Rapid Install, Lower Costs: Smarter Containment for Data Centers
Discover how one contractor accelerated hot aisle containment across 160,000 square feet using reusable temporary wall systems—saving time, labor, and costs while meeting tight project deadlines.
Aug. 11, 2025
Sponsored by
In high-pressure data center builds, every minute counts. Traditional temporary wall methods—like metal studs and plastic sheeting—often create more problems than they solve, slowing down workflows and generating unnecessary waste. In this case study, discover how E&K of Phoenix overcame these challenges by switching to STARC’s reusable wall system. Learn how temporary construction walls are:
Cutting installation time and labor significantly
Enabling rapid reconfiguration across multiple data halls