A new resort has broken ground in Saudi Arabia with the goal of redefining the concept of sustainable architecture. Dubbed Desert Rock, the project is the first inland resort of The Red Sea Project, a destination comprising 50 resorts, 8,000 hotel rooms, and 1,000 residential properties across 22 islands and six inland sites.
The resort will not be built on a mountainside but will instead be carved directly into the ancient rock itself. The materials removed to carve into the site will then be reused to create the resort’s infrastructure.
The ground stone and existing sand will be used for concrete aggregate, which will be the main building material for all the architecture. Using the excavated material to build the project will ensure that it will have the same integral colors as the surrounding landscape, further immersing the architecture in its setting. Water retention and distribution systems will be used throughout the site, with harvested rainwater used to create a more green, flourishing wadi.
Desert Rock will feature 48 luxury villas and 12 hotel rooms that all offer panoramic views of the surrounding desert. A range of accommodation will be available, from ground level dwellings to crevice hotel suites midway up the mountain. A select number of excavated rooms will be located within the rock massif itself.
Resort amenities will include a spa and fitness center, remote destination dining areas, and a feature lagoon oasis. Guests will be able to hike, use dune buggies, and star gaze as part of the site-wide activities program.
Oppenheim Architecture designed the project. The Red Sea Development Company is the developer. Desert Rock is slated to welcome its first guests by the end of 2022.
Related Stories
| Aug 11, 2010
Construction employment declined in 333 of 352 metro areas in June
Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America. The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.
| Aug 11, 2010
Casino Queen breaks ground on $2.15 million entertainment venue
The Casino Queen in East St. Louis, Ill., is raising the stakes in its bid to capture a larger share of the local gaming market with the start of construction on a new $2.15 million sports bar and entertainment venue that will enhance the overall experience for guests.
| Aug 11, 2010
Outdated office tower becomes Nashville’s newest boutique hotel
A 1960s office tower in Nashville, Tenn., has been converted into a 248-room, four-star boutique hotel. Designed by Earl Swensson Associates, with PowerStrip Studio as interior designer, the newly converted Hutton Hotel features 54 suites, two penthouse apartments, 13,600 sf of meeting space, and seven “cardio” rooms.
| Aug 11, 2010
Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms
A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
10% of world's skyscraper construction on hold
Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.
| Aug 11, 2010
Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report
A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants