flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

5 innovations in high-rise building design

High-rise Construction

5 innovations in high-rise building design

KONE's carbon-fiber hoisting technology is among the breakthroughs named 2013 Innovation Award winners by the Council on Tall Buildings and Urban Habitat.


By CTBUH and BD+C Staff | July 9, 2013
high rise building

The Poly Corporation Headquarters in Beijing features a unique design component, innovations in high-rise building design. 

  

The Council on Tall Buildings and Urban Habitat has named two winners and three finalists of its 2013 Innovation Award. The highlighted innovations stand to revolutionize the technology, sustainability, and efficiency of high-rise building construction and operation, according to the organization.
 
The Innovation Awards will be presented at the CTBUH 12th Annual Awards Ceremony and Dinner at the Illinois Institute of Technology, November 7, in the iconic Crown Hall, designed by Mies van der Rohe.
 
 
Here's an overview of the winners and finalists (descriptions and images courtesy CTBUH):
 
 
 
 

1. BSB Prefabricated Construction Process

 
The Broad Sustainable Building (BSB) Prefabricated Construction Process captured the industry’s attention when Broad Group constructed T30, a 30-story hotel building in 15 days in Changsha, China, using pre-assembled components.
 
The process uses a factory-fabricated steel structure system and on-site installation, using flanges and high-strength bolts to join the construction members. It also incorporates integrated, installable floor slabs, light wallboard, and other prefabricated materials.
 
It has the advantages of magnitude-9 earthquake resistance, five times the energy efficiency of a conventionally built structure, at between 10 and 30 percent lower cost. The process produces less than 1 percent of the waste when compared with conventional site-built construction.
 
“This is a clear and innovative way of looking at tall building construction," said Jeanne Gang, awards jury chair and principal of Studio Gang Architects. "Fundamentally rethinking how we build a tall building is fascinating, and this serves as a great platform for the next stage of development.”
 
 
 

 

2. KONE UltraRope for high rise buildings

 
 
KONE UltraRope is a new carbon-fiber hoisting technology, the weight and bending advantages of which effectively double the distance an elevator can travel in a single shaft – to 1,000 m (1 km).
 
Comprised of a carbon fiber core and an epoxy-based high-friction coating, KONE UltraRope is extremely light, meaning elevator energy consumption and machine room size in high-rise buildings can be cut significantly. 
 
The drop in rope weight means a reduction in elevator moving masses – the weight of everything that moves when an elevator travels up or down, including the hoisting ropes, compensating ropes, counterweight, elevator car, and passenger load. 
 
Currently, elevators are limited to a single-shaft height of  500 meters, the point at which the mass and thickness of steel rope makes further height impractical. With UltraRope, elevators can travel up to 1,000 meters without the need for transfer lobbies.
 
“This is finally a breakthrough on one of the ‘holy grail’ limiting factors of tall buildings – that is, the height to which a single elevator could operate before the weight of the steel rope becomes unsupportable over that height," said awards juror and CTBUH Executive Director Antony Wood. "So it is not an exaggeration to say that this is revolutionary. However, it is not just the enablement of greater height that is beneficial – the greater energy and material efficiencies are of equal value.”
 
 
 

 

3. Megatruss Seismic Isolation Structure

 
The jury awarded the Building Team's use of a megatruss seismic isolation structure on the Nakanoshima Festival Tower, Osaka, Japan
 
The designers of the multi-purpose high-rise in seismically active Japan were able to resolve two very different requirements in one building through the use of an intermediate structural solution that transfers forces safely through the transition. 
 
One part of the program was a concert hall, constructed out of reinforced concrete walls to form a rigid frame that supports sound isolation and acoustic performance. Above, the program called for offices, which are ideally column-free for maximum flexibility. 
 
The intermediate seismic isolation, comprised of a megatruss with diagonals, megacolumns, a belt truss, lead rubber bearings, and oil dampers, enables these contrasting requirements to coexist in the same building.
 
“This innovative structural system allowed the designers to construct an unprecedentedly tall seismically isolated building," said awards juror David Scott, Lead Structural Director of the Engineering Excellence Group at Laing O’Rourke. "It deserves recognition for integrating base isolation and transfer systems into isolated systems in a high seismic area.”
 
 
 

 

4. Raster Façade Precast Concrete System

 
The jury awarded the Building Team's use of a raster façade precast concrete system as used in Tour Total in Berlin.
 
