flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Office developers aim for zero carbon without offsets

Codes and Standards

Office developers aim for zero carbon without offsets

Some companies searching for office space make net zero carbon a requirement.


By Peter Fabris, Contributing Editor | July 22, 2022
Office Development
Courtesy Pixabay.

As companies reassess their office needs in the wake of the pandemic, a new arms race to deliver net zero carbon space without the need for offsets is taking place in London, according to a recent Bloomberg report.

Dutch developer Edge, for example, recently committed to reach absolute zero carbon on its new developments by at least 2050. Its future projects will eventually be built and operated in a way that requires no tree planting to mitigate their impact. Australia’s Lendlease Corp. and Copenhagen-based Nordic Real Estate Partners A/S have made similar pledges.

If the firms achieve that goal, they will outpace net-zero developments being promoted by many of Europe’s largest landlords that require offsets to reach zero-carbon goals. Edge will continue to build projects that include offsets for now as it seeks to build more sustainable buildings that won’t need any offsets to reach net-zero.

Edge plans to immediately reduce embodied emissions for any new projects by at least 50%. That would mean a maximum upfront embodied carbon target of 500 kilograms of CO2 for each square meter.

Related Stories

| Jun 28, 2012

Top building material executive urges building resilience in sustainability standards

A meeting of 1,000 business executives at the recent Rio+20 environmental conference featured a passionate plea to include building resilience in efforts to boost sustainability.

| Jun 28, 2012

Following spate of skyscraper balcony glass panel breakages, Ontario adopts code change

Ontario's housing minister announced new building code rules to help prevent glass panels from breaking off high-rise balconies during hot weather.

| Jun 28, 2012

Factory worker deaths in Italy raise questions on building codes after earthquakes

Italian officials are questioning seismic building standards and inspection procedures in the aftermath of two damaging earthquakes.

| Jun 21, 2012

Brazilian engineering/construction firm Odebrecht sues Florida over ban on companies doing business in Cuba

Odebrecht Construction Inc., a Brazilian engineering and construction company, is suing the State of Florida over a new law that bans governments from hiring companies with business ties to Cuba.

| Jun 21, 2012

String of shattered glass balcony panels prompts call for code reform in Ontario

Since last summer, glass balconies have shattered at 13 different buildings in Toronto.

| Jun 21, 2012

California adds window film to building code

California is the first state to add window film into its building code. Window film, a polymer material, offers cost-effective energy savings.

| Jun 21, 2012

New ISO standard to improve environmental management of concrete

A new ISO standard will help the construction industry better manage the environmental impacts of concrete.

| Jun 21, 2012

On net-zero projects, Building Teams will be held accountable for energy-efficiency performance

The building team will be held accountable for how net-zero energy buildings perform two, five, and maybe ten years after completion.

boombox1 - default
boombox2 -
native1 -

More In Category



Standards

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021