flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Marriott leads with the largest U.S. hotel construction pipeline at Q3 2021 close

Hotel Facilities

Marriott leads with the largest U.S. hotel construction pipeline at Q3 2021 close

In the third quarter alone, Marriott opened 60 new hotels/7,882 rooms accounting for 30% of all new hotel rooms that opened in the U.S.


By Lodging Econometrics | October 28, 2021
Hotel room

Courtesy Pixabay

According to the third quarter report by analysts at Lodging Econometrics (LE), the franchise companies leading the U.S. construction pipeline with the greatest number of new construction projects are Marriott International with 1,286 projects/166,174 rooms, Hilton Worldwide with 1,223 projects/139,742 rooms, and InterContinental Hotels Group (IHG) with 769 projects/77,558 rooms. The construction pipelines for these three franchise companies comprise an impressive 68% of the total construction pipeline projects.

The leading brands by project count in the construction pipeline for each of these three companies are Hilton’s Home2 Suites by Hilton with 402 projects/41,846 rooms, IHG’s Holiday Inn Express with 301 projects/28,852 rooms, and Marriott’s Fairfield Inn with 246 projects/23,653 rooms. These three mid-market brands alone account for 20% of the projects in the total construction pipeline.

Other significant brands in the pipeline for these franchises include Hilton’s Hampton by Hilton, reaching a cyclical peak, with 271 projects/28,311 rooms and Tru by Hilton with 224 projects/21,518 rooms; Marriott’s TownePlace Suites with 204 projects/19,5693 rooms and Residence Inn with 203 projects/25,132 rooms; IHG’s Avid Hotel with 152 projects/13,255 rooms and Staybridge Suites with 122 projects/12,564 rooms.

In the third quarter alone, Marriott opened 60 new hotels/7,882 rooms accounting for 30% of all new hotel rooms that opened in the U.S. Hilton opened 45 new hotels/4,923 rooms accounting for 19% of newly opened rooms and IHG opened 25 new hotels in Q3/2,459 rooms accounting for 9% of rooms. Year-to-date, through the end of the third quarter in 2021, Marriott has opened 212 new hotels/28,298 rooms accounting for 32% of new hotels and 33% of new rooms; Hilton has opened 169 new hotels/21,786 rooms, accounting for 25% of new hotels and 26% of newly opened rooms, and IHG opened 98 new hotels/9,828 rooms, accounting for 15% of new hotels and 12% of rooms opened in the U.S.

The LE forecast for new hotel openings in 2021 anticipates that Marriott will open 243 projects/32,944 rooms by year-end. Hilton is expected to open a total of 207 projects/26,056 rooms in 2021, and IHG is on track to open 145 projects/14,451 rooms. In 2022, LE forecasts Marriott will open 245 new hotels/31,470 rooms, IHG will open 204 new hotels/20,737 rooms, and Hilton is expected to open 192 new hotels/22,090 rooms.

Related Stories

Hotel Facilities | Oct 27, 2020

Hotel construction pipeline dips 7% in Q3 2020

Hospitality developers continue to closely monitor the impact the coronavirus will have on travel demand, according to Lodging Econometrics.

Hotel Facilities | Sep 22, 2020

‘Lifestyle’ is adding new color to the select-service hotel sector

A new WATG Strategy white paper examines the design characteristics of the blending.

Giants 400 | Aug 28, 2020

2020 Giants 400 Report: Ranking the nation's largest architecture, engineering, and construction firms

The 2020 Giants 400 Report features more than 130 rankings across 25 building sectors and specialty categories.

Coronavirus | Aug 25, 2020

Video: 5 building sectors to watch amid COVID-19

RCLCO's Brad Hunter reveals the winners and non-winners of the U.S. real estate market during the coronavirus pandemic.

Hotel Facilities | Aug 14, 2020

5 strategies for creating safer, healthier hotel experiences

As hotels begin to reopen, the focus on health and safety takes priority while working to preserve the guest experience.

Hotel Facilities | Jun 25, 2020

Restoration of 1930s El Paso hotel completes

The project represented a cross-collaboration of Cooper Carry’s Hospitality studio and The Johnson Studio at Cooper Carry.

Hotel Facilities | Mar 25, 2020

Chicago's new Sophy Hotel

Completed in 2018, the seven-story, 98-guest room hotel complements the local museums, cultural attractions, and University of Chicago campus.

boombox1 - default
boombox2 -
native1 -

More In Category



Giants 400

Top 80 Hotel Construction Firms for 2023

Suffolk Construction, STO Building Group, PCL Construction Enterprises, AECOM, and Brasfield & Gorrie top BD+C's ranking of the nation's largest hotel and resort general contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.


Giants 400

Top 70 Hotel Engineering Firms for 2023

Jacobs, EXP, IMEG, Tetra Tech, and Langan top BD+C's ranking of the nation's largest hotel and resort engineering and engineering/architecture (EA) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021