Most Recent in News Building Technology

on July 15,2014

Modular construction is more than a century old, and throughout its lifespan, the methods have been readapted to meet specific needs of different eras.

All renderings courtesy Penda
on July 14,2014

Beijing-based design cooperative Penda designed a bamboo hotel that can easily expand vertically or horizontally.

Photo: Jacopo Werther via Wikimedia Commons
on June 25,2014

The Studio is the first to be launched as part of the AIA Foundation’s National Resilience Program, which plans to open a total of five Regional Resilience Design Studios nationwide in collaboration with Architecture for Humanity, and Public Architecture.

Latest in Building Technology

Gilbane invested $60,000 to acquire its first 3D laser scanner, the FARO Focus 3
on July 01,2014 in Feature

From energy modeling on the fly to prefabrication of building systems, these advancements are potential game changers for AEC firms that are...

Having the correct model views loaded and visibility settings adjusted prior to
on July 01,2014 in Feature

Process mapping, split models, and streamlined coordination meetings are among the timesaving techniques AEC firms are employing to improve BIM/...

on May 22,2014 in Feature

Data center design specialist SPARCH creates a modular scheme for solutions provider Digital Realty.