Engineers

Engineering goes hand-in-hand with design, putting a practical lens on the architect’s vision and finding the best way to make it happen. Without a talented engineer, the project will never reach completion, and certainly will not reach the standards of functionality and sustainability that the architect and client are seeking.
October 12, 2011 | By BD+C Staff

The family-owned and operated general contractor attributes this significant milestone to the str...

read more
October 12, 2011 | By BD+C Staff

 

Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by W...

read more

As the population ages, designers of commercial and multifamily applications are incorporating new solutions to meet those demands. Ergonomics can be an integral part of design, manufacturing, and use. Nowhere is this more critical than in bathroom design.

read more
October 11, 2011 | By BD+C Staff

These new documents will be available in the first quarter of 2012 as part of the new AIA Contrac...

read more
October 11, 2011 | By BD+C

 

For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Sh...

read more
October 11, 2011 | By BD+C

The conclusive and independent third-party validation process is another step toward a green prod...

read more
October 11, 2011 | By BD+C Staff

 

The new group represents an expansion of the company’s Distressed Real Estate Initiative...

read more
October 11, 2011 | By BD+C Staff

With the completion of the JELD-WEN investment, Onex Partners III is approximately 40% invested....

October 07, 2011 | By BD+C Staff

 

Program will use USGBC’s newly revised LEED Demand Response credit as an implementation...

read more
October 07, 2011 | By BD+C Staff

 

Wins reinforce Otis’ position as leader in energy-efficient products.

October 07, 2011 | By BD+C Staff

 

ASSA ABLOY Trio-E door is the first to be certified to these sustainability requirements...

October 07, 2011 | By BD+C Staff

 

White paper defines EPD, details development process, and identifies emerging trends for...

read more
October 07, 2011 | By BD+C Staff

The energy-efficient NCE escalator from Otis offers customers substantial “green” benefits.

October 07, 2011 | By BD+C Staff

 

The panels allow interior lights to filter through, from inside. 

October 07, 2011 | By BD+C Staff

Green jobs are already an important part of the construction labor workforce, and signs are that...

read more
October 07, 2011 | By BD+C Staff

Modular Design Architecture >Dow Corning 758 sealant used in GreenZone modular high-performanc...

read more
October 07, 2011 | By BD+C Staff

 

Tridel teams up with Cisco and Control4 to unveil the future of green condo living in Ca...

read more
October 06, 2011 | By BD+C Staff

Panoptix combines latest technology, new business model and industry-leading expertise to make bu...

read more
October 06, 2011 | By BD+C Staff

Interactive modeling software transforms the design­build process. 

October 06, 2011 | By BD+C Staff

There is now a call for making enhanced resilience of a building’s structure to natural and man-m...

read more
October 06, 2011 | By BD+C Staff

Turnkey systems create an aesthetic architectural power plant. 

October 06, 2011 | By BD+C Staff

The cover features a specially designed EPDM finger-type gasket that ensures a positive seal with...

read more
October 05, 2011 | By BD+C Staff

Click here for the latest news and products from Greenbuild 2011, Oct. 4-7, in Toronto.

October 05, 2011 | By BD+C Staff

Researchers at the Massachusetts Institute of Technology’s (MIT) Concrete Sustainability Hub cond...

read more
October 05, 2011 | By BD+C Staff

Products include rubber flooring tiles, treads, wall bases, and more. 

October 05, 2011 | By BD+C Staff

Low insulation value reflects value of entire curtain-wall system. 

October 03, 2011 | By BD+C Staff

The facility, a modification of similar facilities used by Mitsubishi Heavy Industries, Inc. (MHI...

read more
October 03, 2011 | By BD+C Staff

Cauceglia is responsible for developing new global business strategies and expanding existing bus...

read more
September 30, 2011 | By BD+C Staff

The new structure serves as the cemetery's focal architectural point and center of operations.  ...

September 30, 2011 | By BD+C Staff

This new program offers a system for members to purchase annual licenses in order to offer electr...

read more
September 29, 2011 | By BD+C Staff

Profiles of Great Solutions will appear in December 2011 issue of Building Design+Construction....

Overlay Init