Duro-Last Duro-Bond Roofing System installed on New England warehouse

Sponsored Content Roofing

Duro-Last Duro-Bond Roofing System installed on New England warehouse

Breault Roofing created a way to make the installation process more efficient by requesting mostly tabless sheets and fastening the membrane with induction welding to the purlins instead of a regular mechanically fastened system onto the pan.


By Duro-Last | May 24, 2017

When one of New England’s premier manufacturing representative agencies purchased a new warehouse, it was clear from the beginning that the building’s existing standing seam roof needed to be replaced before the necessary internal improvements could begin.

The 27,500 square foot building purchased by EDOS Manufacturers’ Reps, Inc. was an existing metal structure with a standing seam metal roof that was severely rusted. The metal pan yielded pull test values of only 180 lbs., which is pushing the lower margin of acceptability by both industry and Duro-Last® engineering standards.

Building owner and President, Robert Os, hired authorized Duro-Last contractor, Breault Roofing of New Bedford, MA, to explore possible solutions. After considering the advantages of each system, Os decided to install the Duro-Last Duro- Bond® Roofing System. This system was viewed as the best option because of key features that set Duro- Last apart from the rest, such as the ability to custom-fabricate the membrane in house; providing edge-to- edge solutions including metals; Duro-Guard® insulation options, and offering a superior warranty.

Thanks to Duro-Last’s custom-fabrication process, the PVC sheets were custom engineered and manufactured to fit this specific project. Being an innovative Duro-Last contractor, Breault Roofing created a way to make the installation process more efficient by requesting mostly tabless sheets and fastening the membrane with induction welding to the purlins instead of a regular mechanically fastened system onto the pan.

“Purlin fastening meant the Duro-Bond plates were in straight lines. This simplified the installation and allowed the crew to work more quickly and efficiently,” said Scott Bieber, Duro-Last Business Development Manager.

 

 

Upon working with Duro-Last customer service and engineering services teams, Duro-Last was able to provide the contractor with the custom-fabricated tabless sheets with the addition of ridge tabs and eave tabs as requested. This resulted in a timely and efficient metal retrofit that used 10,000 less screws than normally required.

Despite taking place in December in Massachusetts, EDOS office manager, Lori Hamelin said, “There were no issues with business operations. Everything went rather smooth and we were able to stay open.” Os added to this by saying that, “The entire project was extremely well done and quick! The people installing it were great and the entire process was seamless.” Both Os and Hamlin also said they are likely to choose a Duro-Last Roofing System again in the future.

To learn more about the Duro-Bond system and other Duro-Last Roofing Systems contact us today at 800-280- 0280 or www.duro-last.com.

Related Stories

| Aug 11, 2010

Former Colorado Governor Bill Owens retained by PCL Construction as senior advisor

Bill Owens, former Colorado Governor, has been retained by PCL Construction as senior advisor for the company’s U.S. operations, headquartered in Denver, Colorado.  The PCL family of companies collectively form the seventh largest contracting organization in the U.S. with major offices in 29 locations across North America, the Hawaiian Islands, and the Caribbean.

| Aug 11, 2010

Green consultant guarantees LEED certification or your money back

With cities mandating LEED (Leadership in Energy and Environmental Design) certification for public, and even private, buildings in growing numbers, an Atlanta-based sustainability consulting firm is hoping to ease anxieties over meeting those goals with the industry’s first Green Guaranteed.

| Aug 11, 2010

Skanska, Turner most active in U.S. hotel construction, according to BD+C's Giants 300 report

A ranking of the Top 50 Hotel Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Gilbane, Whiting-Turner among nation's largest university contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 University Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit /giants

| Aug 11, 2010

Suffolk breaks ground on colorful charter school in Boston

Suffolk Education has broken ground and began renovations and construction of a new $39.6 million facility to house the Boston Renaissance Charter Public School. The Suffolk team is renovating an existing, three-story mill building and warehouse in the Hyde Park section of Boston, Massachusetts, and constructing a 20,000 square-foot addition.

| Aug 11, 2010

McCarthy, Skanska among nation's largest healthcare contractors, according to BD+C's Giants 300 report

A ranking of the Top 50 Healthcare Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Turner, Webcor, Hensel Phelps top BD+C's list of the 75 largest green contractors

With more than $3 billion in value of construction put in place for green buildings in 2008, Turner Construction tops BD+C’s ranking of the nation’s 75 largest green contractors, published as part of the Giants 300 report. Webcor Builders ($2.27 billion), Hensel Phelps Construction ($2.10 billion), The Whiting-Turner Contracting Co. ($1.97 billion), and Clark Group ($1.89 billion) round out the top five.

| Aug 11, 2010

Free waterproofing and roofing resource handbook available from American Hydrotech

American Hydrotech is now offering a waterproofing and roofing resource handbook for all architects and design community professionals. Topics include sustainable design, waterproof product specification, and proper installation techniques for use by building professionals in designing and waterproofing roof decks, plazas, vertical foundations, reflecting pools, and green roof applications. 

| Aug 11, 2010

Installation work begins on Minnesota's largest green roof

Installation of the 2.5 acre green roof vegetation on the City-owned Target Center begins today. Over the course of two days a 165 ton crane will hoist five truckloads of plant material, which includes 900 rolls of pre-grown vegetated mats of sedum and native plants for installation on top of the arena's main roof.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021