flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Michael Van Valkenburg Assoc. wins St. Louis Gateway Arch design competition

Michael Van Valkenburg Assoc. wins St. Louis Gateway Arch design competition


September 22, 2010

ST. LOUIS – Landscape architect Michael Van Valkenburgh and a multidisciplinary team of experts in “urban renewal, preservation, commemoration, social connections and ecological restoration” have been picked for the planning phase of The City+The Arch+The River 2015 International Design Competition.

The jury chose the MVVA Team over four others competing to enliven the area around the Gateway Arch and connect it to downtown St. Louis, the Mississippi River and the Illinois bank. Based in New York, MVVA’s portfolio includes the redesign of Pennsylvania Avenue at the White House, the design of Brooklyn Bridge Park and many other prominent projects. (Please see the MVVA Team profile at end of this document for information on expertise and accomplishments of its members.)

In its final report, the competition jury called the MVVA Team “a strong team with solid methodology.” As a team, “they convey intelligence and provide clear technical support for their design proposals,” the jury report states.

“MVVA is an outstanding team that presented a winning combination of the ambitious and the manageable,” said Tom Bradley, Superintendent of the Jefferson National Expansion Memorial. “They showed great reverence for the beauty and significance of the existing site, while suggesting improvements and attractions in line with our competition goals. We’re excited to start planning.”

Over a 90?day period, the team will work in partnership with the sponsors, the City of St. Louis, the National Park Service and others to further define program requirements; begin developing a design that takes into account the feasibility and practicality of proposed solutions; create a construction budget and fundraising plan; and define the delivery expectations from now until 2015.

“Between now and January, we will be challenging the MVVA Team to rise to the challenge to do what’s best for the city, for the region and for this national park,” said St. Louis Mayor Francis Slay. “The Arch is a national treasure, but it is intensely personal to people in and around St Louis. We will be working with Michael and his team, with continued input from the community and the experts, on creating the best solutions for the Arch grounds and the neighboring area.”“There is huge potential for the Illinois riverbank area and collaboration on both sides of the river,” said Dr. Vaughn Vandegrift, Chancellor of Southern Illinois University at Edwardsville, who serves with Bradley, Mayor Slay and others on the competitions governing group. “Our discussions regarding Illinois intensified and evolved even after the competition was launched. There are opportunities for the Illinois riverbank area now that didn’t exist when we gave instructions to the teams. We will work closely with the MVVA Team to evaluate what they have proposed and expand from there.”

Strong support for project implementation was shared last month in a letter to competition organizers from the bi?partisan Missouri and Illinois congressional delegations and during a visit by the U.S. Secretary of the Interior, Ken Salazar, who oversees the National Park Service and pledged to get the project done.

“This is another critical step in a continuum that began with the review of the park’s general management plan and continued on to the call for a competition, the skillful execution of the competition itself, today’s announcement of a winning design team, the establishment of an implementation team and a concept from which we can build,” said Bradley. “We are looking to this effort as a model for both public?private collaboration and improved connections between cities and our urban national parks.”

The MVVA Team’s design concept narrative describes their vision for the redesigned park as a “centerpiece of civic culture, an engine of regional economic growth, a showcase for sustainable ecological restoration and a celebration of the national significance of this historic place.”

The sponsoring group, the MVVA Team and others will host intensive reviews and workshops this fall to analyze the design concept and conduct a more detailed design exploration. At a minimum, the study will focus on the review of the technical advisory group, the impact on related downtown park properties and the Illinois side of the river, traffic and transportation and federal compliance issues.

The sponsors also will study issues relating to cost and construction, traffic, financial resources and federal compliance.

A monthly web?based progress report will update the public throughout the implementation period.

The eight?member jury counted among its members a Pulitzer Prize?winning architecture critic, a professor in the humanities, a former deputy director of the National Park Service, a real estate economist, a museum curator and renowned architects and landscape architects.

The jury shared its report and team rankings with the competition sponsor and managers after a series of presentations and tours of the community, competition site and exhibit of design concepts led by the sponsors and culminating in public presentations by the teams late last month.

The project will be constructed by Oct. 28, 2015, the 50th anniversary of the completion of the Arch.

About the Competition

The goal of The City+The Arch+The River 2015 international design competition is to create an iconic setting for the international icon, the Gateway Arch, honoring its immediate surroundings and weaving connections and transitions from the city and the Arch grounds to the Mississippi River, including the east bank in Illinois.

The competition, launched Dec. 8, 2009, has had three stages. Portfolio submissions in Stage I included a description of the lead designer, a statement of design intent and philosophy of the lead designer, a profile of the design team and examples of their work. From the original 49 submissions, in February 2010, the jury picked nine to enter Stage II.

Stage II involved the formation of the complete teams capable of executing the project, submission of required qualifications and a jury interview. This phase culminated in early April 2010, when the teams met with the jury and the field was narrowed to five teams.

On April 28, 2010, at the beginning of Stage III, the finalist teams presented their design philosophies and examples of past work at a public “Meet the Design Teams” event in downtown St. Louis, hosted by sportscaster Joe Buck. This event was followed by a three month design concept competition to explore the finalists’ design approach and test their working methodology.

