flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Must see: Plans released for underwater city that could house 5,000 people

Must see: Plans released for underwater city that could house 5,000 people

At the base of Ocean Spiral, researchers will explore and research ways to excavate resources from the seabed. 


By BD+C Staff | November 24, 2014
All renderings courtesy Shimizu Corp.
All renderings courtesy Shimizu Corp.

Ocean Spiral is the name of Shimizu Corp.'s newly-revealed plan for an underwater city that could house up to 5,000 people.

The design centers around a floating, 500-meter-wide sphere linked to a resource center on the ocean floor via a 15-kilometer, helix-shaped path. 

According to The Guardian, the central dome would house business and residential zones.

At the base of the Ocean Spiral, researchers will explore and research ways to excavate resources from the seabed. 

Shimizu Corp., a Japanese construction company, claims that the project is realistic, and that the technology needed to make it possible will be available within 15 years. 

 

Related Stories

Sponsored | Modular Building | Jan 22, 2019

Folsom Hotel opens five months early using modular construction

Early check in? With modular construction the answer is yes!

Modular Building | Oct 31, 2018

Europe’s citizenM is trying to crack into the U.S. hotel market with steel-framed modular construction

Projects in several cities are in various stages of development.

Modular Building | Oct 12, 2018

DeSimone Consulting Engineers designs the tallest modular hotel in the United States

The hotel was originally designed as a cast-in-place concrete structure.

Modular Building | Sep 25, 2018

Amazon invests in a prefab module supplier

Los Angeles-based Plant Prefab targets single- and multifamily construction.

Modular Building | Aug 6, 2018

More contractors are turning to offsite production for speed and quality

Skender launches an advanced manufacturing division. Katerra ups its bet on modular. Prefabrication comes to the rescue on multiple projects.

Modular Building | Jul 23, 2018

Offsite construction: Why it’s important for the survival of your firm

The industry is approaching its “heart attack moment,” with so many large projects that are chronically late, over budget, and unprofitable, writes FMI Capital Advisors’ Michael Swistun.

| May 30, 2018

Accelerate Live! talk: An AEC giant’s roadmap for integrating design, manufacturing, and construction

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), Skender CEO Mark Skender and Chief Design Officer Tim Swanson present the construction giant’s vision for creating a manufacturing-minded, vertically-integrated design-manufacturing-build business model.

| May 30, 2018

Accelerate Live! talk: From micro schools to tiny houses: What’s driving the downsizing economy?

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), micro-buildings design expert Aeron Hodges, AIA, explores the key drivers of the micro-buildings movement, and how the trend is spreading into a wide variety of building typologies.

Modular Building | Jan 12, 2017

The largest modular construction hotel project in New York City is starting to get pieced together

The hotel’s 300 rooms are made from 210 prefabricated pods from Polcom Modular.

boombox1 - default
boombox2 -
native1 -

More In Category




Modular Building

Building with shipping containers not as eco-friendly as it seems

With millions of shipping containers lying empty at ports around the world, it may seem like repurposing them to construct buildings would be a clear environmental winner. The reality of building with shipping containers is complicated, though, and in many cases isn’t a net-positive for the environment, critics charge, according to a report by NPR's Chloe Veltman.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021