flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

2012 Reconstruction Awards Entry Form

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.


May 24, 2012

Building Design+Construction's 29th Annual Reconstruction Awards

Entry Deadline: August 3, 2012

                                                                               

Project Information Sheet

 

Project Name and Location (city/state)

__________________________________________________________________________

Name of Firm Submitting This Entry

__________________________________________________________________________

Construction Start and Finish Dates

__________________________________________________________________________

Project Size (Gross Square Feet)

__________________________________________________________________________

Delivery Method/Contract Type (Design/Bid/Build, Design/Build, CM at Risk, etc.)

__________________________________________________________________________

*Total project Cost (required information)

__________________________________________________________________________

*You may supply financial information confidentially, if necessary.We understand that certain clients are sensitive about revealing financial details. Although we prefer to have the total project cost included in the entry, if you have a situation where the client demands confidentiality, you may write “Confidential at Client Request” in the space above.

However, to be eligible, you must also send, under separate cover, a single copy of the financial information to: Robert Cassidy, Editorial Director, BD+C, 3030 W. Salt Creek Lane, Ste. 201, Arlington Heights, IL 60005. As BD+C’s editor, I promise to keep the details of this information confidential and will only supply “ranges” of information to the judges as needed to help in their deliberations. Should your project win, the financial information will not be published in BD+C.This procedure is necessary to ensure that we are fair to all entries and the judges have enough information to do their job.

Principal Member Firms of the Building Team (required information)

Name of Person/Firm Submitting This Entry

Firm Name___________________________________________

Key Contact Person____________________________________

Street_______________________________________________

City_________________________________________________

State________________________________________________

Zip/Code_____________________________________________

Phone_______________________________________________

Email_______________________________________________

Owner/Developer

Firm Name__________________________________________

Key Contact Person___________________________________

Street______________________________________________

City________________________________________________

State_______________________________________________

Zip/Code____________________________________________

Phone______________________________________________

Email_______________________________________________

Architect or Architect/Engineer

Firm Name__________________________________________

Key Contact Person___________________________________

Street______________________________________________

City_______________________________________________

State______________________________________________

Zip/Code___________________________________________

Phone_____________________________________________

Email______________________________________________

Architect of Record (if different from above)

Firm Name_________________________________________

Key Contact Person__________________________________

Street_____________________________________________

City_______________________________________________

State______________________________________________

Zip/Code___________________________________________

Phone_____________________________________________

Email______________________________________________

Interior Architect (if different from above)

Firm Name_________________________________________

Key Contact Person__________________________________

Street_____________________________________________

City_______________________________________________

State______________________________________________

Phone_____________________________________________

Email______________________________________________

Structural Engineer

Firm Name_________________________________________

Key Contact Person__________________________________

Street_____________________________________________

City_______________________________________________

State______________________________________________

Zip/Code___________________________________________

Phone_____________________________________________

Email______________________________________________

Mechanical Engineer

Firm Name_________________________________________

Key Contact Person__________________________________

Street________­­­­­­_____________________________________

City_______________________________________________

State______________________________________________

Zip/Code___________________________________________

Phone_____________________________________________

Email______________________________________________

Electrical Engineer

Firm Name_________________________________________

Key Contact Person__________________________________

Street_____________________________________________

City_______________________________________________

State______________________________________________

Zip/Code___________________________________________

Phone_____________________________________________

Email______________________________________________

Plumbing Engineer

Firm Name_________________________________________

Key Contact Person__________________________________

Street_____________________________________________

City_______________________________________________

State______________________________________________

Zip/Code___________________________________________

Phone_____________________________________________

Email______________________________________________

General Contractor

Firm Name__________________________________________

Key Contact Person___________________________________

Street______________________________________________

City________________________________________________

State_______________________________________________

Zip/Code____________________________________________

Phone______________________________________________

Email_______________________________________________

Construction or Program Manager

Firm Name___________________________________________

Key Contact Person___________________________________

Street______________________________________________

City_________________________________________________

State________________________________________________

Zip/Code_____________________________________________

Phone_______________________________________________

Email________________________________________________

Photography Rights(required information)

Name of Photographer__________________________________

Photographer’s Firm _____­______________________________

Street_______________________________________________

City___________________________ State______ Zip________

Phone_________________ Email_________________________

Key contact person (if different from above)

____________________________________________________

Phone_________________ Email__________________________

Who owns the rights to the photographyyou are submitting with your entry?

[  ] Submitting firm owns all rights to photography (editorial use, marketing, advertising, Internet)

[  ] Submitting firm owns only rights to editorial use of photography; photographer owns all other rights.

[  ] Photographer owns all rights.

[  ] Submitting firm not sure what photography rights it owns.

Payment Information ($200.00 per entry)

Credit Card Type_______________________________________

Cardholder’s Name_____________________________________

Cardholder’s Address___________________________________

____________________________________________________

____________________________________________________

Credit Card Number____________________________________

Expiration Date________________________________________

Amount______________________________________________

Company name_______________________________________

Authorization (if other than cardholder)

____________________________________________________

Today’s Date_________________________________________

Check [  ] if you want a receipt.

If paying by check, please make payable to “SGC Horizon” +

Tags

Related Stories

Healthcare Facilities | Aug 28, 2015

Shhh!!! 6 ways to keep the noise down in new and existing hospitals

There’s a ‘decibel war’ going on in the nation’s hospitals. Progressive Building Teams are leading the charge to give patients quieter healing environments.   

| Dec 28, 2014

New trends in ceiling designs and materials [AIA course]

A broad array of new and improved ceiling products offers designers everything from superior acoustics and closed-loop, recycled content to eased integration with lighting systems, HVAC diffusers, fire sprinkler heads, and other overhead problems. This course describes how Building Teams are exploring ways to go beyond the treatment of ceilings as white, monolithic planes.

| Mar 18, 2014

Charles Dalluge joins DLR Group as president, COO

CEO Griff Davenport announces addition of Dalluge to executive leadership team

| Nov 19, 2013

Top 10 green building products for 2014

Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list. 

| Nov 18, 2013

ASSA ABLOY, CertainTeed team up to tackle classroom acoustics

The new alliance has uncovered easily accessible solutions to address these acoustical challenges and reduce the sound reverberation that further complicates noise issues.

| Apr 16, 2013

5 projects that profited from insulated metal panels

From an orchid-shaped visitor center to California’s largest public works project, each of these projects benefited from IMP technology.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 7, 2012

2012 BUILDING TEAM AWARDS: Fort Belvoir Community Hospital

A new military hospital invokes evidence-based design to create a LEED-certified facility for the nation’s soldiers and their families.

boombox1 - default
boombox2 -
native1 -

More In Category


Mass Timber

5 solutions to acoustic issues in mass timber buildings

For all its advantages, mass timber also has a less-heralded quality: its acoustic challenges. Exposed wood ceilings and floors have led to issues with excessive noise. Mass timber experts offer practical solutions to the top five acoustic issues in mass timber buildings.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021