flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Paine Field-Snohomish County Airport’s new terminal culminates early plan

Airports

Paine Field-Snohomish County Airport’s new terminal culminates early plan

$40 million redevelopment brands hub as true boutique airport.


By Jonathan Barnes, Contributing Editor | May 9, 2019

All Photos Courtesy: Paine Field Propeller Airports

Begun in 1936 as a Works Projects Administration effort, Paine Field-Snohomish County Airport originally was just a 2-runway airfield meant to spur development in the surrounding area. The plan was that someday, it would grow into a major travel destination.

But World War II brought greater needs, and from 1936 to 1946 the airfield, located about 20 miles north of Seattle, was an Army Air Corps installation. By 1948 the property was returned to local control, only to be taken over by the military again, from 1951 to 1962, when the US Air Force Aerospace Defense had an active unit there.

 

Passenger Waiting area

 

In 1966 the Air Force had mostly left, opening the spot to development. At that time The Boeing Company built an assembly plant on-site, realizing some of the hopes for development of local officials and business owners. That corporate move was followed over the years by many others; today, the airport is home to more than 50 businesses.

And now, with the Everett, WA, airport’s recent opening of a new $40 million passenger terminal, the transportation hub has truly arrived at the destination its planners once envisioned. The improvements showcase how far the airport has transformed itself since its humble beginnings. A longstanding destination for people from Seattle and northwestern Washington, Paine Field-Snohomish County Airport is a boutique airport, with all the services of such a spot.

 

Ticketing Hall

See Also: The Ilan and Asaf Ramon International Airport opens in Israel’s Negev Desert

 

The opening in March of the airport’s new passenger terminal also means that now, daily commercial flights with more than one carrier are offered. Alaska Airlines and United Airlines are offering a total of 24 daily flights to nine US locations including Los Angeles, Denver and Las Vegas.

The 2-gate, 30,000 SF terminal is the creation of Fentress Architects, which designed the base building, with architectural and interior designs done by Clive Lonstein, Inc. The terminal was completed through a public-private partnership between Snohomish County and Propeller Airports.

 

Central passenger waiting area

 

The feel of the new terminal is meant to be akin to an upscale hotel, its planners said. Comfortable seating areas, high quality furniture, and building materials including walnut ticket counters with onyx countertops, black walnut paneling and a Bose sound system.

The airport’s offerings also have changed, with some local businesses locating in the pre-security and post-security areas. Before passing through the Security checkpoint, travelers can stop for a moment at the Café Vita coffee shop; and post-security, Beecher’s Handmade Cheese Café, a Seattle company, and the Upper Case Bar offer other refreshments.

 

Tags

Related Stories

Airports | Jul 7, 2022

Love at first flight: The power of first impressions in airports

As architects, how we design a terminal and choreograph the passenger experience can stir up strong feelings.

Airports | Jun 29, 2022

BIG and HOK’s winning design for Zurich airport’s new terminal

Two years ago, Zurich Airport, which opened in the 1950s, launched an international design competition to replace the aging Dock A—the airport’s largest dock.

Airports | Jun 2, 2022

SOM-designed International Arrival Facility at Seattle’s Sea–Tac airport features the world’s largest aerial walkway

The Skidmore, Owings & Merrill (SOM)-designed International Arrivals Facility (IAF) at Seattle-Tacoma International Airport has opened, replacing a 50-year-old arrival facility.   

Sponsored | BD+C University Course | May 3, 2022

For glass openings, how big is too big?

Advances in glazing materials and glass building systems offer a seemingly unlimited horizon for not only glass performance, but also for the size and extent of these light, transparent forms. Both for enclosures and for indoor environments, novel products and assemblies allow for more glass and less opaque structure—often in places that previously limited their use.

Airports | Apr 4, 2022

Dominican Republic airport expansion will add mixed-use features

The recently revealed design concept for the expansion of Santiago International Airport in the Dominican Republic includes a transformation of the current building into a mixed-use space that features an office park, business center, and hotel.

Codes and Standards | Mar 4, 2022

FAA offers $1 billion in grants for airport terminal and tower projects

The Federal Aviation Administration (FAA) is now accepting applications for about $1 billion in grants for airport projects during fiscal year 2022.

Resiliency | Feb 15, 2022

Design strategies for resilient buildings

LEO A DALY's National Director of Engineering Kim Cowman takes a building-level look at resilient design. 

Coronavirus | Jan 20, 2022

Advances and challenges in improving indoor air quality in commercial buildings

Michael Dreidger, CEO of IAQ tech startup Airsset speaks with BD+C's John Caulfield about how building owners and property managers can improve their buildings' air quality.

Giants 400 | Oct 22, 2021

2021 Airport Sector Giants: Top architecture, engineering, and construction firms in the U.S. airport facilities sector

AECOM, Hensel Phelps, PGAL, and Gensler top BD+C's rankings of the nation's largest airport sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021