Higher Education

Radnor Middle School features the latest technologies developed for lowering ene

Radnor Middle School features the latest technologies developed for lowering energy and operating costs, including green roofs,

May 21, 2012 | Posted by Tim Gregorski, Senior Editor

Radnor Middle School among the most sustainable schools in the U.S.

The 4.2-million-sf (389,980-square-meters) project has been designed to LEED go

The 4.2-million-sf (389,980-square-meters) project has been designed to LEED gold standards with a high performance envelope, o

May 14, 2012 | Posted by Tim Gregorski, Senior Editor

The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room,...

read more
Matthew L. Brace

Matthew L. Brace

May 11, 2012 | Posted by Tim Gregorski, Senior Editor

Stevens also elected to board of directors and vice-chair.

The 2010 interior renovation transformed an existing 1980s library into a dynami

The 2010 interior renovation transformed an existing 1980s library into a dynamic gathering place and center of teaching, learni

May 09, 2012 | Posted by Tim Gregorski, Senior Editor

The design challenges included creating an entry sequence to orient patrons and highlight service...

read more
The City Year transformation took place within the short time frame of one week

The City Year transformation took place within the short time frame of one week and included a custom designed bookcase, tile ca

May 08, 2012 | Posted by Tim Gregorski, Senior Editor

City Year representatives came to Gensler for their assistance in the transformation of the organ...

read more
May 08, 2012 | Posted by Tim Gregorski, Senior Editor

Projects completed on behalf of property owner, White Oak Realty Partners, LLC, Pearlmark Realty...

read more
UNT students and staff get hands-on experience working with green technologies a

UNT students and staff get hands-on experience working with green technologies at the new Zero Energy Research Laboratory.

May 03, 2012 | By Tim Gregorski, Senior Editor

The living lab—the only one of its kind in Texas—is designed to test various technologies and sys...

read more

In bringing back the luster of the original redstone brick faade at the University of Vermonts Redstone Hall, originally built

May 02, 2012 | By C.C. Sullivan and Barbara Horwitz-Bennett

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online e...

read more
The construction of Holly Ridge and Gardenia Way finished several months ahead o

The construction of Holly Ridge and Gardenia Way finished several months ahead of schedule, allowing students to migrate to the

May 02, 2012 | Posted by Tim Gregorski, Senior Editor

New student housing buildings are part of UCLA’s Northwest Campus Student Housing In-Fill Project...

April 26, 2012 | By BD+C Staff

On Sept. 29, 2012, participants from all over the world will volunteer to make the schools and ca...

read more
The Freshwater Skyscraper will be able to irrigate a one-hectare field of tomato

The Freshwater Skyscraper will be able to irrigate a one-hectare field of tomatoes per day.

April 25, 2012 | By Jeanne Roberts

The Freshwater Skyscraper will address the issue of increasing water scarcity through a process k...

read more
April 25, 2012 | By BD+C Staff

The build-out will consist of the construction of new offices, meeting rooms, video rooms and a s...

read more
The complex includes 560 private patient rooms, 33 state-of-the-art operating ro

The complex includes 560 private patient rooms, 33 state-of-the-art operating rooms, and expansive new adult and pediatric emerg

April 18, 2012 | By BD+C Staff

The Charlotte R. Bloomberg Children’s Center and the Sheikh Zayed Tower create transformative pat...

read more
Construction on UNTs new facility began in July 2011. A ribbon cutting ceremony

Construction on UNTs new facility began in July 2011. A ribbon cutting ceremony will be held at UNTs Discovery Park on Friday,

April 16, 2012 | By BD+C Staff

Lab to test energy technologies and systems in order to achieve a net-zero consumption of energy....

Connecting with the Regenstein Hall of Music, the building enables the Bienen Sc

Connecting with the Regenstein Hall of Music, the building enables the Bienen School to consolidate its programs for the first t

April 13, 2012 | By BD+C Staff

The showcase facility is the recital hall, an intimate, two-level space with undulating walls of...

read more
C.W. Driver utilized a variety of sustainable building practices during construc

C.W. Driver utilized a variety of sustainable building practices during construction, contributing to the centers LEED Gold cer

April 11, 2012 | By BD+C Staff

The state-of-the-art fitness center supports university’s goal to encourage student recruitment a...

read more
Construction is now under way on the Valencia College West Campus Building 10, a

Construction is now under way on the Valencia College West Campus Building 10, a new $13.3 million, 59,511-sf facility in Orland

March 27, 2012 | By BD+C Staff

Project led by design-build team of SchenkelShultz Architecture and McCree General Contractors, b...

read more
The $110 million Math and Science Building occupies the area immediately east of

The $110 million Math and Science Building occupies the area immediately east of the existing Learning and Resource Building and

March 26, 2012 | By BD+C Staff

Designed by Architects | Delawie Wilkes Rodrigues Barker, the new San Diego Mesa College Math and...

read more
The Ball State geothermal heating and cooling system will save $2 million annual

The Ball State geothermal heating and cooling system will save $2 million annually in operating costs and cut its carbon footpri

March 26, 2012 | By BD+C Staff

Ball State's geothermal system will replace four aging coal-fired boilers to provide renewable po...

read more
March 14, 2012 | By BD+C Staff

Building will house research into personalized, gene-based cancer screening and treatment.

The CornellNYC Tech campus, which will house the Technion-Cornell Innovation Ins

The CornellNYC Tech campus, which will house the Technion-Cornell Innovation Institute, will be a new type of academic enterpris

March 07, 2012 | By BD+C Staff

Each of the firms will be asked to assemble a team of consultants and prepare for an interview to...

read more
Site constraints led to the configuration of the building as a continuous ribbon

Site constraints led to the configuration of the building as a continuous ribbon stretched along the edge of a large, open plane

March 06, 2012 | By BD+C Staff

The second phase of the project, which includes the academic buildings and the lacrosse and footb...

read more
JJCs Facility Services Building is part of a $220 million master plan aimed at

JJCs Facility Services Building is part of a $220 million master plan aimed at transforming the colleges approach to sustainab

March 06, 2012 | By BD+C Staff

With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services...

read more
A rendering of the new 122,000-sf Library & Learning Commons at Salem State Univ

A rendering of the new 122,000-sf Library & Learning Commons at Salem State University.

February 28, 2012 | By BD+C Staff

When it opens to students in the fall of 2013, the $60 million facility will offer new archival s...

read more
In addition to these recently awarded projects, Perkins Eastman has several proj

In addition to these recently awarded projects, Perkins Eastman has several projects underway in the region, including Wuhan Int

February 22, 2012 | By BD+C Staff

Recent awards, project progress signal ongoing commitment to region.

Serving a population of more than 7,000 students, the centers mission is to eng

Serving a population of more than 7,000 students, the centers mission is to engage the campus community in recreation and welln

February 14, 2012 | By BD+C Staff

 

Designed by SmithGroup, the JJR_Center for Human Performance offers enhanced fitness o...
read more
January 30, 2012 | By BD+C Staff

Siemens contributes training modules and technology to support hands-on courses.

January 19, 2012 | By BD+C Staff

The Odebrecht Award for sustainable development rewards future leaders in engineering and chemist...

read more
January 04, 2012 | By BD+C Staff

Construction is scheduled to begin in June 2012, and will be completed by December 2012.

Maj. Gen. Harry George Armstrong Complex at Wright-Patterson Air Force Base

The 680,000-sf complex, which consists of two main buildings and ancillary facilities, represents the largest construction proje

January 04, 2012 | By BD+C Staff

The academic-style facility supports education/training and research functions, and contains clas...

read more
Overlay Init