flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

COVID-19 alert: City conducts a 'virtual building inspection' to allow Starbucks and bank to open

Coronavirus

COVID-19 alert: City conducts a 'virtual building inspection' to allow Starbucks and bank to open

Bothell, Wash., issues a certificate of occupancy to developer after inspecting the property online. 


By Avalon Development | April 13, 2020
Starbucks in Bothell, Wash., gets CO through a virtual building inspection

This Starbucks and an adjacent bank in Bothell, Wash., were opened thanks to a virtual building inspection by the city. The coffeeshop's drive-thru has stayed open through the COVID-19 pandemic.

    

The Seattle bedroom community of Bothell, Wash., lies in one of the metro areas first hit by the COVID-19 crisis. There, a developer worked with the city to complete a virtual inspection, allowing the Starbucks-anchored development to open while the city was in the midst of the pandemic. The coffeeshop remains open via drive thru. 

The new Starbucks drive-thru in Bothell, at 22904 Bothell Everett Highway, was all prepped to open on March 27. But before the property owner, Avalon Development, could hand over the keys to the new 3,990-sf building to co-tenants Starbucks and Washington Federal bank, Avalon had to complete a final building safety inspection with a city government that was in the midst of temporarily shutting down all non-emergency services, including all in-person inspections.

“We were scrambling to get the Starbucks drive-thru open,” said Avalon Development Principal Scott Whittington. “We needed to get our final inspection, but the city and the state were in the midst of shutting down. Luckily, we have a great relationship with the city, and working with DB General Contractors and the local Starbucks real estate management team, we came up with a solution."

The solution: an on-site inspection via FaceTime, with the inspector on live video feed to confirm that the construction met all safety standards.  As a result of the virtual inspection, Avalon Development was issued the certificate of occupancy, allowing the businesses to open.

Thanks to the work-around, the opening of this all-new Starbucks drive-thru was only delayed by two days. “This is a testament of continued perseverance and dedication to craft that is awe-inspiring during this time of continued bad news,” said Garrett Johnson, Vice President at Avalon Development.

Related Stories

Office Buildings | Jun 28, 2023

When office-to-residential conversion works

The cost and design challenges involved with office-to-residential conversions can be daunting; designers need to devise creative uses to fully utilize the space.

Arenas | May 18, 2023

How can we reimagine live sports experiences?

A Gensler survey finds what sports fans' experiences have been like returning to arenas, and their expectations going forward.

Headquarters | May 15, 2023

The new definition of Class A property

Dan Cheetham, Managing Director and Founder of FYOOG, believes organizations returning to a "hub and spoke" model could have a profound effect on properties once considered Class B.

Office Buildings | May 5, 2023

9 workplace design trends for 2023

HOK Director of WorkPlace Kay Sargent and Director of Interiors Tom Polucci discuss the trends shaping office design in 2023.

Multifamily Housing | Apr 4, 2023

Acing your multifamily housing amenities for the modern renter

Eighty-seven percent of residents consider amenities when signing or renewing a lease. Here are three essential amenity areas to focus on, according to market research and trends.

Urban Planning | Mar 16, 2023

Three interconnected solutions for 'saving' urban centers

Gensler Co-CEO Andy Cohen explores how the global pandemic affected city life, and gives three solutions for revitalizing these urban centers.

Laboratories | Mar 9, 2023

5 laboratory design choices that accelerate scientific discovery

Stephen Blair, director of CannonDesign's Science & Technology Practice, identifies five important design strategies to make the most out of our research laboratories.

Augmented Reality | Jan 27, 2023

Enhancing our M.O.O.D. through augmented reality therapy rooms

Perkins Eastman’s M.O.O.D. Space aims to make mental healthcare more accessible—and mental health more achievable.

K-12 Schools | Nov 30, 2022

School districts are prioritizing federal funds for air filtration, HVAC upgrades

U.S. school districts are widely planning to use funds from last year’s American Rescue Plan (ARP) to upgrade or improve air filtration and heating/cooling systems, according to a report from the Center for Green Schools at the U.S. Green Building Council. The report, “School Facilities Funding in the Pandemic,” says air filtration and HVAC upgrades are the top facility improvement choice for the 5,004 school districts included in the analysis.

Giants 400 | Nov 14, 2022

4 emerging trends from BD+C's 2022 Giants 400 Report

Regenerative design, cognitive health, and jobsite robotics highlight the top trends from the 519 design and construction firms that participated in BD+C's 2022 Giants 400 Report.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021