Red Bull Racing has unveiled and opened the new Red Bull Racing Erena, a sim racing training facility located at the heart of its Milton Keynes Technology Campus. The facility is designed to help improve the current crop of 12 team drivers and to be used as an academy hub to train young sim racers for the future.
The space is divided into four main areas: the training area, the competition area, the console area, and the driver locker area. The training area features six F1 Esports Pro Series specification Playseats with Fanatic set-up and 240hz AOC screens connected to a 9’x9’ video wall that displays data from the drivers. There is also a Citrix data dashboard for the Team Manager to monitor training and events.
The competition area offers two Playseats with AOC triple screen set-ups and Fanatic direct-drive wheelbases for additional force feedback. One of the rigs will also feature a full Fanatic drifting set up. The console area is a “chillout zone” where the team can relax away from the virtual racetrack. The area features a 65-inch Philips OLED TV, a Playstation 5, and an Xbox Series X, complete with Playseat PUMA Active Gaming chairs.
The public will have opportunities on a select number of days each year to hire the space. Fans will also be able to visit the space during tours of the Red Bull Racing factory.
Related Stories
| Aug 22, 2013
Sports Facility Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest sports facility design and construction firms, as reported in the 2013 Giants 300 Report.
| Aug 22, 2013
Energy-efficient glazing technology [AIA Course]
This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.
| Aug 14, 2013
Green Building Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest green design and construction firms.
| Jul 29, 2013
University of Kentucky’s Rupp Arena, Lexington Center will be renovated
The University of Kentucky’s Rupp Arena and the nearby Lexington Center will undergo a major renovation beginning next year.
| Jul 29, 2013
2013 Giants 300 Report
The editors of Building Design+Construction magazine present the findings of the annual Giants 300 Report, which ranks the leading firms in the AEC industry.
| Jul 22, 2013
Competitive pressures push academia to improve residences, classrooms, rec centers [2013 Giants 300 Report]
College and university construction continues to suffer from strained government spending and stingy commercial credit.
| Jul 22, 2013
Top University Sector Construction Firms [2013 Giants 300 Report]
Whiting-Turner, Turner, Skanska top Building Design+Construction's 2013 ranking of the largest university sector contractors and construction management firms.
| Jul 22, 2013
Top University Sector Engineering Firms [2013 Giants 300 Report]
Affiliated Engineers, URS, AECOM top Building Design+Construction's 2013 ranking of the largest university sector engineering and engineering/architecture firms in the U.S.
| Jul 22, 2013
Top University Sector Architecture Firms [2013 Giants 300 Report]
Cannon, Perkins+Will, Stantec top Building Design+Construction's 2013 ranking of the largest university sector architecture and architecture/engineering firms in the U.S.
| Jul 19, 2013
Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]
Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.