Arena

Most Recent in News Arena

on July 03,2014

The United States Tennis Association (USTA) and ROSSETTI, the architect of record for the Arthur Ashe Stadium, tapped Birdair to supply a 210,000-square-foot, PTFE membrane, retractable roof, expected to be installed by 2016. 

Photo: Pedro Lopez via Wikimedia Commons
on June 18,2014

In conjunction with the 2014 FIFA World Cup in Brazil, the U.S. Green Building Council (USGBC) announced that six World Cup stadiums have achieved LEED certification, including South America’s largest stadium, Maracanã in Rio de Janeiro.

Using 3D printing, Arup engineers were able to design and fabricate this lightwe
on June 18,2014

The firm's research shows that 3D printing has the potential to reduce costs, cut waste, and slash the carbon footprint of the construction sector.

Latest in Arena

For the west façade of the 77,000-sf Farm Credit Services of America Corporate O
on July 07,2014 in Feature

From wild architectural shapes to unique color blends and pattern arrangements, these projects demonstrate the design possibilities of brick....

Rubber floor tiles in 24x24-inch modules were water-jet cut to accommodate custo
on July 02,2014 in Feature

Rectangular tiles, digital graphic applications, the resurgence of terrazzo, and product transparency headline today’s commercial flooring trends...

The city of Buffalo hired a team of professionals to execute assessments for mor
on June 08,2014 in Feature

Over the past few years, Buffalo has developed a cutting-edge facility management program to ensure it's utilizing its facilities and operations...