In designing this nature-inspired education center for the Sonoma Academy college prep school in Santa Rosa, Calif., the project team employed several creative design and engineering solutions to meet the owner’s strict sustainability and energy efficiency objectives.
The unusual building—a hybrid maker space, cooking lab, and learning facility—features geoexchange and radiant systems that drive down energy use and reduce water demand. The mechanical system captures waste heat from the ventilation air and refrigeration system in the commercial kitchen, and uses it for space heating and domestic hot water production. Native plants on the rooftop support local pollinators, provide insulation, keep the undersides of the photovoltaic arrays cool.
The building is one of just a handful of projects nationwide to seek certification through three green benchmark systems. It is on track to receive LEED Platinum, Living Building Challenge, and WELL certification this year, and is also on pace to earn LBC Material and Energy Petals.
Building Team — Submitting firm, architect WRNS Studio Owner Sonoma Acacemy Structural engineer Mar Structural Design Mechanical, plumbing engineer Interface Engineering Electrical engineer Integral Group General contractor XL Construction
General Information — Size 22,000 sf Construction cost Confidential Construction time September 2016 to January 2018 Delivery method Design-bid-build
RETURN TO THE 2018 BUILDING TEAM AWARDS LANDING PAGE
Related Stories
Architects | Jan 18, 2016
EHDD’s Monterey Bay Aquarium wins AIA Twenty-five Year Award
The aquarium set new technical standards for the building type, which still influence today, such as the flow-through seawater-based heat pump system, naturalistic exhibitions, and corrosion protection.
Building Team Awards | Apr 10, 2015
14 projects that push AEC teaming to the limits
From Lean construction to tri-party IPD to advanced BIM/VDC coordination, these 14 Building Teams demonstrate the power of collaboration in delivering award-winning buildings. These are the 2015 Building Team Award winners.
Building Team Awards | Apr 10, 2015
Prefab saves the day for Denver hospital
Mortenson Construction and its partners completed the 831,000-sf, $623 million Saint Joseph Hospital well before the January 1, 2015, deadline, thanks largely to their extensive use of offsite prefabrication.
Building Team Awards | Apr 10, 2015
Anaheim’s soaring intermodal hub
Anaheim's Regional Transportations Intermodal Center is the largest ETFE project in North America.
Building Team Awards | Apr 10, 2015
Virtual collaboration helps complete a hospital in 24 months
PinnacleHealth needed a new hospital STAT! This team delivered it in two years, start to finish.
Building Team Awards | Apr 10, 2015
New arts venue reinvigorates Virginia Tech's campus
The STV-led Building Team creates a world-class performance and arts venue with learning and entrepreneurial dimensions.
Building Team Awards | Apr 9, 2015
Multifaced fitness center becomes campus landmark
A sloped running track and open-concept design put this Building Team to the test.
Building Team Awards | Apr 9, 2015
Nation's first LEED-certified bus depot
A bus garage in Harlem shows that even the most mundane of facilities can strut its environmentally sensitive stuff.
Building Team Awards | Apr 9, 2015
Setting the bar for port-of-entry design
Whenever you eat a tomato from Mexico, there’s a one-in-three chance it came through this LEED Gold gateway.
Building Team Awards | Apr 9, 2015
Big D’s billion-dollar baby: New Parkland Hospital Tops the Chart | BD+C
Dallas’s new $1.27 billion public hospital preserves an important civic anchor, Texas-style.