flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Quick turnaround: Partners HealthCare

Building Team Awards

Quick turnaround: Partners HealthCare

Silver Award: A 2½-year project brings Partners HealthCare’s sprawling administrative functions under one roof.


By John Caulfield, Senior Editor | June 8, 2017

​The building’s interior design highlights the connection between floor-to-floor “neighborhoods.” Courtesy Robert Benson Photography.

This administrative building, the largest in Somerville, Mass., consolidates 4,500 employees from 14 locations across Boston into one place. The project’s 30-month schedule was half of the typical time frame for such a building. So the Building Team had little margin for delays or mistakes.

Twice-weekly meetings that included the client, AEC firms, and consultants were guided by seven core values that served as a roadmap during the design process. Once construction began, project leaders established a risk assessment group that identified and assessed potential problems weekly. 

The building creates an “all-under-one-roof” organizational concept and culture, with a training center, multipurpose auditorium (available for use by campus residents, the local community, and the Partners’ network), community hubs, and outdoor spaces that include two acres of green space and walking paths. The facility is near a new subway stop, which connects the building to Somerville’s developing mixed-use Assembly Row.   

 

By corralling its operations into one building, the client is realizing considerable savings on rent, and provides its employees with more convenient meeting spaces. Courtesy Robert Benson Photography.

 

Ten floors are devoted to workplace “neighborhoods” that foster engagement and collaboration. The first floor offers leasable retail space. 

By consolidating activities and events in its new central amenity hub, Partners HealthCare, which provides at-home health and nursing services to the elderly, has eliminated rental fees it was paying for multiple locations. Partners estimates that it will save $10 to $13 million annually from consolidating its operations. 

To prepare its workforce for the move, a comprehensive communications program engaged all 4,500 users with targeted, customized messaging. Before their arrival into the building, employees received details about their work environment and on-site food and snack options, which include a full-service cafeteria.

 

 

Building Team – Submitting firm, architect Gensler Developer Leggat McCall Properties Structural engineer McNamara/Salvia MEP engineer Buro Happold Engineering Contractor Suffolk Construction

General Information – Size 825,000 sf Cost: $465 million Construction time January 2014 to June 2016 Delivery method CM at risk

 

Return to the 2017 Building Team Awards landing page

Related Stories

Building Team Awards | Apr 9, 2015

IPD-driven fusion facility serves science and student life in Chicago

In dire need of modern science labs and a student union, North Park University built both—in the same building.

Building Team Awards | Apr 9, 2015

‘Prudent, not opulent’ sets the tone for this Catholic hospital

This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.

Building Team Awards | Apr 9, 2015

9/11 museum triumphs over controversy

The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.

Building Team Awards | Apr 7, 2015

Unique test facility will help make wind power more feasible

A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.

Building Team Awards | Apr 5, 2015

UK's leading foot and mouth disease lab turns containment design inside out

A daring Building Team breaks the bunker mentality common to research containment with this light-filled, open facility in the English countryside.

Building Team Awards | Apr 5, 2015

‘Project first’ philosophy shows team’s commitment to a true IPD on the San Carlos Center

Skanska and NBBJ join forces with Sutter Health on a medical center project where all three parties share the risk.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021