Technologies and best practices provide path for better preparation.


By By BD+C Staff | March 21, 2012
According to a Ponemon Institute study, an outage can cost an organization an average of about $5,000 per minute. Thats $300,00

A list of 10 common surprises for data center/IT managers was released at AFCOM Data Center World Spring. The list includes information on a surprising cause of data center downtime, what data center managers might not know about that next server refresh, and the growing trend sneaking up on virtually every IT manager.

Ten common surprises:

 

 

 

 

  1. Those high-density predictions finally are coming true: After rapid growth early in the century, projections of double-digit rack densities have been slow to come to fruition. Average densities hovered between 6.0 and 7.4 kW per rack from 2006 to 2009, but the most recent Data Center Users’ Group (DCUG) survey predicted average rack densities will reach 12.0 kW within three years. That puts a premium on adequate UPS capacity and power distribution as well as cooling to handle the corresponding heat output.  
  2. Data center managers will replace servers three times before they replace UPS or cooling systems: Server refreshes happen approximately every three years. Cooling and UPS systems are expected to last much longer—sometimes decades. That means the infrastructure organizations invest in today must be able to support—or, more accurately, scale to support—servers that may be two, three or even four generations removed from today’s models. What does that mean for today’s data center manager? It makes it imperative that today’s infrastructure technologies have the ability to scale to support future needs. Modular solutions can scale to meet both short- and long-term requirements.
  3. Downtime is expensive: Everyone understands downtime is bad, but the actual costs associated with an unplanned outage are stunning. According to a Ponemon Institute study, an outage can cost an organization an average of about $5,000 per minute. That’s $300,000 in just an hour. The same study indicates the most common causes of downtime are UPS battery failure and exceeding UPS capacity. Avoid those problems by investing in the right UPS—adequately sized to support the load—and proactively monitoring and maintaining batteries.
  4. Water and the data center do not mix – but we keep trying: The first part of this probably isn’t a surprise. Sensitive IT equipment does not respond well to water. However, the aforementioned Ponemon study indicates 35% of all unplanned outages are a result of some type of water incursion. These aren’t just leaky valves; in fact, many water-related outages are the result of a spilled coffee or diet soda. The fix: Check those valves, but more importantly, check the drinks at the door.
  5. New servers use more power than old servers: Sever consolidation and virtualization can shrink server inventory by huge numbers, but that doesn’t exactly equate to huge energy savings. New virtualized servers, especially powerful blade servers, can consume four or five times as much energy as those from the preceding generation (although they usually do it more efficiently). The relatively modest savings at the end of that consolidation project may come as a surprise. There is no fix for this, but prepare for it by making sure the infrastructure is adequate to support the power and cooling needs of these new servers.
  6. Monitoring is a mess: IT managers have more visibility into their data centers than ever before, but accessing and making sense of the data that comes with that visibility can be a daunting task. According to an Emerson Network Power survey of data center professionals, data center managers use, on average, at least four different software platforms to manage their physical infrastructure. More than 40% of those surveyed say they produce three or more reports for their supervisors every month, and 34% say it takes three hours or more to prepare those reports. The solution? Move toward a single monitoring and management platform. Today’s DCIM solutions can consolidate that information and proactively manage the infrastructure to improve energy and operational efficiency and even availability.
  7.  The IT guy is in charge of the building’s HVAC system: The gap between IT and Facilities is shrinking, and the lion’s share of the responsibility for both pieces is falling on the IT professionals. Traditionally, IT and data center managers have had to work through Facilities when they need more power or cooling to support increasing IT needs. That process is being streamlined, thanks in large part to those aforementioned DCIM solutions that increase visibility and control over all aspects of a building’s infrastructure. Forward-thinking data center managers are developing a DCIM strategy to help them understand this expansion of their roles and responsibilities.
  8. That patchwork data center needs to be a quilt: In the past, data center managers freely mixed and matched components from various vendors because those systems worked together only tangentially. That is changing. The advent of increasingly intelligent, dynamic infrastructure technologies and monitoring and management systems has increased the amount of actionable data across the data center, delivering real-time modeling capabilities that enable significant operational efficiencies. IT and infrastructure systems still can work independently, but to truly leverage the full extent of their capabilities, integration is imperative.
  9. Data center on demand is a reality: The days of lengthy design, order and deployment delays are over. Today there are modular, integrated, rapidly deployable data center solutions for any space. Integrated, virtually plug-and-play solutions that include rack, server and power and cooling can be installed easily in a closet or conference room. On the larger end, containerized data centers can be used to quickly establish a network or to add capacity to an existing data center. The solution to most problems is a phone call away.
  10. IT loads vary – a lot: Many industries see extreme peaks and valleys in their network usage. Financial institutions, for example, may see heavy use during traditional business hours and virtually nothing overnight. Holiday shopping and tax seasons also can create unusual spikes in IT activity. Businesses depending on their IT systems during these times need to have the capacity to handle those peaks, but often can operate inefficiently during the valleys. A scalable infrastructure with intelligent controls can adjust to those highs and lows to ensure efficient operation. BD+C

