flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

ALPOLIC® Makes the Impossible Possible: Ryerson University Student Learning Centre

Sponsored Content Metals

ALPOLIC® Makes the Impossible Possible: Ryerson University Student Learning Centre

When they decided on a crystalline, gem-like appearance for the Student Learning Centre, they struggled to find a supplier who could provide materials for the building’s stunning faceted entryway and atrium within their budget.


By ALPOLIC | September 22, 2015
Ryerson University Student Learning Centre, Ontario, Canada ALPOLIC®/fr Custom Prismatic SEP Blue Finish.

Ryerson University Student Learning Centre, Ontario, Canada ALPOLIC®/fr Custom Prismatic SEP Blue Finish.

It’s said that Ryerson University can be found at the intersection of Mind and Action. Ryerson’s new Student Learning Centre can certainly be found there, although the actual street address is the intersection of Yonge and Gould, in the busy heart of Toronto, one of the world’s most vibrant and diverse cities.

Mohamed Lachemi, Ryerson University’s provost and vice president academic, says the Student Learning Centre project was already engaging the minds and actions of Ryerson students long before the first shovel was turned. “Students are part of everything we do at Ryerson,” Lachemi says. “Student groups in the hundreds were involved in the initial discussion about the building, the nature of the building, and also the function the building provides.”

In 2009, a competition was held to choose a design team to make what the students envisioned a reality. Zeidler Partnership Architects, a leading Canadian firm, joined forces with the celebrated international firm Snøhetta to win the competition. When they decided on a crystalline, gem-like appearance for the Student Learning Centre, they struggled to find a supplier who could provide materials for the building’s stunning faceted entryway and atrium within their budget. Terra cotta tiles were too heavy in the necessary sizes, and both glass-fiber reinforced plastic and welded sheet aluminum were prohibitively expensive and would take far too long to fabricate.

Fortunately, ALPOLIC and Flynn Canada was up to the task. ALPOLIC®/fr fire-retardant aluminum composite materials were easier to fabricate, more practical to install, and considerably more affordable than the alternatives. And Lumiflon® FEVE in ALPOLIC® Custom Prismatic SEP Blue Valfon® coatings supplied by Valspar allowed the architects to replicate the blue iridescence they originally envisioned in glazed tile. 

Ryerson University Student Learning Centre, Ontario, Canada ALPOLIC®/fr Custom Prismatic SEP Blue Finish

Yet another ambitious vision brought to life by ALPOLIC® materials.

See more photos of the Ryerson University Learning Centre and other projects 

Related Stories

| Jan 10, 2014

What the states should do to prevent more school shootings

To tell the truth, I didn’t want to write about the terrible events of December 14, 2012, when 20 children and six adults were gunned down at Sandy Hook Elementary School in Newtown, Conn. I figured other media would provide ample coverage, and anything we did would look cheap or inappropriate. But two things turned me around.

| Jan 10, 2014

Special Report: K-12 school security in the wake of Sandy Hook

BD+C's exclusive five-part report on K-12 school security offers proven design advice, technology recommendations, and thoughtful commentary on how Building Teams can help school districts prevent, or at least mitigate, a Sandy Hook on their turf.

| Jan 9, 2014

16 recommendations on security technology to take to your K-12 clients

From facial recognition cameras to IP-based door hardware, here are key technology-related considerations you should discuss with your school district clients.

| Dec 13, 2013

Safe and sound: 10 solutions for fire and life safety

From a dual fire-CO detector to an aspiration-sensing fire alarm, BD+C editors present a roundup of new fire and life safety products and technologies. 

| Dec 5, 2013

Exclusive BD+C survey shows reaction to Sandy Hook tragedy

More than 60% of AEC professionals surveyed by BD+C said their firms experienced heightened interest in security measures from school districts they worked with. 

| Nov 14, 2013

Tyco acquires Westfire Inc.

US Operations of Global Acquisition Strengthen Tyco SimplexGrinnell’s Special Hazards Fire Protection Capabilities for Mining, Telecommunications and Energy Markets

| Oct 27, 2013

SimplexGrinnell Awarded Contract by National Joint Powers Alliance for Streamlined Procurement of Fire and Life-Safety Solutions

Agreement Provides 50,000 Public Entities with Simplified Access to Comprehensive Suite of Products and Services

| Aug 23, 2013

The Exploratorium’s tall order

The newly-opened Exploratorium has brought energy and excitement to the city’s bustling waterfront.  EHDD transformed the historic Pier 15, built in 1915, to a 330,000 square foot indoor and outdoor campus, being touted as the largest net-zero building in the city and potentially the largest net-zero museum in the world.

| Aug 22, 2013

New CO-PLATE makes revenue generation through CO detector replacement easier

With the first round of system-connected carbon monoxide (CO) detectors reaching their end of life, there’s a big opportunity for dealers and installers to increase their revenue streams through CO detector replacements. System Sensor has launched a new CO-PLATE Carbon Monoxide Detector Plate to coincide with this opportunity. 

| Jul 12, 2013

Statue of Liberty Monument bolstered by Vetrotech Saint-Gobain’s fire-rated glass

The Statue of Liberty National Monument reopened to the public featuring two new fire stairwells and an elevator that will allow visitors with reduced mobility to look into the Statue’s interior structure. 

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021