New L.A. Fire Station makes sparks along Hollywood Boulevard
The new Regional Fire Station No. 82 in Los Angeles was designed by RRM Design Group to complement the eclectic blend of architecture found along Hollywood Boulevard. The three-story, 32,000-sf station contains three heavy-apparatus bays, three paramedic bays, administrative offices, living quarters, and underground parking. A vegetated roofing system captures and treats on-site rainwater before it flows into the storm drainage system. The Building Team also includes Cornerstone Structural Engineering; Brummel, Myrick and Associates (mechanical); Thoma Electric (electrical); KOA Corp. (civil engineering); and Morillo Construction.
[pagebreak]
Senior memory care center opens its doors to Wisconsin communities
After eight months of construction, the new 29,500-sf Waterford (Wis.) Memory Care facility opened its doors to surrounding communities in July. Planned, designed, and built by PDC Midwest, the 31-bed center is situated adjacent to the existing Waterford Senior Living facility. An open dining room and activity spaces take advantage of natural daylight from large skylights. The center also features a large parlor with a stone fireplace, hair salon, and spa. A secured outdoor space allows residents to enjoy the natural beauty of the property.
[pagebreak]
Expansion adds 760,000-sf facility to children’s of Alabama hospital
The Benjamin Russell Hospital for Children is a 12-story, 760,000-sf, $400 million expansion at Children’s of Alabama, the state’s only freestanding pediatric hospital. Located one block north of the existing facility, the new hospital increases Children’s licensed beds from 275 to 332, with an additional 48 bassinets for neonatal intensive care. KLMK Group served as project manager. Other Building Team members included partnerships between HKS Inc. and Giattina Aycock Studio (architect) and Hoar Construction and KBR (construction manager).
[pagebreak]
New location in Lower Manhattan earns LEED Gold for Arup’s office
After relocating to a larger space in January 2012, the New York City office of engineering and consulting firm Arup received LEED Gold certification in October. The 100,000-sf space in Lower Manhattan consists of four floors connected by an internal stairway. Extensive use of LED lighting and daylighting cuts energy consumption, and low-flow toilets contribute to the office’s water efficiency. The project also received points for responsible materials procurement, such as a timber wall in the reception area that was repurposed from the Coney Island boardwalk.
Related Stories
Multifamily Housing | Feb 11, 2023
8 Gold and Platinum multifamily projects from the NAHB's BALA Awards
This year's top BALA multifamily winners showcase leading design trends, judged by eight industry professionals from across the country.
Multifamily Housing | Jan 12, 2023
8 noteworthy multifamily housing projects, including a refuge for unsheltered youth
Join us on a nationwide tour of notable new multifamily projects from around the country.
Adaptive Reuse | Dec 21, 2022
University of Pittsburgh reinvents century-old Model-T building as a life sciences research facility
After opening earlier this year, The Assembly recently achieved LEED Gold certification, aligning with the school’s and community’s larger sustainability efforts.
| Jul 11, 2014
First look: Jeanne Gang reinterprets San Francisco Bay windows in new skyscraper scheme
Chicago architect Jeanne Gang has designed a 40-story residential building in San Francisco that is inspired by the city's omnipresent bay windows.
| Apr 8, 2014
Fire resistive curtain wall helps The Kensington meet property line requirements
The majority of fire rated glazing applications occur inside a building to allow occupants to exit the building safely or provide an area of refuge during a fire. But what happens when the threat of fire comes from the outside? This was the case for The Kensington, a mixed-use residential building in Boston.
| Jan 28, 2014
2014 predictions for skyscraper construction: More twisting towers, mega-tall projects, and 'superslim' designs
Experts from the Council on Tall Buildings and Urban Habitat release their 2014 construction forecast for the worldwide high-rise industry.
| Jan 21, 2014
2013: The year of the super-tall skyscraper
Last year was the second-busiest ever in terms of 200-meter-plus building completions, with 73 towers, according to a report by the Council on Tall Buildings and Urban Habitat.
| Aug 30, 2013
Modular classrooms gaining strength with school boards
With budget, space needs, and speed-to-market pressures bearing down on school districts, modular classroom assemblies are often a go-to solution.
| May 1, 2013
World’s tallest children’s hospital pushes BIM to the extreme
The Building Team for the 23-story Lurie Children’s Hospital in Chicago implements an integrated BIM/VDC workflow to execute a complex vertical program.
| Apr 22, 2013
Top 10 green building projects for 2013 [slideshow]
The AIA's Committee on the Environment selected its top ten examples of sustainable architecture and green design solutions that protect and enhance the environment.