flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

2021 Building Team Awards Entry Information

Building Team Awards

2021 Building Team Awards Entry Information

Only new construction projects completed on or after January 1, 2020 are eligible. Deadline for submissions: May 14, 2021.


By BD+C Staff | March 12, 2021
2021 Building Team Awards Entry Information

The design concept for the Pacific Visions wing is a sinuous biomorphic form achieved through a combination of steel and 839 glass panels that mimics water movement. Strategically placed downlights on 20-foot poles illuminate the building. Photos: Tom Bonner Photography.

    

 

WRITTEN STATEMENT OF SUPPORT — TIPS AND ADVICE

We want your project to win! Here are some tips to help you do so:

Think “50-50.”The Building Team Awards are judged by the editors and a distinguished panel of architects, engineers, contractors, developers, and academics. We’re looking for two things:

1) Design/engineering/construction quality and excellence (50%)
2) How the Building Team (architects, engineers, contractors, CMs, subcontractors, building owners, developers, government entities, etc.) collaborated to overcome obstacles and make the project succeed (50%)

To win, you have to “prove” both parts of the equation. For more on what the judges are looking for, see our handy "Tip Sheet."

Use these factors to shape your Written Statement of Support. You do not have to include information about every factor, only those that are pertinent to your project.

• Describe “obstacles,” “challenges,” “issues,” “problems” and how your team solved them. How did the team attack the problems posed by the project? Any new approaches? Innovations? Remember, give results, both quantitative (money saved, time saved, profitability, etc.) and qualitative (testimonials, quotes from a satisfied client, other “soft” evidence of success). Tell us what lessons you learned from the project.

• Show how you went beyond standard practice. Did your Building Team find an unusual solution to a problem? For example, did you develop a performance-based answer to a technical problem that went beyond the conventional design, engineering, or construction methods? Tell us how you “beat” the local building code or convinced a client to try an unusual technical solution. Our readers are interested in what’s new.

• Tell the judges why the project should win: At the outset of your written statement, state 4-5 reasons (in bullet-point fashion) why your submission deserves to win. 

• Be specific in describing “collaboration.” We get a lot of entries that say, “We held weekly meetings of the Building Team” or “We used Project Management software to keep in touch.” Unfortunately, that’s not enough. We want to know more details about how you worked together, especially how you worked with the owner, end users, and stakeholders, not just the A/E/C people. What kind of effort did you put into getting their views and implementing them? This is hard, but it’s important.

• Tell the “story” of the project. Winning projects should have a compelling story—getting a project built in record time, overcoming catastrophes, solving unexpected problems that come up in the course of the project. Yes, we want the technical details, but make sure the “human narrative” doesn’t get lost in your presentation.

• Let your images “sell” your entry. We get a lot of entries with great photos, diagrams, floor plans, etc., but with no explanation of how these photos or graphics support your case for winning. Important: Every photo and image you submit should illustrate a key point about your project.

• Describe “end user,” “client,” “customer,” and “public” involvement in detail. If you’re submitting a hospital project, how was the nursing staff involved? How about patients and their families? For a retail project—did you do any research on customer needs or preferences? For a museum or entertainment center, did you involve families and children in the planning and decision making? For public projects, how did you keep taxpayers, government officials, and ordinary citizens involved? Entries that demonstrate a strong commitment to assessing and meeting the needs of the ultimate “end users” (not just the one who’s paying the bill) often win.

• Don’t be afraid to toot your horn. We presume you will not exaggerate, but the judges do need to justify their decision, and you have the most complete information about your project. So, let us know if the project has won other awards. Include press clippings, reprints, etc. Get letters of support and testimonials from end users and clients, but make them specific—not “The team did a great job and were a pleasure to work with,” but “Through clever design and rigorous engineering and construction methods, the team saved our city $1.3 million in costs on this project.”

• You may supply financial information confidentially, if necessary. We understand that certain clients are sensitive about revealing financial details. Although we prefer to have all financial information included in the entry, if you have a situation where the client demands confidentiality, you may write “Confidential at Client Request” in the appropriate spaces on the entry form. However, to be eligible, you must also email (dbarista@sgcmail.com) the financial information to: David Barista, Editorial Director. As BD+C’s Editorial Director, I promise to keep the details of this information confidential and will only supply “ranges” of information to the judges as needed to help in their deliberations. Should your project win, the financial information will not be published in BD+C. This procedure is necessary to ensure that we are fair to all entries and the judges have enough information to do their job.