Related Stories

Construction Costs | Feb 27, 2024

Experts see construction material prices stabilizing in 2024

Gordian’s Q1 2024 Quarterly Construction Cost Insights Report brings good news: Although there are some materials whose prices have continued to show volatility, costs at a macro level are returning to a level of stability, suggesting predictable historical price escalation factors. 

High-rise Construction | Feb 23, 2024

Designing a new frontier in Seattle’s urban core

Graphite Design Group shares the design for Frontier, a 540,000-sf tower in a five-block master plan for Seattle-based tech leader Amazon.

Construction Costs | Feb 22, 2024

K-12 school construction costs for 2024

Data from Gordian breaks down the average cost per square foot for four different types of K-12 school buildings (elementary schools, junior high schools, high schools, and vocational schools) across 10 U.S. cities.

MFPRO+ Special Reports | Feb 22, 2024

Crystal Lagoons: A deep dive into real estate's most extreme guest amenity

These year-round, manmade, crystal clear blue lagoons offer a groundbreaking technology with immense potential to redefine the concept of water amenities. However, navigating regulatory challenges and ensuring long-term sustainability are crucial to success with Crystal Lagoons.

Architects | Feb 21, 2024

Architecture Billings Index remains in 'declining billings' state in January 2024

Architecture firm billings remained soft entering into 2024, with an AIA/Deltek Architecture Billings Index (ABI) score of 46.2 in January. Any score below 50.0 indicates decreasing business conditions.

University Buildings | Feb 21, 2024

University design to help meet the demand for health professionals

Virginia Commonwealth University is a Page client, and the Dean of the College of Health Professions took time to talk about a pressing healthcare industry need that schools—and architects—can help address.

AEC Tech | Feb 20, 2024

AI for construction: What kind of tool can artificial intelligence become for AEC teams?

Avoiding the hype and gathering good data are half the battle toward making artificial intelligence tools useful for performing design, operational, and jobsite tasks.

Engineers | Feb 20, 2024

An engineering firm traces its DEI journey

Top-to-bottom buy-in has been a key factor in SSOE Group’s efforts to become more diverse, equitable, and inclusive in its hiring, mentoring, and benefits.

Building Tech | Feb 20, 2024

Construction method featuring LEGO-like bricks wins global innovation award

A new construction method featuring LEGO-like bricks made from a renewable composite material took first place for building innovations at the 2024 JEC Composites Innovation Awards in Paris, France.

Codes and Standards | Feb 20, 2024

AISC, AIA release second part of design assist guidelines for the structural steel industry

The American Institute of Steel Construction and AIA Contract Documents have released the second part of a document intended to provide guidance for three common collaboration strategies.

boombox1 - default
boombox2 -
native1 -

More In Category

Student Housing

Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.


Construction Costs

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021