flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Pittsburgh's Tower at PNC Plaza raises the bar on high-rise greenness

Building Team Awards

Pittsburgh's Tower at PNC Plaza raises the bar on high-rise greenness

The Building Team designed the 800,000-sf tower to use 50% less energy than a comparable building. A 1,200-sf mockup allowed the team to test for efficiency, functionality, and potential impact on the building’s occupants.


By John Caulfield, Senior Editor | May 20, 2016

The Tower at PNC Plaza in Pittsburgh achieves the client’s sustainable business objectives. And its execution required a degree of testing and modeling by the Building Team that’s unusual for most U.S. office buildings. Photo: Connie Zhou/Michael Ash Partners. Click here to enlarge.

PNC Financial Services Group is among America’s leading corporate sustainability advocates. Six years ago, when it started thinking about a new headquarters in Pittsburgh, PNC’s leadership saw the building as a means to advance the company’s three strategic pillars: to support sustainable urban growth, attract the best talent, and maximize advanced energy opportunities.

GOLD AWARD
The Tower at PNC Plaza
Pittsburgh, Pa.

BUILDING TEAM
+Submitting firm: Paladino and Company (sustainability consultant)
+Owner: PNC Financial Services Group
+Architect: Gensler
+Structural/MEP: BuroHappold
+Mechanical/plumbing: Associated Mechanical Engineers
+Electrical: Woodward Engineering
+GC/CM: PJ Dick

GENERAL INFORMATION
Project size: Approximately 800,000 sf
Construction cost: Confidential at client’s request
Construction period: Spring 2012 to fall 2015
Delivery method: Design-build

The goal was no less grand than to build the world’s greenest office tower. It can be debated whether PNC’s reach exceeded its grasp, but there’s no disputing that this approximately 800,000-sf tower, which rises to a height of 33 stories near the confluence of the Monongahela and Allegheny rivers, is a testament to what can be achieved when a Building Team is in sync with an energetic owner.

The Tower at PNC Plaza is designed to use 50% less energy than a comparable building that meets ASHRAE 90.1 2007 standards. Daylighting is available to 92% of the tower’s workspace. It is estimated that the building can be ventilated naturally for 42% of the year.

To establish green benchmarks for its work, the Building Team toured some of the world’s highest-performing buildings. It also had to invent solutions that hadn’t been attempted to give PNC the efficiencies the bank wanted. The team adopted a “passive first” approach, starting with a south-facing orientation for the tower, that became a guiding principle on this project.

The Building Team constructed a 1,200-sf mockup that replicated the tower’s southwest corner. The mockup allowed the team to test various systems for efficiency, functionality, and potential impact on the building’s occupants. The mockup also helped to resolve issues before construction began. At one point, the Building Team discovered that the façade system wasn’t functioning as designed. Adding vents to the walls increased the ventilation and avoided more than $1 million in onsite repairs.

 

The tower’s lobby includes  a 30-foot structure, The Beacon, which through LED lights provides visitors and workers with real-time sensor readings of the building’s energy and water consumption. Photo: Connie Zhou/Michael Ash Partners. Click to enlarge.

 

Creating an updraft through the core

The building is designed to breathe like a living organism. Outside air enters the building through its double-skin façade and circulates through the interior via a solar chimney, a shaft that runs through the core of the tower. The chimney works with a rooftop solar collection panel that creates an updraft, drawing the air through the building without the need for pumps or fans.

Air gates open automatically to vent a 36-inch-wide cavity (“the porch”) between the interior wall and the exterior façade. The wood-accented interior walls have automated louvers for natural ventilation. Manually operated sliding doors allow office workers to step onto the porch on any floor.

Amenities within the tower include varying collaborative spaces, outdoor terraces, “neighborhoods” that openly connect floors, observation decks, and an indoor park on the 28th floor.

Depending on the season, an energy-recovery wheel humidifies, dehumidifies, heats, or cools the outside air as it flows into the building. The tower lobby and atrium feature radiant flooring. A 30-foot tower, known as The Beacon, is suspended in the lobby; its LED lighting provides onlookers with real-time sensor readings of the building’s performance, including energy use and water consumption.

 “This high-performance, sustainable-design building did a great job blending both passive and active systems for harvesting daylight and natural ventilation, while providing collaboration and interaction for people at the interior,” observed awards judge Gary Keclik, AIA, CSI, GGA, LEED AP, Principal of Keclik Associates. Keclik points specifically to the mockup as “an outstanding example of team cooperation that minimized budget and schedule impacts.”

“PNC Tower is the epitome of sustainability and energy-efficiency innovation,” said judge Josh Greenfield, PE, REP, CEM, BEMP, LEED AP, Vice President and Energy Services Group Manager with Primera Engineers. “It sets the bar very high—33 floors high—with respect to high-performance high-rise design and construction.”

Last fall, PNC Tower, which accommodates approximately 1,750 PNC employees, achieved LEED Platinum certification.

Related Stories

Building Team Awards | Nov 2, 2020

Fans come first at Allianz Field

The new home of the Minnesota United soccer club wins a Silver Award in BD+C’s 2020 Building Team Awards. 

Building Team Awards | Oct 24, 2020

Emory University Student Center wins the top award in 2020 Building Team Awards

Emory University Student Center wins the top award in 2020 Building Team Awards

Building Team Awards | Oct 22, 2020

Look up to the skies

The Mori Hosseini Student Union at Embry-Riddle Aeronautical University takes home a Silver Award in the 2020 Building Team Awards.

Building Team Awards | Oct 22, 2020

Judging a book by its cover

The New York Presbyterian David H. Koch Center wins a Silver Award in BD+C’s 2020 Building Team Awards.

Building Team Awards | Oct 21, 2020

Big Room equals big results

Tucson’s Banner University Medical Center is honored with a Gold Award in the 2020 Building Team Awards. 

Building Team Awards | Oct 21, 2020

New York’s STEM epicenter and career gateway

The CUNY New York City College of Technology Academic Building wins a Gold Award in BD+C’s 2020 Building Team Awards. 

Building Team Awards | Oct 20, 2020

Seamless speed to market drives Texas hospital’s growth

Learn why the Methodist Richardson Medical Center Vertical Expansion, in Richardson, Texas, was honored with a Gold Award in the 2020 Building Team Awards.

Building Team Awards | Oct 20, 2020

Winning with teamwork

The new home of the NBA’s Golden State Warriors, Chase Center, is honored with a Gold Award in the 2020 Building Team Awards.

Coronavirus | Oct 8, 2020

The Weekly show: Statue of Liberty Museum, emotional learning in K-12, LA's climate change vulnerability

The October 8 episode of BD+C's "The Weekly" is available for viewing on demand.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021