• Put yourself in the judges’ shoes. Ask yourself: Have I made a compelling case for our project? Is there logic to the presentation? Is it readable? Is the type large enough? Did I make it easy for the judges to grasp our argument? We’re not interested in fancy presentations. Use yellow marker to highlight key points. Point arrows to crucial details in drawings or photos. Underline key points. The judges have a lot of entries to review… make it easy for them to read yours.

• One last tip: Ask someone who is not familiar with the project to read your entry. If that person has questions, you might want to rework your submission.

 

PHOTO/GRAPHICS REQUIREMENTS

You must put all your images (JPEG or TIFF) into a PowerPoint file (at 72-dpi resolution), along with the high-resolution images in a separate folder, with captions for the PPT images explaining what the photo or image illustrates. Why did you choose this photo? How does it advance your entry? Use your images to make your case and sell your project to the judges. You must also place a file containing all your images at high-resolution (300 dpi) on the same flash drive (or file-sharing service), along with the file of your Written Statement of Support (in Word or PDF format), Project Information Sheet, and Payment Form (if paying by credit card) or check.

Note: DO NOT submit a binder with full-page printouts of your photos or images.

We’re not interested in fancy presentations. Use yellow marker to highlight key points. Point arrows to crucial details in drawings or photos. Underline key points. The judges have a lot of entries to review … make it easy for them to read yours.

 

 

SUBMISSION DEADLINE & REQUIRMENTS

Eligibility: Only new construction projects completed on or after January 1, 2020 are eligible.

Entry fee: The Building Team Awards entry fee is $250.

Entry deadline: May 14, 2021

Format: Send via a file-sharing service (like Dropbox, Box, or WeTransfer.com) with entry materials (PowerPoint presentation; separate folder with hi-res images; Written Statement of Support, Project Information Sheet, and Payment Sheet) by May 14, 2021, to David Barista, Editorial Director, dbarista@sgcmail.com.

We look forward to seeing your entry (or entries). Good luck!

Related Stories

Building Team Awards | Jun 8, 2017

Narrow site, broad vision: LA Metro Light Rail Operations & Maintenance Facility

Gold Award: A slender building site had direct implications for the design of this light-rail facility.

Building Team Awards | Jun 8, 2017

Missing link: Denver International Airport and Transit Center

Gold Award: A new mixed-use transit center fulfills Denver’s 28-year plan to improve access to the nation’s fifth-busiest airport.

Building Team Awards | Jun 7, 2017

Rising above adversity: National Museum of African American History and Culture

Gold Award: The Smithsonian Institution’s newest museum is a story of historical and construction resolve.

Building Team Awards | Jun 7, 2017

Justice league: United States courthouse

Gold Award: The Building Team for L.A.’s newest courthouse went way beyond what was expected.

Building Team Awards | Jun 7, 2017

Blurring the lines: University of Chicago North Residential Commons

Gold Award: The University of Chicago’s new Residential Commons is part campus, part community.

Building Team Awards | Jun 7, 2017

Rebuilding to heal: Sandy Hook Elementary School

Gold Award: Community involvement was paramount as Newtown, Conn., replaced the school where a mass shooting occurred.

Building Team Awards | Jun 6, 2017

Nerves of steel: 150 North Riverside

Platinum Award: It took guts for a developer and its Building Team to take on a site others had shunned for most of a century.

Building Team Awards | Jun 1, 2016

Multifamily tower and office building revitalize Philadelphia cathedral

The Philadelphia Episcopal Cathedral capitalizes on hot property to help fund much needed upgrades and programs.

Building Team Awards | Jun 1, 2016

Central utility power plant takes center stage at UC San Diego Jacobs Medical Center

An undulating roof, floor-to-ceiling glass, and façade scheme give visual appeal to a plant that serves the 10-story medical center.

Building Team Awards | May 31, 2016

Gonzaga's new student center is a bustling social hub

Retail mall features, comfortable furniture, and floor-to-ceiling glass add vibrancy to the new John J. Hemmingson Center.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021