Red Bull Racing has unveiled and opened the new Red Bull Racing Erena, a sim racing training facility located at the heart of its Milton Keynes Technology Campus. The facility is designed to help improve the current crop of 12 team drivers and to be used as an academy hub to train young sim racers for the future.
The space is divided into four main areas: the training area, the competition area, the console area, and the driver locker area. The training area features six F1 Esports Pro Series specification Playseats with Fanatic set-up and 240hz AOC screens connected to a 9’x9’ video wall that displays data from the drivers. There is also a Citrix data dashboard for the Team Manager to monitor training and events.
The competition area offers two Playseats with AOC triple screen set-ups and Fanatic direct-drive wheelbases for additional force feedback. One of the rigs will also feature a full Fanatic drifting set up. The console area is a “chillout zone” where the team can relax away from the virtual racetrack. The area features a 65-inch Philips OLED TV, a Playstation 5, and an Xbox Series X, complete with Playseat PUMA Active Gaming chairs.
The public will have opportunities on a select number of days each year to hire the space. Fans will also be able to visit the space during tours of the Red Bull Racing factory.
Related Stories
| Nov 26, 2014
U.S. Steel decides to stay in Pittsburgh, plans new HQ near Penguins arena
The giant steelmaker has agreed to move into a new headquarters that is slated to be part of a major redevelopment.
| Oct 16, 2014
Perkins+Will white paper examines alternatives to flame retardant building materials
The white paper includes a list of 193 flame retardants, including 29 discovered in building and household products, 50 found in the indoor environment, and 33 in human blood, milk, and tissues.
| Oct 12, 2014
AIA 2030 commitment: Five years on, are we any closer to net-zero?
This year marks the fifth anniversary of the American Institute of Architects’ effort to have architecture firms voluntarily pledge net-zero energy design for all their buildings by 2030.
| Sep 24, 2014
Architecture billings see continued strength, led by institutional sector
On the heels of recording its strongest pace of growth since 2007, there continues to be an increasing level of demand for design services signaled in the latest Architecture Billings Index.
| Sep 22, 2014
4 keys to effective post-occupancy evaluations
Perkins+Will's Janice Barnes covers the four steps that designers should take to create POEs that provide design direction and measure design effectiveness.
| Sep 22, 2014
Sound selections: 12 great choices for ceilings and acoustical walls
From metal mesh panels to concealed-suspension ceilings, here's our roundup of the latest acoustical ceiling and wall products.
| Sep 15, 2014
Ranked: Top international AEC firms [2014 Giants 300 Report]
Parsons Brinckerhoff, Gensler, and Jacobs top BD+C's rankings of U.S.-based design and construction firms with the most revenue from international projects, as reported in the 2014 Giants 300 Report.
| Sep 9, 2014
Using Facebook to transform workplace design
As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.
| Sep 3, 2014
New designation launched to streamline LEED review process
The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.