flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Rising above adversity: National Museum of African American History and Culture

Building Team Awards

Rising above adversity: National Museum of African American History and Culture

Gold Award: The Smithsonian Institution’s newest museum is a story of historical and construction resolve.


By John Caulfield, Senior Editor | June 7, 2017

Its striking cast-aluminum, 3,600-panel façade provides transparency into the museum’s above- ground interior space. Courtesy Brad Feinknopf.

This much-ballyhooed project, which sits on the last available lot within the National Mall in Washington, D.C., was first conceived 100 years ago. Its 56-month realization involved three GCs, four architects, more than 30 consultants, 200 subcontractors, and 5,000 craft workers.

At almost every turn, the Building Team faced obstacles, not the least being the District of Columbia’s high water table. Three-fifths of the museum is below grade, and its construction entailed a 70-foot-deep excavation of 350,000 cubic yards of dirt. The Building Team developed a support-of-excavation system that could withstand water pressure of 37,000 pounds per sf.

To meet the client’s request that all ground-floor and above-grade spaces be column free, the Building Team used four steel/cement structural cores to support the building’s superstructure and façade. 

 

Its below-ground attractions include a Contemplative Court, illuminated by natural light coming through an oculus onto a waterpool. Courtesy Brad Feinknop.

 

The museum, whose silhouette is designed to resemble a West African crown, is distinguished by “The Corona,” a striking curtain wall consisting of 3,600 panels, modeeld after ironwork in the American South. The original cast-bronze design was deemed too expensive, so the Building Team chose cast-aluminum panels that reduced the cost by $20 million. It also experimented with 20 colors and finishes to achieve the façade’s bronze tint.

Natural light streams through a 20-foot-diameter oculus into an underground Contemplative Court. Outside, a 200-foot-long porch, supported by two 32-ton columns, cantilevers 40 feet over a water feature.

The museum houses 36,000-plus artifacts and was literally built around two of them—an 80-foot-long Pullman railway car, and a guard tower from Louisiana’s notorious Angola Prison—that two 550-ton cranes lowered into place early in construction.

 

Building Team – Submitting firm, contractor: Clark Construction Group; Owner: The Smithsonian Institution; Architects: Adjaye Associates, Davis Brody Bond, SmithGroupJJR, The Freelon Group; Interior architects: Perkins+Will, Davis Brody Bond (below grade); Exhibit designer: Ralph Appelbaum Associates Structural engineers:   Robert Silman Associates (below grade), Guy Nordenson and Associates (above grade); MEP engineer: WSP USA; General contractor: Joint venture of Clark Construction, Smoot Construction, and H.J. Russell & Company' Construction manager: McKissack & McKissack; Landscape architect: Gustafson Guthrie Nichol

General Information – Size 409,000 sf Cost $413 million Construction time January 2012 to September 2016 Delivery method Design-bid-build

 

Return to the 2017 Building Team Awards landing page

Related Stories

Architects | Jan 18, 2016

EHDD’s Monterey Bay Aquarium wins AIA Twenty-five Year Award

The aquarium set new technical standards for the building type, which still influence today, such as the flow-through seawater-based heat pump system, naturalistic exhibitions, and corrosion protection.

Building Team Awards | Apr 10, 2015

14 projects that push AEC teaming to the limits

From Lean construction to tri-party IPD to advanced BIM/VDC coordination, these 14 Building Teams demonstrate the power of collaboration in delivering award-winning buildings. These are the 2015 Building Team Award winners.

Building Team Awards | Apr 10, 2015

Prefab saves the day for Denver hospital

Mortenson Construction and its partners completed the 831,000-sf, $623 million Saint Joseph Hospital well before the January 1, 2015, deadline, thanks largely to their extensive use of offsite prefabrication.

Building Team Awards | Apr 10, 2015

Anaheim’s soaring intermodal hub

Anaheim's Regional Transportations Intermodal Center is the largest ETFE project in North America.

Building Team Awards | Apr 10, 2015

Virtual collaboration helps complete a hospital in 24 months

PinnacleHealth needed a new hospital STAT! This team delivered it in two years, start to finish.

Building Team Awards | Apr 10, 2015

New arts venue reinvigorates Virginia Tech's campus

The STV-led Building Team creates a world-class performance and arts venue with learning and entrepreneurial dimensions.

Building Team Awards | Apr 9, 2015

Multifaced fitness center becomes campus landmark

A sloped running track and open-concept design put this Building Team to the test. 

Building Team Awards | Apr 9, 2015

Nation's first LEED-certified bus depot

A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.

Building Team Awards | Apr 9, 2015

Setting the bar for port-of-entry design

Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.

Building Team Awards | Apr 9, 2015

Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C

Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021