flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

San Jose’s new tallest building tops out

Mixed-Use

San Jose’s new tallest building tops out

Steinberg Hart designed the project.


By David Malone, Associate Editor | August 4, 2020
MIRO mixed-use towers in San Jose

Courtesy Suffolk

At 28-stories, MIRO, a mixed-use residential project, is set to be the new tallest building in San Jose.

The design features two towers with the same window wall and curtain wall systems and alternating balconies. The rooftop of the West Tower will feature amenities for indoor/outdoor social gatherings and private events with seating. The East Tower will feature outdoor seating and fitness. Each rooftop will be landscaped and offer views of the surrounding area.

The towers, which recently celebrated their topping out, stretch along E. Santa Clara Street between 4th and 5th Streets and sit atop a parking structure with four levels of above grade parking, three levels of below grade parking, and a landscaped roof with pool deck and amenities. 

 

 

Additionally, the ground level of the parking structure will include approximately 15,000 sf of retail. Grand entry lobbies will face E. Santa Clara Street with a shared apartment entry lobby that leads to a double-height flex/retail space anchored at the southwest corner on level three.

The 630-unit project is slated for completion in spring 2021. Suffolk is building the project with Bayview Development Group as the Developer and Steinberg Hart as the architect.

Tags

Related Stories

| Apr 3, 2012

Luxury hotel 'groundscraper' planned in abandoned quarry

Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.

| Mar 16, 2012

Temporary fix to CityCenter's Harmon would cost $2 million, contractor says

By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 19, 2011

Chicago’s Aqua Tower wins international design award

Aqua was named both regional and international winner of the International Property Award as Best Residential High-Rise Development.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 3, 2011

Hardin Construction tops out Orlando Embassy Suites

The project began in April 2011 and is expected to open in fall 2012.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021