A modular construction solution to the mental healthcare crisis
Maria Ionescu, Senior Medical Planner, Stantec, shares a tested solution for the overburdened emergency department: Modular hub-and-spoke design.
HORIZONTV FEATURING BD+C: WATCH EPISODES ON DEMAND AT HORIZONTV
Maria Ionescu, Senior Medical Planner, Stantec, shares a tested solution for the overburdened emergency department: Modular hub-and-spoke design.
A fire station in Southern California leveraged prefab, modular construction for faster completion and future reconfiguration.
Virginia recently became the first state to adopt International Code Council/Modular Building Institute off-site construction standards.
With millions of shipping containers lying empty at ports around the world, it may seem like repurposing them to construct buildings would be a clear environmental winner. The reality of building with shipping containers is complicated, though, and in many cases isn’t a net-positive for the environment, critics charge, according to a report by NPR's Chloe Veltman.
Modular building is the growing trend of assembling structures from prefabricated, interchangeable components. After being constructed in a controlled environment away from the building site—such as a factory—the components are then transported to the final location and assembled on-site.
This growing collection of news, trends, case studies, white papers, and innovative projects bring you the latest in modular design and construction.
As setting foot on Mars becomes a more realistic goal, the search for how to best develop Architecture for the Red Planet is heating up.
The new branch doesn’t need much space for its ATM and new accounts and personal loans services.
New York-based CAZA designed the modular bus stops with the city’s extreme weather conditions in mind.
Guerdon Modular Buildings will produce 81 modules for this project.
Provides standards for indoor air quality, energy efficiency, materials, and waste management.
A prefab construction company in China built a 57-story tower in 19 days. Here’s how they did it.
BD+C’s inaugural Game Changers report highlights today’s pacesetting projects, from a prefab high-rise in China to a breakthrough research lab in the Midwest.
A $90 million rebuilding project in Yellowstone National Park exemplifies this trend.
This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.
The president of its FC Modular division says new projects are under consideration, even as competitors falter or fall by the wayside.