The design concepts went on display on Aug. 17, 2010, at the Arch and in an exhibit traveling throughout the bi?state region. Visitors were able to voice opinions about the design concepts in the first week of the exhibit. A synopsis of the more than 600 comments received was shared with the jury. The finalist teams presented their design concepts to the jury in public session on Aug. 26, 2010.

The final project design, budget and implementation plan will be presented in January 2011. The project will be constructed by Oct. 28, 2015.

The new design is called for in the National Park Service’s General Management Plan for the Jefferson National Expansion Memorial, which was developed with extensive public input over an 18?month period and approved Nov. 23, 2009.

The competition is sponsored by the CityArchRiver 2015 Foundation, which includes National Park Superintendent Tom Bradley, St. Louis Mayor Francis G. Slay, community leaders from Missouri and Illinois, academics, architects and national park advocates.

Financial contributions to the CityArchRiver 2015 Foundation are being handled by the Greater St. Louis Community Foundation, a public charity with more than $140 million in charitable assets and representing more than 350 individual funds.

Donors to the competition include: Emerson, Gateway Center of Metropolitan St. Louis (Malcolm W. Martin Memorial Park), Peter Fischer, Emily Rauh Pulitzer, Civic Progress, Wachovia Wells Fargo Foundation, Danforth Foundation, John F. McDonnell, Bryan Cave LLP, Greater St. Louis Community Foundation, National Park Foundation, Monsanto, Alison and John Ferring, Bank of America, David C. Farrell and others who choose to remain anonymous. The traveling exhibit was sponsored by Civic Progress member companies.

Related Stories

Senior Living Design | Apr 24, 2024

Nation's largest Passive House senior living facility completed in Portland, Ore.

Construction of Parkview, a high-rise expansion of a Continuing Care Retirement Community (CCRC) in Portland, Ore., completed recently. The senior living facility is touted as the largest Passive House structure on the West Coast, and the largest Passive House senior living building in the country.

Hotel Facilities | Apr 24, 2024

The U.S. hotel construction market sees record highs in the first quarter of 2024

As seen in the Q1 2024 U.S. Hotel Construction Pipeline Trend Report from Lodging Econometrics (LE), at the end of the first quarter, there are 6,065 projects with 702,990 rooms in the pipeline. This new all-time high represents a 9% year-over-year (YOY) increase in projects and a 7% YOY increase in rooms compared to last year.

Architects | Apr 24, 2024

Shepley Bulfinch appoints new Board of Director: Evelyn Lee, FAIA

Shepley Bulfinch, a national architecture firm announced the appointment of new Board of Director member Evelyn Lee, FAIA as an outside director. With this new appointment, Lucia Quinn has stepped down from the firm’s Board, after serving many years as an outside board advisor and then as an outside director. 

75 Top Building Products | Apr 22, 2024

Enter today! BD+C's 75 Top Building Products for 2024

BD+C editors are now accepting submissions for the annual 75 Top Building Products awards. The winners will be featured in the November/December 2024 issue of Building Design+Construction. 

Laboratories | Apr 22, 2024

Why lab designers should aim to ‘speak the language’ of scientists

Learning more about the scientific work being done in the lab gives designers of those spaces an edge, according to Adrian Walters, AIA, LEED AP BD+C, Principal and Director of SMMA's Science & Technology team.

Resiliency | Apr 22, 2024

Controversy erupts in Florida over how homes are being rebuilt after Hurricane Ian

The Federal Emergency Management Agency recently sent a letter to officials in Lee County, Florida alleging that hundreds of homes were rebuilt in violation of the agency’s rules following Hurricane Ian. The letter provoked a sharp backlash as homeowners struggle to rebuild following the devastating 2022 storm that destroyed a large swath of the county.

Mass Timber | Apr 22, 2024

British Columbia changing building code to allow mass timber structures of up to 18 stories

The Canadian Province of British Columbia is updating its building code to expand the use of mass timber in building construction. The code will allow for encapsulated mass-timber construction (EMTC) buildings as tall as 18 stories for residential and office buildings, an increase from the previous 12-story limit. 

Standards | Apr 22, 2024

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.

Building Materials | Apr 22, 2024

Tacoma, Wash., investigating policy to reuse and recycle building materials

Tacoma, Wash., recently initiated a study to find ways to increase building material reuse through deconstruction and salvage. The city council unanimously voted to direct the city manager to investigate deconstruction options and estimate costs. 

Student Housing | Apr 19, 2024

$115 million Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.

boombox1 - default
boombox2 -
native1 -

More In Category



Architects

Shepley Bulfinch appoints new Board of Director: Evelyn Lee, FAIA

Shepley Bulfinch, a national architecture firm announced the appointment of new Board of Director member Evelyn Lee, FAIA as an outside director. With this new appointment, Lucia Quinn has stepped down from the firm’s Board, after serving many years as an outside board advisor and then as an outside director. 


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021