flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Deflection Bead case history: The Confluence

Sponsored Content Walls and Partitions

Deflection Bead case history: The Confluence

In multi-level buildings, the upper floors exert force upon the lower floors and can cause cracking of the drywall where the lower floor wall meets the ceiling, especially when the upper floors are subject to variable load, impact, or other unexpected forces.


By Trim-Tex | June 12, 2017

A rendering of the proposed apartment tower at 2166 15th St., Denver. Gromatzky Dupree and Associates (GDA Architects).

GDA Architects designed the $90 million Confluence building at Riverfront Park in Denver, Colorado as a modern 34-story tower. With 288 luxury multifamily apartments, the Confluence was designed to be the tallest building in Riverfront Park, requiring a solution for a common problem in multi-level buildings: interior finishing deflection cracks.

In multi-level buildings, the upper floors exert force upon the lower floors and can cause cracking of the drywall where the lower floor wall meets the ceiling, especially when the upper floors are subject to variable load, impact, or other unexpected forces. These cracks are unattractive and a frequent motivation for repair calls in buildings where they occur.

In designing The Confluence, GDA Architects had to resolve the possible deflection of the floors to ensure the integrity of the drywall below. They chose Trim-Tex Deflection Bead to absorb these forces and ensure a superior drywall finish. Deflection bead not only eliminates cracks, but also leaves a clean shadow line finish at the head of the wall.

 

(Left) Inside corner cracking. (Right) Blistering inside corner due to deflection.

 

Wall-Mounted Deflection Bead features a co-extruded flexible gasket that compresses and expands during architectural deflection to provide protection for as much as 7/16” of deflection. Deflection Bead also features a tear-off strip that acts as a masking guide to protect the concrete finish from mud. The strip is then easily removed during final sanding, leaving the wall with a clean, finished edge.

Trim-Tex Deflection Bead is permitted in both fire-rated and non-fire- rated assemblies. GDA paired it with Hilti’s Firestop Top Track Seal to achieve a wall that is fire-rated as well as cleanly finished and free of cracks. The combined system fills in the gap between metal tracks and imperfect concrete, as well as prevents smoke, air, and sound transfer.

Additionally, GDA Architects’ inclusion of Trim-Tex Deflection Bead offers peace of mind to the building’s owner, who will have lower building maintenance costs, and happier residents enjoying their beautiful, modern home.

For more information on Trim-Tex Deflection Bead visit www.trim-tex.com.

Related Stories

| Nov 2, 2010

11 Tips for Breathing New Life into Old Office Spaces

A slowdown in new construction has firms focusing on office reconstruction and interior renovations. Three experts from Hixson Architecture Engineering Interiors offer 11 tips for office renovation success. Tip #1: Check the landscaping.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 12, 2010

Holton Career and Resource Center, Durham, N.C.

27th Annual Reconstruction Awards—Special Recognition. Early in the current decade, violence within the community of Northeast Central Durham, N.C., escalated to the point where school safety officers at Holton Junior High School feared for their own safety. The school eventually closed and the property sat vacant for five years.

| Oct 12, 2010

Guardian Building, Detroit, Mich.

27th Annual Reconstruction Awards—Special Recognition. The relocation and consolidation of hundreds of employees from seven departments of Wayne County, Mich., into the historic Guardian Building in downtown Detroit is a refreshing tale of smart government planning and clever financial management that will benefit taxpayers in the economically distressed region for years to come.

| Oct 12, 2010

Owen Hall, Michigan State University, East Lansing, Mich.

27th Annual Reconstruction Awards—Silver Award. Officials at Michigan State University’s East Lansing Campus were concerned that Owen Hall, a mid-20th-century residence facility, was no longer attracting much interest from its target audience, graduate and international students.

| Sep 13, 2010

Second Time Around

A Building Team preserves the historic facade of a Broadway theater en route to creating the first green playhouse on the Great White Way.

| Aug 11, 2010

Using physical mockups to identify curtain wall design flaws

Part two of a five-part series on diagnosing and avoiding cladding, glazing, and roofing failures from building forensics expert IBA Consultants.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021