The raster façade is a load-bearing precast concrete frame that eliminates interior columns, allowing floor-to-ceiling glass by way of triple-glazing with exterior retractable protective louvers. It also generates more usable floor area than other systems. 
 
The precast façade generates a ratio of 60 percent glazed to 40 percent closed surfaces, improving insulation values. Heating and cooling systems are integrated into suspended ceiling panels, which is more efficient than installing those systems in the floor. 
 
Precast concrete is also an inherently fireproof building material, eliminating the need for additional fire protection. 
 
“This innovation shows that load-bearing precast concrete offers an alternative to the glass curtain wall for tall building construction,” said awards juror Richard Cook, Partner, CookFox Architects.
 
 
 

 

5. Rocker Façade Support System

 
The jury awarded the Building Team's use of a rocker façade support system in the Poly Corporation headquarters high rise building in Beijing.
 
The Poly Corporation Headquarters features a unique design component that was created specifically for this building – The Rocker, which supports the world's largest cable-net glass wall while actively releasing the effects of earthquakes and heavy winds. Additionally, it facilitates the suspension of an eight-story, lantern-like museum structure within the office building’s atrium. 
 
Structural analysis showed that the support for the 22-story-tall glass atrium wall could not be reasonably achieved using a conventional two-way cable net, but could be achieved if the 90-meter-high by 60-meter-wide enclosure was broken down into smaller segments. A cable-stayed system was introduced by using two large-diameter parallel strand bridge cables in diagonal fold lines while anchoring to the eight-story suspended lantern-like museum structure. 
 
The museum structure acts as a counterweight for the cables, introducing pre-stress and providing the required stiffness to resist out-of-plane loads caused by wind on the cable-net. In addition to the diagonal cables used at the atrium glass wall, two additional cables and a Rocker were introduced at the rear of the museum structure to assist in its suspension.
 
“This innovation could be adapted for use in other situations that might be encountered in unique high-rise buildings, where brace-like members might need to be freed from participation in the lateral systems of the structures,” said Laing O’Rourke's Scott.
 
Photo by Terri Meyer Boake
 
 

For more, visit the CTBUH 2013 Innovation Awards landing page.

 
 
 
 

Related Stories

| May 20, 2014

Using fire-rated glass in exterior applications

Fire-rated glazing and framing assemblies are just as beneficial on building exteriors as they are on the inside. But knowing how to select the correct fire-rated glass for exterior applications can be confusing. SPONSORED CONTENT

| May 13, 2014

19 industry groups team to promote resilient planning and building materials

The industry associations, with more than 700,000 members generating almost $1 trillion in GDP, have issued a joint statement on resilience, pushing design and building solutions for disaster mitigation.

Sponsored | | May 3, 2014

Fire-rated glass floor system captures light in science and engineering infill

In implementing Northwestern University’s Engineering Life Sciences infill design, Flad Architects faced the challenge of ensuring adequate, balanced light given the adjacent, existing building wings. To allow for light penetration from the fifth floor to the ground floor, the design team desired a large, central atrium. One potential setback with drawing light through the atrium was meeting fire and life safety codes. 

| Apr 25, 2014

Recent NFPA 80 updates clarify fire rated applications

Code confusion has led to misapplications of fire rated glass and framing, which can have dangerous and/or expensive results. Two recent NFPA 80 revisions help clarify the confusion. SPONSORED CONTENT

| Apr 8, 2014

Fire resistive curtain wall helps The Kensington meet property line requirements

The majority of fire rated glazing applications occur inside a building to allow occupants to exit the building safely or provide an area of refuge during a fire. But what happens when the threat of fire comes from the outside? This was the case for The Kensington, a mixed-use residential building in Boston.

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

Sponsored | | Mar 30, 2014

Ontario Leisure Centre stays ahead of the curve with channel glass

The new Bradford West Gwillimbury Leisure Centre features a 1,400-sf serpentine channel glass wall that delivers dramatic visual appeal for its residents.

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

| Mar 12, 2014

14 new ideas for doors and door hardware

From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations. 

| Mar 7, 2014

Thom Mayne's high-tech Emerson College LA campus opens in Hollywood [slideshow]

The $85 million, 10-story vertical campus takes the shape of a massive, shimmering aircraft hangar, housing a sculptural, glass-and-aluminum base building.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021