flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

PCL Construction rolls out portable coronavirus testing centers

Coronavirus

PCL Construction rolls out portable coronavirus testing centers

The prefabricated boxes offer walk-up and drive-thru options.


By John Caulfield, Senior Editor | April 26, 2020
PCL Construction rolls out portable coronavirus testing centers

Canada-based PCL Construction, which has focused lately on expanding its prefabrication capacity, has introduced two models for mobile COVID-19 testing centers that can be transported from factories by trailer and positioned on site by forklifts. Rendering: PCL Construction

   

Most public health experts continue to insist that there’s no way of knowing how many Americans are infected by the novel coronavirus without extensive testing, which has been easier said than done given the limited number of manufacturers that make testing equipment and a still-unreliable supply chain, especially for chemical reagents.

The total number of public health labs that have completed verification and offer testing was 97, as of April 25, according to the Centers for Disease Control and Prevention (CDC). As of April 21, the website goodrx.com listed 670 drive-through testing sites nationwide, including 19 at Walgreens drug stores in 11 states. Walmart’s goal is to support up to 50 testing sites across the country. Apple recently added coronavirus testing locations to its Maps app for iPhone, according to the website CNET. As of the afternoon of April 26, CNN reported that, since January, health experts identified 963,168 confirmed COVID-19 cases in the United States, and 54,614 virus-related deaths, based on estimates from Johns Hopkins University Center for Systems Science and Engineering.

To bolster this testing effort, PCL Construction was part of an multidisciplinry team that developed mobile testing facilities that can screen employees and customers for COVID-19. These Citizen Care Pods, as they're called, are designed to serve end users such as manufacturing factories, office towers, and retail stores, according to the Minneapolis-based website Finance & Commerce, which reported on the prototype.

PCL, which is based in Edmonton, Alberta, has 31 offices in North America and modular manufacturing facilities in Bakersfield, Calif., Lake Charles, La., Houston, and Toronto.

 

Portable Virus Testing Centers help battle coronavirus

The Citizen Care Pods allow health professionals to conduct tests at a safe distance from the business establishment. For example, in Minnesota the mobile testing center is a 160-sf retrofitted prefab structure with ceiling heights that range from 8 feet to 9.6 feet. The testing center are available in two design options—walk-ups and drive-throughs—and can also be fitted out with security cameras, sensors, and digital communications equipment.

The Daily Journal of Commerce reports that PCL’s testing centers were developed from prefabricated Conex units, similar to ocean shipping containers. The walk-up boxes have up to four stations inside that separate healthcare workers from people being tested. There are two windows on each side of the box, and two collapsible canopies that double as shelter when people are being tested and as protection with the box is shipped.

Modules have one swing door at the end for workers to enter and exit. Inside, there is a hand wash station, biohazard waste bin, metal shelving/cabinets, counters, a water cooler, electrical panel, a computer rack/communications panel and space for an optional battery. Hand sanitizer dispensers are found outside each window.

 

ALSO SEE: COVID-19 and real estate: How the coronavirus is impacting the AEC industry

 

Drive-thru units are similar to the walk-up units, except there is only one window on each side.

The development team for this concept was led by Citizen Care Pods Corporation, WZMH Architects, and PCL Construction. The team collaborated with LIfeLabs, Microsoft, and Insight Enterprises to bring this concept to completion in less than a month. Microsoft is investigating whether artificial intelligence could be deployed to eliminate the human element from the testing centers.

Ben Reinhardsen, who manages PCL’s special projects division, told the Journal that an order could be turned around and installed within three weeks.

The rollout reportedly will include a half-size option. As of this week, the team is finalizing details and pricing for an official launch of the pods.

Related Stories

Healthcare Facilities | May 19, 2023

A new behavioral health facility in California targets net zero energy

Shortly before Mental Health Awareness Month in May, development and construction firm Skanska announced the topping out of California’s first behavioral health facility—and the largest in the nation—to target net zero energy. Located in Redwood City, San Mateo County, Calif., the 77,610-sf Cordilleras Health System Replacement Project is slated for completion in late 2024.

3D Printing | May 12, 2023

World’s first 3D-printed medical center completed

3D construction printing reached new heights this week as the world’s first 3D-printed medical center was completed in Thailand.

Sustainability | May 11, 2023

Let's build toward a circular economy

Eric Corey Freed, Director of Sustainability, CannonDesign, discusses the values of well-designed, regenerative buildings.

Digital Twin | May 8, 2023

What AEC professionals should know about digital twins

A growing number of AEC firms and building owners are finding value in implementing digital twins to unify design, construction, and operational data.

Design Innovation Report | Apr 27, 2023

BD+C's 2023 Design Innovation Report

Building Design+Construction’s Design Innovation Report presents projects, spaces, and initiatives—and the AEC professionals behind them—that push the boundaries of building design. This year, we feature four novel projects and one building science innovation.

Sustainability | Apr 20, 2023

13 trends, technologies, and strategies to expect in 2023

Biophilic design, microgrids, and decarbonization—these are three of the trends, technologies, and strategies IMEG’s market and service leaders believe are poised to have a growing impact on the built environment.

Design Innovation Report | Apr 19, 2023

HDR uses artificial intelligence tools to help design a vital health clinic in India

Architects from HDR worked pro bono with iKure, a technology-centric healthcare provider, to build a healthcare clinic in rural India.

Healthcare Facilities | Apr 17, 2023

UC Irvine takes sustainability to new level with all-electric medical center

The University of California at Irvine (UCI) has a track record for sustainability. Its under-construction UCI Medical Center is designed, positioned, and built to preserve the nearby San Joaquin Marsh Reserve, to reduce the facility’s solar gain by 85%, and to be the first medical center in the country to operate on an all-electric central plant.

Healthcare Facilities | Apr 13, 2023

Healthcare construction costs for 2023

Data from Gordian breaks down the average cost per square foot for a three-story hospital across 10 U.S. cities.

Healthcare Facilities | Apr 13, 2023

Urgent care facilities: Intentional design for mental and behavioral healthcare

The emergency department (ED) is the de-facto front door for behavior health crises, and yet these departments are understaffed, overwhelmed, and ill-equipped to navigate the layered complexities of highly demanding physical and behavioral health needs.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021