flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Newark Liberty International Airport breaks ground on $2.4 billion redevelopment project

Airports

Newark Liberty International Airport breaks ground on $2.4 billion redevelopment project

The project includes a new 1 million-sf terminal building with 33 domestic aircraft gates.


By David Malone, Associate Editor | June 26, 2017

Rendering courtesy PGAL

The modernization project at the Newark Liberty International Airport is officially underway. The Port Authority of New York and New Jersey has recently broken ground on the $2.4 billion project.

The largest aspect of the project is the redevelopment of the original Terminal A building, which opened in 1973 and is being replaced with a new 1 million-sf terminal building. PGAL is the lead architect responsible for advanced planning and concept development for the structure.

Included in the new terminal are 33 domestic aircraft gates, expanded departures and arrivals curbside frontage, a parking garage complex, and infrastructure improvements. The terminal is designed to initially accommodate up to 13.6 million passengers each year, but is incorporating the flexibility necessary to expand to serve larger aircraft and increased passenger demand in the future.

 

Rendering courtesy PGAL.

 

An expandable security screening checkpoint will provide increased passenger queue space and dedicated lanes for premium passengers, crew, and physically challenged travelers. A new baggage claim area will include six claim units with immediate access to airline services offices and passenger amenities for two defined arrivals areas from the departures concourses. Hold room seating areas will comprise a broad range of retail and food and beverage options and airline lounges are immediately accessible after the security checkpoint.

Additionally, a new departures and arrivals roadway system will support Terminal A. The new 3,000-car parking garage complex will feature a pedestrian bridge and hub connection that links passengers from the garage and Air Train to the terminal.

 

Rendering courtesy PGAL.

 

The new Terminal A is expected to be fully operational in 2022.

Related Stories

| Aug 28, 2013

Federal Government Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest federal government design and construction firms, as reported in the 2013 Giants 300 Report.  

| Aug 26, 2013

What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets

BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets. 

| Aug 22, 2013

Energy-efficient glazing technology [AIA Course]

This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.

| Aug 21, 2013

Why research is the ticket to successful airport wayfinding

Wayfinding is more than just signs; it requires a holistic approach based on communicating information that helps people make the right decision at the right time. 

| Aug 19, 2013

Discovery of hidden asbestos complicates DFW terminal renovations

The finding of more asbestos in Terminal B than expected, and the pending merger of US Airways and the airport’s largest tenant, American Airlines, is causing construction delays on a $2.3 billion Dallas/Fort Worth Airport terminal renovation.

| Aug 19, 2013

Integration of solar panels in building skin seen as key net-zero element

Recent high-profile projects, including stadiums in Brazil for the upcoming World Cup and Summer Olympics and a bank headquarters in the U.K., reflect an effort by designers to adopt building-integrated photovoltaics, or BIPV.

| Aug 14, 2013

Green Building Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest green design and construction firms. 

| Jul 29, 2013

2013 Giants 300 Report

The editors of Building Design+Construction magazine present the findings of the annual Giants 300 Report, which ranks the leading firms in the AEC industry.

| Jul 22, 2013

Transportation Facility Report [2013 Giants 300 Report]

Building Design+Construction's rankings of design and construction firms with the most revenue from airport terminals and other transportation-related facilities, as reported in the 2013 Giants 300 Report.

| Jul 19, 2013

Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]

Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021