For almost two full centuries, a 1.2-kilometer stretch of waterfront in Istanbul, Turkey, restricted access to the public. The area was being used as a cruise terminal, and allowed only maintenance, deliveries, and the 6,000 or so passengers disembarking from each ship to enter the fenced-off space.
A new master plan from Dror and Gensler, currently under construction, will reunite the general public with this stretch of waterfront by moving the terminal operations underground.
The feature that made this below-grade relocation possible is a first-of-its-kind hydraulic boardwalk and gangway system, invented in collaboration with Miami-based BEA Architects. When not in use, the system is completely hidden underground. When a cruise ship docks, the boardwalk hatch opens and becomes a perimeter wall to secure the area. The gangway then rises from its hiding spot underground to meet the ship doors and transport the passengers to the subterranean terminal levels. Once all passengers have disembarked and the ship leaves, the system retreats underground and the space is freed up for public use. The compact design requires a short strip of land that measures just 3.5 meters wide.
This clever solution gives more than 60,000 sm of accessible waterfront space back to the public. Plans call for a pedestrian-only neighborhood that features a mix of shops, restaurants, cultural attractions, and offices.
Courtesy Dror.
Courtesy Dror.
Courtesy Dror.
Related Stories
Great Solutions | Aug 23, 2016
Visual energy model database demystifies net-zero design
Diamond Schmitt Architects’ ecoMetrics tool allows its designers to quickly analyze solutions based on models from 44 LEED-certified projects.
Great Solutions | Aug 23, 2016
Reusable infection control barriers ease hospital renovation
Clark Construction Group pilots the Edge Guard system on the Fair Oaks (Va.) Hospital reconstruction project.
Great Solutions | Aug 23, 2016
Novel construction approach speeds K-12 school projects
The Folia system uses pre-engineered components to deliver school buildings at 20% less cost.
Great Solutions | Aug 23, 2016
Mobile emergency room arrives just in time for Alabama hospital
The MED-1 Mobile Hospital Unit serves as a lower-cost solution during construction of new ED.
Great Solutions | Aug 23, 2016
Durable coffeemaker brings a bit of comfort to job sites
The CoffeeBoxx is lightweight rust proof, dust proof, water resistant, and ultra durable.
Great Solutions | Aug 23, 2016
Reclaimed wood paneling adds color to retail and hospitality projects
Colorburst panels are available in four stock options—Robin Egg Blue, Viridian Green, Haute Pink, and Cascade White—as well as custom colors.
Great Solutions | Aug 23, 2016
Biophilic pods beat the shade when it comes to outdoor cooling
The Xylem concept by CallisonRTKL regulates outdoor thermal comfort through shading, air movement, water circulation, and a vegetated roof.
Great Solutions | Aug 23, 2016
Mini-grant R&D program pays off in a big way for AE firm
Created through funding from Little’s LaceUp program, the Center for Building Performance has helped the design firm win 14 new jobs since its inception.
Great Solutions | Aug 23, 2016
At Beyer Blinder Belle everyone’s seeing RED
The firm’s R&D initiative inspires its designers to develop ideas that could positively disrupt the practice.
Great Solutions | Aug 23, 2016
Virtual care facility serves remote patients, may reduce readmissions
Mercy’s new high-tech medical center equips its medical professionals to deliver care at the bedside of patients anywhere.