Case studies

April 17, 2017

The University of Toronto’s $52.5 million, 126,788-square-foot Environmental Science & Chemistry Building is the newest addition to the Scarborough campus in Toronto, Ontario, Canada.

April 14, 2017

Located in Wilmington, Delaware, Nemours/duPont hospital has undergone a series of expansions since it was founded in the 1940s.

Photos by Tom Cwenar

April 14, 2017

In striving to create the greenest office tower in the world, PNC, Gensler and their partners constructed a building that was designed to surpass LEED Platinum certification.

April 12, 2017

Located throughout the city of Milwaukee and neighboring towns, MPS houses thousands of students.

SolarCity manufacturing plant at RiverBend in South Buffalo

April 06, 2017

Buffalo will be the first city to produce the first-ever true solar roof – a roofing product with solar panels built in.

The complete package of windows and doors

April 05, 2017

Combining product flexibility with outstanding performance, tall fiberglass windows and weather-friendly aluminum-clad wood doors were a natural choice for this mixed use building.

Custom WoodWorks® Channeled wall panels control acoustics in the College Football Hall of Fame and contribute to the formal atmosphere of the space.

April 04, 2017

Real wood veneer panels evoke warmth, texture, and color of a football.

March 21, 2017

The assembly used for this project was Duro-Guard EPS Flute Fill Combo as the base, and then Duro-Guard ISO HD and DensDeck® cover boards. 

Sherwood Park Mall, Alberta Canada - Pre-made Architectural Reveal Intersections kept the project on schedule while the mall remained opened during renovations.

March 20, 2017

With a tight school renovation budget and timeline, the Oak Grove Elementary cafeteria, designed by RuckPate Architects/CS2 Designs, utilized Architectural Reveals to build curving soffits with a racing stripe reveal design.

ASTM E-119 rated fire resistive glass and framing in this 2-hour stairwell adds vision, transparency and a connection to the outdoors while meeting code requirements. 

March 16, 2017

To preserve the building’s open design and to extend natural light further in the building, the architects incorporated fire resistive glazing in the areas that required a 2-hour fire rating, particularly in the stairwells and exit passageways.

Overlay Init