flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

New Denver hotel will integrate historic 130-year-old fire station into its design

Hotel Facilities

New Denver hotel will integrate historic 130-year-old fire station into its design

The 1883 Denver Hose Company No.1 building will be fully restored as part of the project.


By David Malone, Associate Editor | January 25, 2017

Rendering courtesy of Johnson Nathan Strohe.

A new 12-story hotel has broken ground in Denver near Coors Field and Union Station and while the majority of the hotel will have a sleek, modern aesthetic, one component will definitely stand out from the rest.

The historic Denver Hose Company No.1 building, which was constructed in 1883, will be incorporated into the hotel’s design. The building was listed as a city historic landmark in 1986 and is one of the only remaining structures from an early Denver neighborhood called the “Bottoms,” The Denver Post reports. The building is described as having beautiful brickwork, especially around the two front facing arches.

The building will be completely restored as part of the $80 million hospitality project and will serve as a restaurant and outdoor patios for the hotel. The patios will face Chestnut Place and 20th Street.

And the restoration couldn’t come a moment too soon. The fire station has been in a state of disrepair for years now, to the point where some people worried about it becoming a safety issue. It had all the looks of a structure ready to collapse on itself, but with help from the city and Historic Denver (an organization that preserves local Denver history, architecture, and landscapes), the building was stabilized until the restoration could begin.

Johnson Nathan Strohe and Boss Architecture designed the new hotel, which will be a Hilton Garden Inn. It will comprise 233 guest rooms and be operated by Davidson Hotels. Among the amenities the hotel will offer are a ballroom, meeting space, underground parking, and a fitness center.

The new Hilton Garden Inn is expected to open in early 2019.

Related Stories

| Aug 11, 2010

VA San Diego Healthcare System Building 1 Seismic Correction
San Diego, Calif.

Three decades after its original construction in the early 1970s, the Veterans Affairs San Diego Healthcare System Building 1 fell far short of current seismic codes. This not only put the building and its occupants—patients, doctors, nurses, visitors, and administrative staff—at risk in the event of a major earthquake, it violated a California state mandate requiring all hospitals to either retrofit or rebuild.

| Aug 11, 2010

Casino Queen breaks ground on $2.15 million entertainment venue

The Casino Queen in East St. Louis, Ill., is raising the stakes in its bid to capture a larger share of the local gaming market with the start of construction on a new $2.15 million sports bar and entertainment venue that will enhance the overall experience for guests.

| Aug 11, 2010

Outdated office tower becomes Nashville’s newest boutique hotel

A 1960s office tower in Nashville, Tenn., has been converted into a 248-room, four-star boutique hotel. Designed by Earl Swensson Associates, with PowerStrip Studio as interior designer, the newly converted Hutton Hotel features 54 suites, two penthouse apartments, 13,600 sf of meeting space, and seven “cardio” rooms.

| Aug 11, 2010

HDR, Perkins+Will top BD+C's ranking of the nation's 100 largest healthcare design firms

A ranking of the Top 100 Healthcare Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

10% of world's skyscraper construction on hold

Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021