flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Secluded sanctuary: Alnoba leadership training center

Building Team Awards

Secluded sanctuary: Alnoba leadership training center

Leadership training center becomes New England’s first Passive House building.


By David Barista, Editorial Director | June 13, 2017

Trent Bell Photography.

This exemplary project reminds us that our buildings can be both sustainable and beautiful, comfortable and efficient,” said Building Team Awards judge Bill Kline, AIA, EDAC, LEED AP, Vice President and Healthcare Studio Leader at SmithGroupJJR.

The 14,000-sf Alnoba leadership training center is the first project in New England to meet the quality and building performance standards prescribed by the Passive House energy model. A highly insulated shell—12 to 14 inches thick, incorporating triple-pane thermally insulated windows from Germany—wraps the entire building to achieve solar heat recovery. Five radiant-floor heating zones within the slabs cover 75% of the public spaces. 

The Building Team went to great lengths to meet the stringent performance standards while realizing the owner’s design vision. This includes timber frames that were built using historic hand tools and traditional methods to ensure authenticity, beauty, and strength.

 

Reclaimed and recreated timber frames and triple-pane thermally insulated windows highlight the groundbreaking Passive House design of the Alnoba leadership development center. Trent Bell Photography.

 

Building Team – Submitting firm, general contractor Callahan Construction Managers Owner Kensington Investment Company Architect GO Logic Structural engineer Becker Structural Engineers Mechanical Petersen Engineering Electrical Engineered Building Systems Plumbing engineer Granite State Plumbing and Heating

General Information – Size 14,000 sf Cost $10.4 million Construction time November 2014 to August 2016 Delivery method GMP

 

Trent Bell Photography.

 

Return to the 2017 Building Team Awards landing page

Related Stories

Architects | Jan 18, 2016

EHDD’s Monterey Bay Aquarium wins AIA Twenty-five Year Award

The aquarium set new technical standards for the building type, which still influence today, such as the flow-through seawater-based heat pump system, naturalistic exhibitions, and corrosion protection.

Building Team Awards | Apr 10, 2015

14 projects that push AEC teaming to the limits

From Lean construction to tri-party IPD to advanced BIM/VDC coordination, these 14 Building Teams demonstrate the power of collaboration in delivering award-winning buildings. These are the 2015 Building Team Award winners.

Building Team Awards | Apr 10, 2015

Prefab saves the day for Denver hospital

Mortenson Construction and its partners completed the 831,000-sf, $623 million Saint Joseph Hospital well before the January 1, 2015, deadline, thanks largely to their extensive use of offsite prefabrication.

Building Team Awards | Apr 10, 2015

Anaheim’s soaring intermodal hub

Anaheim's Regional Transportations Intermodal Center is the largest ETFE project in North America.

Building Team Awards | Apr 10, 2015

Virtual collaboration helps complete a hospital in 24 months

PinnacleHealth needed a new hospital STAT! This team delivered it in two years, start to finish.

Building Team Awards | Apr 10, 2015

New arts venue reinvigorates Virginia Tech's campus

The STV-led Building Team creates a world-class performance and arts venue with learning and entrepreneurial dimensions.

Building Team Awards | Apr 9, 2015

Multifaced fitness center becomes campus landmark

A sloped running track and open-concept design put this Building Team to the test. 

Building Team Awards | Apr 9, 2015

Nation's first LEED-certified bus depot

A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.

Building Team Awards | Apr 9, 2015

Setting the bar for port-of-entry design

Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.

Building Team Awards | Apr 9, 2015

Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C

Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021