In designing this nature-inspired education center for the Sonoma Academy college prep school in Santa Rosa, Calif., the project team employed several creative design and engineering solutions to meet the owner’s strict sustainability and energy efficiency objectives.
The unusual building—a hybrid maker space, cooking lab, and learning facility—features geoexchange and radiant systems that drive down energy use and reduce water demand. The mechanical system captures waste heat from the ventilation air and refrigeration system in the commercial kitchen, and uses it for space heating and domestic hot water production. Native plants on the rooftop support local pollinators, provide insulation, keep the undersides of the photovoltaic arrays cool.
The building is one of just a handful of projects nationwide to seek certification through three green benchmark systems. It is on track to receive LEED Platinum, Living Building Challenge, and WELL certification this year, and is also on pace to earn LBC Material and Energy Petals.
Building Team — Submitting firm, architect WRNS Studio Owner Sonoma Acacemy Structural engineer Mar Structural Design Mechanical, plumbing engineer Interface Engineering Electrical engineer Integral Group General contractor XL Construction
General Information — Size 22,000 sf Construction cost Confidential Construction time September 2016 to January 2018 Delivery method Design-bid-build
RETURN TO THE 2018 BUILDING TEAM AWARDS LANDING PAGE
Related Stories
Building Team Awards | Jun 24, 2019
14 projects earn BD+C's 2019 Building Team Awards
The McDonald's Headquarters, the Rancho Los Amigos National Rehabilitation Center, and Pacific Visions at the Aquarium of the Pacific are three of the projects awarded with BD+C's 2019 Building Team Awards.
Building Team Awards | Jun 21, 2019
Up, up and away: Dutch hospitality chain completes the world's tallest modular hotel
Honorable mention: At 21 stories (15 of them modular), it is the world’s tallest modular hotel.
Building Team Awards | Jun 20, 2019
PPP gets the job done: Three-party deal saves time and money for client
Bronze Award: Weitz, acting as developer and design-builder, leased the land and borrowed the money for the project.
Building Team Awards | Jun 20, 2019
Making waves: The façade of Pacific Visions suggests the movement of water, day and night
Bronze Award: The new wing holds an exhibition space, a state-of-the-art 300-seat theater with a 32-foot-tall, 180-degree arc, 130-foot-long projection wall.
Building Team Awards | Jun 19, 2019
Unsung heroes: Two hurricanes couldn't stop this project team
Bronze Award: St. Lucie County’s population exploded to the point where the hospital needed lots more space.
Building Team Awards | Jun 19, 2019
Crime fighter: San Diego County's new forensic facility helps battle crime in three ways
Silver Award: The 158,000-sf addition collocates three crime-fighting functions.
Building Team Awards | Jun 18, 2019
All that urban jazz: Mixed-use center lends a zing to downtown Washington's skyline
Bureaucratic architecture, be damned!
Building Team Awards | Jun 18, 2019
Eyesore no more: People come together to expand a much-needed daycare center
Silver Award: Two problems quickly emerged: high concentrations of arsenic in the soil, and stormwater runoff into nearby wetlands and neighboring properties.
Building Team Awards | Jun 17, 2019
Campus renewal: Community effort saves a crucial healthcare resource
Silver Award: Taylor Design (architect) and SmithGroup (AOR) led an integrated design-build team anchored by McCarthy Building Companies (GC).
Building Team Awards | Jun 13, 2019
In the spotlight: Kinder High School for the Performing and Visual Arts shines a new beacon on Houston’s downtown
Gold Award: Kinder High School, which can accommodate 750 9th through 12th graders, is one of only three public schools in the U.S. that offer programs for both visual and performing arts.