly published Advanced Energy Design Guide for Highway Lodging.   The energy savings guidance for design of new hotels provides a first step toward achieving a net-zero-energy building.

| Aug 11, 2010

Perkins+Will master plans Vedanta University teaching hospital in India

Working together with the Anil Agarwal Foundation, Perkins+Will developed the master plan for the Medical Precinct of a new teaching hospital in a remote section of Puri, Orissa, India. The hospital is part of an ambitious plan to develop this rural area into a global center of education and healthcare that would be on par with Harvard, Stanford, and Oxford.

| Aug 11, 2010

Turner Building Cost Index dips nearly 4% in second quarter 2009

Turner Construction Company announced that the second quarter 2009 Turner Building Cost Index, which measures nonresidential building construction costs in the U.S., has decreased 3.35% from the first quarter 2009 and is 8.92% lower than its peak in the second quarter of 2008. The Turner Building Cost Index number for second quarter 2009 is 837.

| Aug 11, 2010

AGC unveils comprehensive plan to revive the construction industry

The Associated General Contractors of America unveiled a new plan today designed to revive the nation’s construction industry. The plan, “Build Now for the Future: A Blueprint for Economic Growth,” is designed to reverse predictions that construction activity will continue to shrink through 2010, crippling broader economic growth.

| Aug 11, 2010

PCL Construction, HITT Contracting among nation's largest commercial building contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Commercial Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Webcor, Hunt Construction lead the way in mixed-use construction, according to BD+C's Giants 300 report

A ranking of the Top 30 Mixed-Use Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021