Pre-engineered structures

Pre-engineered structures


By Staff | August 11, 2010
This article first appeared in the 200111 issue of BD+C.

Center creation

Columbus Christian Center in Columbus, Ohio, is a large church and school designed with a pre-engineered EIFS-coated structure topped by a Starshield roof. The 54,000-sq.-ft. building includes a 2,236-seat sanctuary, administrative offices, a two-story classroom wing and a 42-ft.-high main entry foyer. The structure made erection easier during a difficult winter and reduced construction costs.

Star Buildings.

Reader Service No. 208

Church chimes

A fiberglass pre-engineered reproduction of the cupola of the Neshanic Reformed Church in New Jersey, which was constructed in 1772, consists of column covers, cornice, dome, functional louvers, balusters and an integral fiberglass structure. It is engineered to withstand 150 mph winds and snowstorms.

Edon Corp.

Reader Service No. 203

Space to spare

Engineered in conjunction with a SpaceLoft mezzanine, in-plant offices can double or triple useful floor space, providing additional security, noise abatement and storage room. Designed to fit around columns and machinery, the structures minimize ground-floor obstructions. The nut-and-bolt assembly allows for quick installation.

W.A. Schmidt Inc.

Reader Service No. 214

Space solutions

Fiberglass structures provide fast-customized alternatives to wood and metal sheds, industrial enclosures and other traditional space solutions. Designated Modulaire Enclosures are expandable, lightweight and weather-resistant and available for both lease and purchase. They can be used as portable buildings or covered walkways as well as for storage of products or equipment.

GE Capital Corp.

Reader Service No. 220

Splish, splash

The 22,500-sq-ft. Josh Davis Natatorium in San Antonio, Texas, used the 130-ft. CXP clearspan frame, which economically met the requirements for a column-free interior. Special coatings and insulation systems stand up to the corrosive pool environment. Designed by San Antonio-based Rehler, Vaughn & Koone, Architects, the structure was built by Spaw Glass Contractors Inc., Selma, Texas. San Antonio-based Moore Erection LP erected the frame.

Ceco.

Reader Service No. 206

Goal scored

Louisville Soccer Park in Louisville, Ky., installed two combination restroom/concession modular facilities. Manufactured for economy and ease of installation, Hunter's Trail buildings are plumbed, wired and shipped complete with concrete floor. The buildings meet Americans with Disabilities Act requirements and can be customized to suit specific needs.

Hunter Knepshield.

Reader Service No. 219

Candy striped

Great Oaks Vocational Institute of Technology and Career Development in Cincinnati used a "candy-cane" support structure for its L-shaped covered walkway that leads from the main and handicapped parking areas to the facility's entrance. The Floline Series 900 support structure incorporates 142 feet of 22-gauge, G-90 galvanized steel panels, which were curved to a 5-ft. radius to form the arch.

Floline.

Reader Service No. 213

Behind bars

Cell system for the corrections industry provides fully outfitted concrete-filled steel modular jail cells complete with doors, hardware, furniture, windows, glazing, plumbing, electrical and electronic systems. MaxWall systems are designed to shorten the construction process as well as alleviate on-site manpower requirements by utilizing factory prefabricated technology.

Norment Security Group.

Reader Service No. 217

Framing facilitators

Multistory pre-engineered steel building systems help builders and contractors frame their projects. A 30,000-sq.-ft., three-story office building in Bellingham, Wash., has split face block on the ground floor with traditional red brick for the upper stories.

HCI Steel Building Systems Inc.

Reader Service No. 205

Gym dandy

The 18,783-sq.-ft. Jefferson Academy of Westminster, Colo., features a full size gym and two stories of classrooms and laboratories. The exterior and interior of the gym are insulated wall panels. Other building systems include masonry, wind beams, wall liner panels and split face block and partitions. Built by Englewood, Colo.-based Denny Construction, the structure required only eight months to construct.

Chief Buildings.

Reader Service No. 204

Multipurpose shelter in 77 sizes

Maintenance-free, vandal-resistant shelters designed to accommodate smokers and nonsmokers are offered in 77 sizes. Complete with standard door, screens and roof-ridge ventilation, the Air-Flo shelter quickly transforms from weather-tight to fresh-air enclosure. Options include lighting, heating, air-conditioning, exhaust systems, benches, ash urns and insulated panels for sun control.

Duo-Gard Industries Inc.

Reader Service No. 210

Read all about it

A document detailing specifications for the design and manufacture of cold-formed steel trusses and components is available free.

Steel Truss and Component Association.

Reader Service No. 209

Up on the roof

Stegner Electric of Auburn Hills, Mich., commissioned an 11-ft. overhang for both its lower and upper roof structures. Such an overhang, especially in a heavy snow region, can create a design challenge for typical light-gauge truss systems. With the Ultra-Span Prefabricated Light Gauge Steel Truss System, drawings were submitted, special connection details were created and trusses were fabricated and delivered within four weeks.

MiTek Industries Inc.

Reader Service No. 207

Modular components speed construction

Pre-engineered and prefabricated modular panel structures assemble up to 400 percent faster than conventional methods. Structure, sheeting and insulation are installed in modular panels, as are doors, windows and ventilation. Small-Span panels are punched to accept a patented locking key, so that builders can quickly attach hinged roof panels to wall panels with one hand, rather than laboriously hold bolts, frames, sheeting and insulation steady with two hands.

Kelly Klosure Systems.

Reader Service No. 212

Just in time

Fenton Construction Co. built a 73,000-sq.-ft. warehouse for Interstate Brands in New Jersey, completing the pre-engineered warehouse in 51/2 months.

Butler Mfg. Co.

Reader Service No. 222

boombox1 - default
boombox2 -
native1 -
halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021